3/9/2023 4:46:07 PM
|
Project Closed
|
3/9/2023 4:46:07 PM
|
Project Approved: 3/9/2023
|
3/9/2023 10:07:32 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/2/2023 12:09:30 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/2/2023 12:09:26 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/2/2023 12:08:19 PM
|
Submission Triaged
|
3/2/2023 10:22:43 AM
|
Submission received from Applicant
|
12/7/2022 1:25:26 PM
|
Submission request sent to Applicant
|
12/7/2022 10:06:04 AM
|
Request for Review Comments returned by PCD Engineering Division
|
11/22/2022 8:25:04 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/22/2022 8:23:59 AM
|
Submission Triaged
|
11/21/2022 10:40:34 AM
|
Submission received from Applicant
|
10/23/2022 11:16:18 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/18/2022 10:15:31 AM
|
Submission request sent to Applicant
|
10/17/2022 3:38:11 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/21/2022 4:51:51 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/21/2022 4:51:49 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/21/2022 4:50:27 PM
|
Project reopened for Review Comments
|
9/21/2022 4:00:52 PM
|
Submission Triaged
|
9/21/2022 2:30:56 PM
|
Submission received from Applicant
|
9/21/2022 8:23:35 AM
|
Submission request sent to Applicant
|
9/15/2022 1:55:31 PM
|
Submission request sent to Applicant
|
9/15/2022 1:47:06 PM
|
Project Manager Assigned: Ryan Howser
|
3/13/2021 3:04:06 PM
|
Project Closed
|
3/13/2021 3:04:05 PM
|
Project Approved: 3/13/2021
|
11/30/2020 3:03:36 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
10/26/2020 12:03:29 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/21/2020 7:26:10 AM
|
Request for Review Comments returned by PCD Engineering Division
|
10/17/2020 6:39:43 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Nina Ruiz on behalf of PCD Project Manager
|
10/17/2020 6:39:37 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/17/2020 6:37:36 AM
|
Submission Triaged
|
10/16/2020 1:26:15 PM
|
Submission received from Applicant
|
10/15/2020 5:11:53 PM
|
Submission request sent to Applicant
|
10/12/2020 8:15:00 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/7/2020 11:29:09 AM
|
Submission request sent to Applicant
|
10/6/2020 9:29:12 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/6/2020 10:02:35 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/6/2020 8:48:30 AM
|
Request for Review Comments returned by PCD Engineering Division
|
9/16/2020 5:23:03 AM
|
Submission Triaged
|
9/15/2020 10:37:35 AM
|
Submission received from Applicant
|
9/12/2020 6:48:07 AM
|
Submission request sent to Applicant
|
9/10/2020 5:31:06 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/10/2020 5:31:04 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
9/10/2020 5:31:03 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
|
9/10/2020 5:31:02 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Nina Ruiz on behalf of PCD Project Manager
|
9/10/2020 5:31:00 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/10/2020 5:16:18 AM
|
Submission Triaged
|
9/9/2020 1:34:41 PM
|
Request for Review Comments returned by EPC Health Department
|
9/8/2020 3:25:14 PM
|
Submission received from Applicant
|
9/1/2020 9:26:55 AM
|
Request for Review Comments returned by EPC Parks Department
|
8/27/2020 10:53:48 AM
|
Request for Review Comments returned by Parks Advisory Board
|
8/24/2020 5:18:03 PM
|
Submission request sent to Applicant
|
8/21/2020 4:58:29 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
8/19/2020 10:30:28 AM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
8/18/2020 10:48:35 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/17/2020 3:58:54 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/17/2020 8:39:10 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
8/16/2020 7:15:27 AM
|
Request for Review Comments returned by PCD Project Manager
|
8/13/2020 8:55:56 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/10/2020 2:06:52 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
8/5/2020 12:27:16 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
7/30/2020 2:49:47 PM
|
Request for Review Comments returned by EPC Environmental Services
|
7/28/2020 3:41:26 PM
|
Request for Review Comments returned by Lewis Palmer 38
|
7/28/2020 1:39:40 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
7/27/2020 10:26:22 AM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
7/27/2020 10:06:50 AM
|
Request for Review Comments returned by Colorado Department of Public Health and Environment
|
7/27/2020 9:56:35 AM
|
Request for Review Comments returned by County Attorney - Water
|
7/27/2020 7:18:28 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
7/24/2020 7:07:30 AM
|
Request for Review Comments returned by RBD Floodplain
|
7/23/2020 5:37:13 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by John Bender on behalf of Tri Lakes Land Use Committee
|
7/23/2020 5:37:12 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Paul Pirog on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
7/23/2020 5:37:11 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
7/23/2020 5:37:10 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Vicki Wood on behalf of Lewis Palmer 38
|
7/23/2020 5:37:07 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
|
7/23/2020 5:37:06 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
7/23/2020 5:37:02 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
7/23/2020 5:37:01 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Keith Curtis on behalf of RBD Floodplain
|
7/23/2020 5:37:00 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
7/23/2020 5:36:58 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
7/23/2020 5:36:57 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
7/23/2020 5:36:54 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
7/23/2020 5:36:53 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
7/23/2020 5:36:51 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
7/23/2020 5:36:49 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
7/23/2020 5:36:48 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
|
7/23/2020 5:36:47 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of Parks Advisory Board
|
7/23/2020 5:36:45 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
7/23/2020 5:36:43 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
7/23/2020 5:36:42 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
7/23/2020 5:36:41 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Parks Department
|
7/23/2020 5:36:39 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Health Department
|
7/23/2020 5:36:36 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Kathy Andrew on behalf of EPC Environmental Services
|
7/23/2020 5:36:35 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Edi Anderson on behalf of County Attorney - Water
|
7/23/2020 5:36:34 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
|
7/23/2020 5:36:33 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Nina Ruiz on behalf of PCD Project Manager
|
7/23/2020 5:36:31 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/23/2020 5:35:00 PM
|
Submission Triaged
|
7/22/2020 1:14:56 PM
|
Submission received from Applicant
|
7/14/2020 7:07:23 PM
|
Request for Review Comments returned by Donald Wescott Fire Protection District
|
7/8/2020 12:46:22 PM
|
Project Manager Assigned: Nina Ruiz
|
7/2/2020 11:16:25 AM
|
Submission request sent to Applicant
|
7/2/2020 11:07:33 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/2/2020 10:28:43 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/1/2020 2:44:49 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/23/2020 10:34:17 AM
|
Request for Review Comments returned by EPC Environmental Services
|
6/11/2020 3:36:57 PM
|
Fees paid: 6/11/2020 (Receipt: 1002835)
|
6/10/2020 5:12:21 PM
|
Payment Request sent: 6/10/2020
|
6/10/2020 4:05:49 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by John Bender on behalf of Tri Lakes Land Use Committee
|
6/10/2020 4:05:47 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
|
6/10/2020 4:05:46 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
6/10/2020 4:05:44 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
6/10/2020 4:05:40 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
6/10/2020 4:05:39 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
6/10/2020 4:05:38 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
6/10/2020 4:05:37 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
6/10/2020 4:05:36 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Kathy Andrew on behalf of EPC Environmental Services
|
6/10/2020 4:05:35 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
|
6/10/2020 4:05:34 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
|
6/10/2020 4:05:32 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/9/2020 11:32:00 AM
|
Submission Triaged
|
6/9/2020 10:38:35 AM
|
Submission received from Applicant
|
6/8/2020 3:56:56 PM
|
Submission request sent to Applicant
|
6/8/2020 3:56:02 PM
|
Submission Triaged
|
6/5/2020 3:51:20 PM
|
Submission received from Applicant
|
5/18/2020 10:47:59 AM
|
Submission request sent to Applicant
|
5/18/2020 10:45:44 AM
|
Submission Triaged
|
5/14/2020 3:20:22 PM
|
Submission received from Applicant
|
4/15/2020 3:34:24 PM
|
Submission request sent to Applicant
|
4/15/2020 3:28:31 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/14/2020 5:47:46 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/14/2020 4:03:49 PM
|
Request for Review Comments returned by EPC Health Department
|
4/7/2020 6:51:04 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/1/2020 9:37:42 AM
|
Request for Review Comments returned by Colorado Department of Public Health and Environment
|
3/31/2020 3:33:48 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
3/31/2020 2:35:01 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/31/2020 11:43:45 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/30/2020 2:56:35 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/24/2020 1:24:55 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
3/17/2020 5:21:29 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/17/2020 8:10:50 AM
|
Request for Review Comments returned by EPC Environmental Services
|
3/11/2020 9:08:00 PM
|
Request for Review Comments returned by Donald Wescott Fire Protection District
|
3/11/2020 4:34:44 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
|
3/11/2020 4:34:42 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/11/2020 4:28:01 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Paul Pirog on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
3/11/2020 4:28:00 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
3/11/2020 4:27:59 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
3/11/2020 4:27:59 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
|
3/11/2020 4:27:53 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Health Department
|
3/11/2020 4:27:52 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/11/2020 4:27:51 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Edi Anderson on behalf of County Attorney - Water
|
3/11/2020 4:27:50 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
|
3/11/2020 4:27:49 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
|
3/11/2020 4:27:47 PM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/11/2020 4:12:32 PM
|
Submission Triaged
|
3/11/2020 2:13:30 PM
|
Submission received from Applicant
|
3/10/2020 11:28:32 AM
|
Submission request sent to Applicant
|
3/10/2020 11:25:13 AM
|
Submission Triaged
|
3/9/2020 3:22:47 PM
|
Submission received from Applicant
|
2/3/2020 7:14:17 AM
|
Request for Review Comments email resent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Health Department
|
1/30/2020 3:51:56 PM
|
Request for Review Comments returned by EPC Health Department
|
12/30/2019 10:07:07 AM
|
Submission request sent to Applicant
|
12/30/2019 9:52:15 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/30/2019 9:49:45 AM
|
Request for Review Comments email resent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
|
12/30/2019 9:47:38 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/21/2019 5:04:57 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/16/2019 8:20:01 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/12/2019 10:07:28 AM
|
Request for Review Comments returned by Parks Advisory Board
|
12/12/2019 10:06:03 AM
|
Request for Review Comments returned by EPC Parks Department
|
12/11/2019 3:14:52 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
12/9/2019 3:49:13 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/5/2019 11:25:30 AM
|
Request for Review Comments returned by RBD Floodplain
|
12/3/2019 3:36:35 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
12/3/2019 2:56:52 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/27/2019 11:43:26 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/27/2019 9:40:43 AM
|
Request for Review Comments returned by Colorado Department of Public Health and Environment
|
11/25/2019 1:37:33 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
11/21/2019 12:50:08 PM
|
Request for Review Comments returned by Lewis Palmer 38
|
11/20/2019 12:27:04 PM
|
Request for Review Comments returned by EPC Environmental Services
|
11/20/2019 10:07:08 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
11/20/2019 9:58:52 AM
|
Request for Review Comments returned by County Attorney - Water
|
11/20/2019 7:48:26 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by John Bender on behalf of Tri Lakes Land Use Committee
|
11/20/2019 7:48:24 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
11/20/2019 7:48:22 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
11/20/2019 7:48:20 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Vicki Wood on behalf of Lewis Palmer 38
|
11/20/2019 7:48:18 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
|
11/20/2019 7:48:16 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
11/20/2019 7:48:13 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
11/20/2019 7:48:11 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Keith Curtis on behalf of RBD Floodplain
|
11/20/2019 7:48:09 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
11/20/2019 7:48:07 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
11/20/2019 7:48:05 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
11/20/2019 7:48:02 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
11/20/2019 7:48:00 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
11/20/2019 7:47:58 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/20/2019 7:47:52 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
11/20/2019 7:47:50 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
|
11/20/2019 7:47:48 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of Parks Advisory Board
|
11/20/2019 7:47:46 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
11/20/2019 7:47:44 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
11/20/2019 7:47:43 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Parks Department
|
11/20/2019 7:47:40 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by on behalf of EPC Health Department
|
11/20/2019 7:47:39 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Kathy Andrew on behalf of EPC Environmental Services
|
11/20/2019 7:47:38 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Edi Anderson on behalf of County Attorney - Water
|
11/20/2019 7:47:37 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Lori Seago on behalf of County Attorney - Development Review
|
11/20/2019 7:47:37 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Gabe Sevigny on behalf of PCD Project Manager
|
11/20/2019 7:47:35 AM
|
Request for Review Comments email sent for Project Rollin Ridge Final Plat. for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/20/2019 7:45:43 AM
|
Fees paid: 11/20/2019 (Receipt: 1002046)
|
11/13/2019 5:06:55 PM
|
Payment Request sent: 11/13/2019
|
11/13/2019 5:06:49 PM
|
File # Assigned: SF1922
|
11/13/2019 2:38:31 PM
|
Submission Triaged
|
11/13/2019 11:10:40 AM
|
Submission received from Applicant
|
10/31/2019 8:35:45 AM
|
Submission request sent to Applicant
|
10/31/2019 8:35:09 AM
|
Submission Triaged
|
10/30/2019 3:00:07 PM
|
Submission received from Applicant
|
10/8/2019 8:14:28 AM
|
Submission request sent to Applicant
|
10/7/2019 4:28:53 PM
|
Project Manager Assigned: Gabe Sevigny
|
10/7/2019 4:28:53 PM
|
EA Assigned: EA17059
|
10/7/2019 4:28:53 PM
|
Project Created
|