Project Details

Search


File Number
SF1922
Project Name
Rollin Ridge Final Plat.
Description
A request for final plat approval to create 16 single-family residential lots and 2 tracts
Location
3285 Hodgen Road
Parcels
6127000064 6127000064 6127000065 6127000065
Applicant
Land Resource Associates (LRA)
David Jones ( chipita1@comcast.net )
(719) 684-2298
David Jones ( chipita1@comcast.net )
(719) 684-2298
EA Number
EA17059
File Prefix
SF - Final Plat
Year
2019
Project Manager
Ryan Howser
Status
Closed
Created
10/7/2019 4:28:29 PM

View: Review Comments


Approved Documents (8)

Link Document
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Construction Drawings (Plans/Profiles)
View Grading & Erosion Control Plan
View Storm Water Management Plan (SWMP)
View Drainage Report - Final
View Traffic Impact Study
View Financial Assurance Forms
View Signage and Striping Plan


Additional Documents (22)

Link Document Comment
View State Water Engineer Letter
View Notice of Public Hearing
View Photos - Public Notice Completed Public Notice Posting
View PC SR SF-19-022 with attachments
View PC Staff Report
View PC Approval Letter
View BoCC Approval Letter
View PC Resolution
View Recording Items
View Recorded Plat
View Recorded SIA
View Recorded Certificate Good Standing
View Recorded Enumerations
View Recorded Easement-ROW
View Recorded Covenants
View Recorded HOA
View TOPSOIL TYPICAL shoulder detail approved
View Rollin Rdg F1-Pavement-approved
View Certification Letter - approved
View GEC as-built - approved
View Meeting to discuss New Commercial Plat 8/22/2023
View 22-388 Rollin Ridge Filing 1 PA


Review Documents (53)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 10/30/2019 2:52:32 PM
View Application/Petition Form 10/30/2019 2:52:33 PM
View Legal Description (MS WORD Version required) 10/30/2019 2:52:40 PM
View Letter of Intent 3/9/2020 3:22:33 PM
View OWTS Report 3/9/2020 3:22:34 PM
View Title Commitment (Current within 30 days of submittal) 3/11/2020 1:49:06 PM
View Vicinity/Location Map 10/30/2019 2:52:44 PM
View As-Builts 3/2/2023 10:22:19 AM
View Erosion and Stormwater Quality Control Permit (ESQCP) 10/16/2020 1:10:44 PM
View Grading & Erosion Control checklist 10/16/2020 1:25:18 PM
View Mineral Rights Certification 10/30/2019 2:52:40 PM
View MS4 Post Construction Form 10/16/2020 1:25:17 PM
View PBMP Applicability Form 10/16/2020 1:25:19 PM
View PDB/BMP Operations & Maintenance Manual 10/16/2020 1:25:18 PM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 10/16/2020 1:25:17 PM
View SWMP checklist 10/16/2020 1:25:19 PM
View Construction Drawings (Plans/Profiles) 10/16/2020 1:10:41 PM
View Final Plat Drawings 5/14/2020 3:18:49 PM
View Grading & Erosion Control Plan 10/16/2020 1:10:44 PM
View Storm Water Management Plan (SWMP) 10/16/2020 1:25:15 PM
View Detention Basin Certification Letter 3/2/2023 10:22:20 AM
View Electric Provider Commitment Letter 10/30/2019 2:52:34 PM
View Fire Commitment Letter 10/30/2019 2:52:36 PM
View Natural Gas Commitment Letter 11/13/2019 11:10:13 AM
View Drainage Report - Final 10/16/2020 1:10:42 PM
View Fire Protection Report 9/8/2020 3:24:32 PM
View Soils & Geology Report 3/9/2020 3:22:32 PM
View Subdivision Summary Sheet 10/30/2019 2:52:43 PM
View Traffic Impact Study 10/16/2020 10:29:56 AM
View Wetland Impact Letter 7/22/2020 12:45:42 PM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 10/16/2020 10:29:54 AM
View Signed court decrees, including augmentation plans 10/30/2019 2:52:42 PM
View Water Quality Report 10/30/2019 2:52:44 PM
View Water Resources Report 10/30/2019 2:52:45 PM
View Water Supply Information Summary 10/30/2019 2:52:45 PM
View Well Permits (if water source is wells) 10/30/2019 2:52:46 PM
View Declaration of Covenants (MS Word version required) 9/8/2020 3:11:46 PM
View HOA articles of incorporation 10/30/2019 2:52:39 PM
View HOA bylaws (MS Word version required) 10/30/2019 2:52:39 PM
View Secretary of State Certification 10/30/2019 2:52:41 PM
View Water conveyance deeds and 300-year augmentation supply to HOA (MS Word version required) 10/30/2019 2:59:26 PM
View Civil CAD Base Drawing - Existing 10/16/2020 1:10:45 PM
View Civil CAD Base Drawing - Proposed 10/16/2020 1:10:46 PM
View Closures Sheet (Survey) 10/30/2019 2:52:33 PM
View Estimate of Guaranteed Funds 10/16/2020 1:10:42 PM
View Final Plat DWG file w State coordinates 10/16/2020 10:38:54 AM
View Financial Assurance Forms 9/8/2020 3:15:38 PM
View HOA Minutes 7/22/2020 12:45:42 PM
View Petition for Inclusion into PID 6/5/2020 3:49:02 PM
View Proof of submittal of non-jurisdictional water impoundment structure form 10/16/2020 10:29:56 AM
View Signage and Striping Plan 10/16/2020 10:29:57 AM
View Subdivision Improvement Agreement (MS Word version required) 7/22/2020 12:45:41 PM
View SWD to Lot Owners 10/30/2019 2:59:27 PM



Events (218)

Date Comment
3/9/2023 4:46:07 PM Project Closed
3/9/2023 4:46:07 PM Project Approved: 3/9/2023
3/9/2023 10:07:32 AM Request for Review Comments returned by PCD Engineering Division
3/2/2023 12:09:30 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/2/2023 12:09:26 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/2/2023 12:08:19 PM Submission Triaged
3/2/2023 10:22:43 AM Submission received from Applicant
12/7/2022 1:25:26 PM Submission request sent to Applicant
12/7/2022 10:06:04 AM Request for Review Comments returned by PCD Engineering Division
11/22/2022 8:25:04 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/22/2022 8:23:59 AM Submission Triaged
11/21/2022 10:40:34 AM Submission received from Applicant
10/23/2022 11:16:18 AM Request for Review Comments returned by EPC Stormwater Review
10/18/2022 10:15:31 AM Submission request sent to Applicant
10/17/2022 3:38:11 PM Request for Review Comments returned by PCD Engineering Division
9/21/2022 4:51:51 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/21/2022 4:51:49 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/21/2022 4:50:27 PM Project reopened for Review Comments
9/21/2022 4:00:52 PM Submission Triaged
9/21/2022 2:30:56 PM Submission received from Applicant
9/21/2022 8:23:35 AM Submission request sent to Applicant
9/15/2022 1:55:31 PM Submission request sent to Applicant
9/15/2022 1:47:06 PM Project Manager Assigned: Ryan Howser
3/13/2021 3:04:06 PM Project Closed
3/13/2021 3:04:05 PM Project Approved: 3/13/2021
11/30/2020 3:03:36 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
10/26/2020 12:03:29 PM Request for Review Comments returned by PCD Project Manager
10/21/2020 7:26:10 AM Request for Review Comments returned by PCD Engineering Division
10/17/2020 6:39:43 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Nina Ruiz on behalf of PCD Project Manager
10/17/2020 6:39:37 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/17/2020 6:37:36 AM Submission Triaged
10/16/2020 1:26:15 PM Submission received from Applicant
10/15/2020 5:11:53 PM Submission request sent to Applicant
10/12/2020 8:15:00 AM Request for Review Comments returned by PCD Project Manager
10/7/2020 11:29:09 AM Submission request sent to Applicant
10/6/2020 9:29:12 PM Request for Review Comments returned by County Attorney - Development Review
10/6/2020 10:02:35 AM Request for Review Comments returned by Pikes Peak Regional Building Department
10/6/2020 8:48:30 AM Request for Review Comments returned by PCD Engineering Division
9/16/2020 5:23:03 AM Submission Triaged
9/15/2020 10:37:35 AM Submission received from Applicant
9/12/2020 6:48:07 AM Submission request sent to Applicant
9/10/2020 5:31:06 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
9/10/2020 5:31:04 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
9/10/2020 5:31:03 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
9/10/2020 5:31:02 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Nina Ruiz on behalf of PCD Project Manager
9/10/2020 5:31:00 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/10/2020 5:16:18 AM Submission Triaged
9/9/2020 1:34:41 PM Request for Review Comments returned by EPC Health Department
9/8/2020 3:25:14 PM Submission received from Applicant
9/1/2020 9:26:55 AM Request for Review Comments returned by EPC Parks Department
8/27/2020 10:53:48 AM Request for Review Comments returned by Parks Advisory Board
8/24/2020 5:18:03 PM Submission request sent to Applicant
8/21/2020 4:58:29 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
8/19/2020 10:30:28 AM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
8/18/2020 10:48:35 AM Request for Review Comments returned by EPC Stormwater Review
8/17/2020 3:58:54 PM Request for Review Comments returned by PCD Engineering Division
8/17/2020 8:39:10 AM Request for Review Comments returned by Pikes Peak Regional Building Department
8/16/2020 7:15:27 AM Request for Review Comments returned by PCD Project Manager
8/13/2020 8:55:56 PM Request for Review Comments returned by County Attorney - Development Review
8/10/2020 2:06:52 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
8/5/2020 12:27:16 PM Request for Review Comments returned by Colorado Division of Water Resources
7/30/2020 2:49:47 PM Request for Review Comments returned by EPC Environmental Services
7/28/2020 3:41:26 PM Request for Review Comments returned by Lewis Palmer 38
7/28/2020 1:39:40 PM Request for Review Comments returned by Colorado State Forest Service
7/27/2020 10:26:22 AM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
7/27/2020 10:06:50 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
7/27/2020 9:56:35 AM Request for Review Comments returned by County Attorney - Water
7/27/2020 7:18:28 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
7/24/2020 7:07:30 AM Request for Review Comments returned by RBD Floodplain
7/23/2020 5:37:13 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by John Bender on behalf of Tri Lakes Land Use Committee
7/23/2020 5:37:12 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Paul Pirog on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
7/23/2020 5:37:11 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
7/23/2020 5:37:10 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Vicki Wood on behalf of Lewis Palmer 38
7/23/2020 5:37:07 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
7/23/2020 5:37:06 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joe Valdez on behalf of Black Hills Energy-Aquila
7/23/2020 5:37:02 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
7/23/2020 5:37:01 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Keith Curtis on behalf of RBD Floodplain
7/23/2020 5:37:00 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
7/23/2020 5:36:58 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
7/23/2020 5:36:57 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
7/23/2020 5:36:54 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
7/23/2020 5:36:53 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
7/23/2020 5:36:51 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joanna Williams on behalf of Colorado Division of Water Resources
7/23/2020 5:36:49 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
7/23/2020 5:36:48 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
7/23/2020 5:36:47 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of Parks Advisory Board
7/23/2020 5:36:45 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
7/23/2020 5:36:43 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Commander John Padgett on behalf of EPC Sheriff's Department
7/23/2020 5:36:42 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
7/23/2020 5:36:41 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Parks Department
7/23/2020 5:36:39 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Health Department
7/23/2020 5:36:36 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Kathy Andrew on behalf of EPC Environmental Services
7/23/2020 5:36:35 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Edi Anderson on behalf of County Attorney - Water
7/23/2020 5:36:34 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
7/23/2020 5:36:33 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Nina Ruiz on behalf of PCD Project Manager
7/23/2020 5:36:31 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/23/2020 5:35:00 PM Submission Triaged
7/22/2020 1:14:56 PM Submission received from Applicant
7/14/2020 7:07:23 PM Request for Review Comments returned by Donald Wescott Fire Protection District
7/8/2020 12:46:22 PM Project Manager Assigned: Nina Ruiz
7/2/2020 11:16:25 AM Submission request sent to Applicant
7/2/2020 11:07:33 AM Request for Review Comments returned by PCD Project Manager
7/2/2020 10:28:43 AM Request for Review Comments returned by PCD Engineering Division
7/1/2020 2:44:49 PM Request for Review Comments returned by County Attorney - Development Review
6/23/2020 10:34:17 AM Request for Review Comments returned by EPC Environmental Services
6/11/2020 3:36:57 PM Fees paid: 6/11/2020 (Receipt: 1002835)
6/10/2020 5:12:21 PM Payment Request sent: 6/10/2020
6/10/2020 4:05:49 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by John Bender on behalf of Tri Lakes Land Use Committee
6/10/2020 4:05:47 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
6/10/2020 4:05:46 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joe Valdez on behalf of Black Hills Energy-Aquila
6/10/2020 4:05:44 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
6/10/2020 4:05:40 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
6/10/2020 4:05:39 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
6/10/2020 4:05:38 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Commander John Padgett on behalf of EPC Sheriff's Department
6/10/2020 4:05:37 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
6/10/2020 4:05:36 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Kathy Andrew on behalf of EPC Environmental Services
6/10/2020 4:05:35 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
6/10/2020 4:05:34 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
6/10/2020 4:05:32 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/9/2020 11:32:00 AM Submission Triaged
6/9/2020 10:38:35 AM Submission received from Applicant
6/8/2020 3:56:56 PM Submission request sent to Applicant
6/8/2020 3:56:02 PM Submission Triaged
6/5/2020 3:51:20 PM Submission received from Applicant
5/18/2020 10:47:59 AM Submission request sent to Applicant
5/18/2020 10:45:44 AM Submission Triaged
5/14/2020 3:20:22 PM Submission received from Applicant
4/15/2020 3:34:24 PM Submission request sent to Applicant
4/15/2020 3:28:31 PM Request for Review Comments returned by PCD Project Manager
4/14/2020 5:47:46 PM Request for Review Comments returned by PCD Engineering Division
4/14/2020 4:03:49 PM Request for Review Comments returned by EPC Health Department
4/7/2020 6:51:04 PM Request for Review Comments returned by EPC Stormwater Review
4/1/2020 9:37:42 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
3/31/2020 3:33:48 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
3/31/2020 2:35:01 PM Request for Review Comments returned by County Attorney - Water
3/31/2020 11:43:45 AM Request for Review Comments returned by Pikes Peak Regional Building Department
3/30/2020 2:56:35 PM Request for Review Comments returned by County Attorney - Development Review
3/24/2020 1:24:55 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
3/17/2020 5:21:29 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/17/2020 8:10:50 AM Request for Review Comments returned by EPC Environmental Services
3/11/2020 9:08:00 PM Request for Review Comments returned by Donald Wescott Fire Protection District
3/11/2020 4:34:44 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
3/11/2020 4:34:42 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/11/2020 4:28:01 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Paul Pirog on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
3/11/2020 4:28:00 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
3/11/2020 4:27:59 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
3/11/2020 4:27:59 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
3/11/2020 4:27:53 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Health Department
3/11/2020 4:27:52 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Kathy Andrew on behalf of EPC Environmental Services
3/11/2020 4:27:51 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Edi Anderson on behalf of County Attorney - Water
3/11/2020 4:27:50 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
3/11/2020 4:27:49 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
3/11/2020 4:27:47 PM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/11/2020 4:12:32 PM Submission Triaged
3/11/2020 2:13:30 PM Submission received from Applicant
3/10/2020 11:28:32 AM Submission request sent to Applicant
3/10/2020 11:25:13 AM Submission Triaged
3/9/2020 3:22:47 PM Submission received from Applicant
2/3/2020 7:14:17 AM Request for Review Comments email resent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Health Department
1/30/2020 3:51:56 PM Request for Review Comments returned by EPC Health Department
12/30/2019 10:07:07 AM Submission request sent to Applicant
12/30/2019 9:52:15 AM Request for Review Comments returned by PCD Project Manager
12/30/2019 9:49:45 AM Request for Review Comments email resent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
12/30/2019 9:47:38 AM Request for Review Comments returned by PCD Project Manager
12/21/2019 5:04:57 PM Request for Review Comments returned by PCD Engineering Division
12/16/2019 8:20:01 AM Request for Review Comments returned by Colorado Division of Water Resources
12/12/2019 10:07:28 AM Request for Review Comments returned by Parks Advisory Board
12/12/2019 10:06:03 AM Request for Review Comments returned by EPC Parks Department
12/11/2019 3:14:52 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
12/9/2019 3:49:13 PM Request for Review Comments returned by Pikes Peak Regional Building Department
12/5/2019 11:25:30 AM Request for Review Comments returned by RBD Floodplain
12/3/2019 3:36:35 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
12/3/2019 2:56:52 PM Request for Review Comments returned by County Attorney - Development Review
11/27/2019 11:43:26 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
11/27/2019 9:40:43 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
11/25/2019 1:37:33 PM Request for Review Comments returned by Colorado State Forest Service
11/21/2019 12:50:08 PM Request for Review Comments returned by Lewis Palmer 38
11/20/2019 12:27:04 PM Request for Review Comments returned by EPC Environmental Services
11/20/2019 10:07:08 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
11/20/2019 9:58:52 AM Request for Review Comments returned by County Attorney - Water
11/20/2019 7:48:26 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by John Bender on behalf of Tri Lakes Land Use Committee
11/20/2019 7:48:24 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
11/20/2019 7:48:22 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
11/20/2019 7:48:20 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Vicki Wood on behalf of Lewis Palmer 38
11/20/2019 7:48:18 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
11/20/2019 7:48:16 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joe Valdez on behalf of Black Hills Energy-Aquila
11/20/2019 7:48:13 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
11/20/2019 7:48:11 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Keith Curtis on behalf of RBD Floodplain
11/20/2019 7:48:09 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
11/20/2019 7:48:07 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
11/20/2019 7:48:05 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
11/20/2019 7:48:02 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
11/20/2019 7:48:00 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
11/20/2019 7:47:58 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joanna Williams on behalf of Colorado Division of Water Resources
11/20/2019 7:47:52 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
11/20/2019 7:47:50 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
11/20/2019 7:47:48 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of Parks Advisory Board
11/20/2019 7:47:46 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Commander John Padgett on behalf of EPC Sheriff's Department
11/20/2019 7:47:44 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
11/20/2019 7:47:43 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Parks Department
11/20/2019 7:47:40 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Health Department
11/20/2019 7:47:39 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Kathy Andrew on behalf of EPC Environmental Services
11/20/2019 7:47:38 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Edi Anderson on behalf of County Attorney - Water
11/20/2019 7:47:37 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
11/20/2019 7:47:37 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
11/20/2019 7:47:35 AM Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/20/2019 7:45:43 AM Fees paid: 11/20/2019 (Receipt: 1002046)
11/13/2019 5:06:55 PM Payment Request sent: 11/13/2019
11/13/2019 5:06:49 PM File # Assigned: SF1922
11/13/2019 2:38:31 PM Submission Triaged
11/13/2019 11:10:40 AM Submission received from Applicant
10/31/2019 8:35:45 AM Submission request sent to Applicant
10/31/2019 8:35:09 AM Submission Triaged
10/30/2019 3:00:07 PM Submission received from Applicant
10/8/2019 8:14:28 AM Submission request sent to Applicant
10/7/2019 4:28:53 PM Project Manager Assigned: Gabe Sevigny
10/7/2019 4:28:53 PM EA Assigned: EA17059
10/7/2019 4:28:53 PM Project Created