Project Details

Search


File Number
PPR1952
Project Name
2104 LLC Site Development Plan
Description
A site development plan for a recycling facility
Location
2210 Jantell Road
Parcels
6428201008 6428201008 6429101011 6429101011
Applicant
2401 LLC
Debra Eiland ( debra@eilandlawfirm.com )
(719) 471-1545
Debra Eiland ( debra@eilandlawfirm.com )
(719) 471-1545
EA Number
EA19192
File Prefix
PPR - Plot Plan Review
Year
2019
Project Manager
Gabe Sevigny
Status
Closed
Created
10/7/2019 12:48:22 PM

View: Review Comments


Approved Documents (11)

Link Document
View Erosion and Stormwater Quality Control Permit (ESQCP)
View PDB/BMP Operations & Maintenance Manual
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet)
View Grading & Erosion Control Plan
View Landscape Plan drawings
View Site Development Plan
View Storm Water Management Plan (SWMP)
View Drainage Report - Final
View Detention Maintenance Agreement (MS WORD version required - attachments included)
View Financial Assurance Forms
View Traffic Memo


Additional Documents (2)

Link Document Comment
View Recorded Maintenance Agreement
View FA pinchlist


Review Documents (41)

Link Document Date
View Application/Petition Form 11/21/2019 6:12:30 PM
View Legal Description (MS WORD Version required) 11/21/2019 6:12:36 PM
View Letter of Intent 6/25/2020 12:40:02 PM
View Title Commitment (Current within 30 days of submittal) 11/21/2019 6:12:38 PM
View Vicinity/Location Map 11/21/2019 6:12:39 PM
View Driveway Permit 5/27/2020 3:51:50 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 6/10/2020 1:01:12 PM
View Floodplain Development Permit 12/11/2019 4:42:48 PM
View Grading & Erosion Control checklist 5/27/2020 3:51:53 PM
View MS4 Post Construction Form 2/4/2020 5:37:58 PM
View PBMP Applicability Form 2/7/2020 3:41:54 PM
View PDB/BMP Operations & Maintenance Manual 5/27/2020 3:51:51 PM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 3/30/2020 11:48:01 AM
View SWMP checklist 5/27/2020 3:51:54 PM
View Grading & Erosion Control Plan 6/10/2020 12:49:37 PM
View Haul Route Plan 4/30/2020 5:54:24 PM
View Landscape Plan drawings 5/27/2020 3:51:46 PM
View Site Development Plan 5/27/2020 3:51:49 PM
View Storm Water Management Plan (SWMP) 5/27/2020 3:51:47 PM
View Fire Commitment Letter 12/11/2019 3:52:04 PM
View Drainage Report - Final 5/27/2020 3:51:37 PM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 6/11/2020 2:12:41 PM
View Air Quality Management Plan 11/21/2019 6:12:29 PM
View Closures Plan 2/7/2020 6:25:56 PM
View Commitment letter from waste water service provider 11/21/2019 6:12:31 PM
View Commitment letter from water service provider 11/21/2019 6:12:31 PM
View Construction Permit 3/30/2020 2:09:57 PM
View Deviation Request 5/28/2020 1:58:37 PM
View Elevation Plans 5/27/2020 3:51:36 PM
View Facility Closure Plan 3/30/2020 12:26:56 PM
View Financial Assurance Forms 4/29/2020 4:42:07 PM
View Floor Plans (24" x 36") 5/27/2020 3:51:41 PM
View Letter from Garden Valley Water & Sanitation District 3/30/2020 12:06:16 PM
View Lighting Plan 5/27/2020 3:51:46 PM
View Operations & Recycling Plan 3/30/2020 12:06:17 PM
View Operations Plan 2/10/2020 2:16:24 PM
View OWTS Design 5/5/2020 1:31:02 PM
View Proof of submittal of non-jurisdictional water impoundment structure form 2/4/2020 5:37:58 PM
View Recycling Plan 11/21/2019 6:12:43 PM
View Stormwater Certification 3/30/2020 2:09:57 PM
View Traffic Memo 6/23/2020 1:10:31 PM



Events (156)

Date Comment
7/1/2020 12:37:30 PM Project Closed
7/1/2020 12:37:30 PM Project Approved: 7/1/2020
6/25/2020 1:26:20 PM Project Ready for Approval requests. Review Comment period is complete.
6/25/2020 1:09:12 PM Submission Triaged
6/25/2020 12:40:42 PM Submission received from Applicant
6/25/2020 12:30:18 PM Submission request sent to Applicant
6/23/2020 1:24:25 PM Submission Triaged
6/23/2020 1:11:02 PM Submission received from Applicant
6/23/2020 10:09:36 AM Submission request sent to Applicant
6/11/2020 2:28:32 PM Submission Triaged
6/11/2020 2:14:04 PM Submission received from Applicant
6/9/2020 11:38:09 AM Request for Review Comments returned by Colorado Springs Public Works
6/9/2020 11:28:09 AM Submission request sent to Applicant
6/9/2020 11:26:42 AM Request for Review Comments returned by PCD Project Manager
6/9/2020 9:45:30 AM Request for Review Comments returned by PCD Engineering Division
6/8/2020 10:06:34 PM Request for Review Comments returned by County Attorney - Development Review
6/3/2020 3:59:21 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/28/2020 2:39:01 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
5/28/2020 2:39:00 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Mark Wilsey on behalf of Harrison SD 2
5/28/2020 2:38:59 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Brenda Smith on behalf of Garden Valley Water & Sanitation District
5/28/2020 2:38:58 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/28/2020 2:38:54 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
5/28/2020 2:38:52 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
5/28/2020 2:38:51 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
5/28/2020 2:38:50 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
5/28/2020 2:38:49 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
5/28/2020 2:38:48 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Gabe Sevigny on behalf of PCD Project Manager
5/28/2020 2:38:46 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/28/2020 2:32:22 PM Submission Triaged
5/28/2020 1:59:37 PM Submission received from Applicant
5/27/2020 12:53:33 PM Submission request sent to Applicant
5/12/2020 12:05:08 PM Submission request sent to Applicant
5/12/2020 12:04:04 PM Request for Review Comments returned by PCD Project Manager
5/12/2020 9:18:12 AM Request for Review Comments returned by PCD Engineering Division
5/6/2020 2:22:35 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Gabe Sevigny on behalf of PCD Project Manager
5/6/2020 2:22:34 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/6/2020 2:20:36 PM Submission Triaged
5/5/2020 1:32:10 PM Submission received from Applicant
4/29/2020 12:14:23 PM Submission request sent to Applicant
4/23/2020 12:22:48 PM Request for Review Comments returned by EPC Health Department
4/23/2020 9:43:34 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
4/21/2020 2:34:25 PM Submission request sent to Applicant
4/21/2020 2:33:03 PM Request for Review Comments returned by PCD Project Manager
4/21/2020 2:31:45 PM Request for Review Comments email resent for Project 2104 LLC Site Development Plan for review by Gabe Sevigny on behalf of PCD Project Manager
4/21/2020 11:33:49 AM Request for Review Comments returned by PCD Project Manager
4/20/2020 5:43:27 PM Request for Review Comments returned by PCD Engineering Division
4/14/2020 9:58:31 AM Request for Review Comments returned by Colorado Springs Public Works
4/10/2020 4:34:15 PM Request for Review Comments returned by County Attorney - Development Review
4/6/2020 11:16:18 AM Request for Review Comments email resent for Project 2104 LLC Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
4/3/2020 12:58:21 PM Request for Review Comments returned by County Attorney - Development Review
3/31/2020 12:26:49 PM Request for Review Comments returned by EPC Environmental Services
3/30/2020 5:04:14 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
3/30/2020 5:04:11 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
3/30/2020 5:04:07 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by on behalf of EPC Health Department
3/30/2020 5:04:06 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Kathy Andrew on behalf of EPC Environmental Services
3/30/2020 5:04:05 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
3/30/2020 5:04:05 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Gabe Sevigny on behalf of PCD Project Manager
3/30/2020 5:04:03 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/30/2020 4:52:33 PM Submission Triaged
3/30/2020 3:02:35 PM Submission received from Applicant
3/5/2020 1:47:10 PM Submission request sent to Applicant
3/5/2020 1:41:44 PM Request for Review Comments returned by PCD Project Manager
3/5/2020 10:56:25 AM Request for Review Comments returned by PCD Engineering Division
3/3/2020 5:05:42 PM Request for Review Comments returned by Colorado Springs Planning & Community Development
3/2/2020 9:02:14 AM Request for Review Comments returned by El Paso County Conservation Dist
2/24/2020 9:49:31 AM Request for Review Comments returned by Pikes Peak Regional Building Department
2/21/2020 1:01:38 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
2/19/2020 2:39:53 PM Request for Review Comments returned by EPC Environmental Services
2/14/2020 11:00:18 AM Request for Review Comments returned by County Attorney - Development Review
2/14/2020 9:19:20 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/10/2020 3:47:44 PM Request for Review Comments returned by RBD Floodplain
2/10/2020 2:52:53 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Pamela Davison on behalf of El Paso County Conservation Dist
2/10/2020 2:52:52 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/10/2020 2:52:51 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Keith Curtis on behalf of RBD Floodplain
2/10/2020 2:52:50 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
2/10/2020 2:52:50 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
2/10/2020 2:52:49 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
2/10/2020 2:52:45 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by on behalf of EPC Health Department
2/10/2020 2:52:45 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Kathy Andrew on behalf of EPC Environmental Services
2/10/2020 2:52:44 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
2/10/2020 2:52:43 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Gabe Sevigny on behalf of PCD Project Manager
2/10/2020 2:52:41 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/10/2020 2:41:58 PM Submission Triaged
2/10/2020 2:16:57 PM Submission received from Applicant
2/9/2020 4:52:10 PM Request for Review Comments returned by EPC Health Department
1/27/2020 10:31:16 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
1/14/2020 7:40:36 AM Submission request sent to Applicant
1/14/2020 7:38:25 AM Request for Review Comments returned by PCD Project Manager
1/13/2020 8:14:59 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
1/11/2020 1:24:22 PM Request for Review Comments returned by PCD Engineering Division
1/2/2020 4:10:19 PM Request for Review Comments returned by EPC Environmental Services
12/31/2019 8:22:49 AM Request for Review Comments returned by RBD Floodplain
12/31/2019 8:19:23 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Keith Curtis on behalf of RBD Floodplain
12/31/2019 8:18:53 AM Submission Triaged
12/30/2019 5:35:07 PM Submission received from Applicant
12/30/2019 11:55:29 AM Request for Review Comments returned by Pikes Peak Regional Building Department
12/27/2019 12:38:11 PM Request for Review Comments returned by County Attorney - Development Review
12/20/2019 8:19:40 AM Request for Review Comments returned by El Paso County Conservation Dist
12/18/2019 9:52:39 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/17/2019 8:22:54 AM Submission request sent to Applicant
12/17/2019 8:11:12 AM Request for Review Comments returned by RBD Floodplain
12/17/2019 8:02:15 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
12/17/2019 8:02:14 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Mark Wilsey on behalf of Harrison SD 2
12/17/2019 8:02:12 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Brenda Smith on behalf of Garden Valley Water & Sanitation District
12/17/2019 8:02:10 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Pamela Davison on behalf of El Paso County Conservation Dist
12/17/2019 8:02:10 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/17/2019 8:02:07 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
12/17/2019 8:02:06 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Keith Curtis on behalf of RBD Floodplain
12/17/2019 8:02:05 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
12/17/2019 8:02:04 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
12/17/2019 8:02:03 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
12/17/2019 8:02:01 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by on behalf of EPC Health Department
12/17/2019 8:02:00 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Kathy Andrew on behalf of EPC Environmental Services
12/17/2019 8:01:59 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
12/17/2019 8:01:58 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Gabe Sevigny on behalf of PCD Project Manager
12/17/2019 8:01:57 AM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/17/2019 7:59:35 AM Submission Triaged
12/13/2019 11:28:59 AM Submission received from Applicant
12/12/2019 4:28:48 PM Submission request sent to Applicant
12/12/2019 3:18:45 PM Request for Review Comments returned by Stratmoor HIlls Fire Department
12/12/2019 2:52:14 PM Request for Review Comments returned by RBD Floodplain
12/12/2019 2:42:30 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Fire Inspector Mark Stanwood on behalf of Stratmoor HIlls Fire Department
12/12/2019 2:42:29 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
12/12/2019 2:42:27 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Mark Wilsey on behalf of Harrison SD 2
12/12/2019 2:42:26 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Brenda Smith on behalf of Garden Valley Water & Sanitation District
12/12/2019 2:42:25 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Pamela Davison on behalf of El Paso County Conservation Dist
12/12/2019 2:42:24 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/12/2019 2:42:22 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
12/12/2019 2:42:21 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Keith Curtis on behalf of RBD Floodplain
12/12/2019 2:42:20 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
12/12/2019 2:42:19 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
12/12/2019 2:42:18 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
12/12/2019 2:42:15 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by on behalf of EPC Health Department
12/12/2019 2:42:14 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Kathy Andrew on behalf of EPC Environmental Services
12/12/2019 2:42:13 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
12/12/2019 2:42:12 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Gabe Sevigny on behalf of PCD Project Manager
12/12/2019 2:42:11 PM Request for Review Comments email sent for Project 2104 LLC Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/11/2019 4:50:11 PM Submission Triaged
12/11/2019 4:43:30 PM Submission received from Applicant
12/11/2019 4:35:45 PM Submission request sent to Applicant
12/11/2019 4:28:00 PM Fees paid: 12/11/2019 (Receipt: 1002135)
12/11/2019 4:18:35 PM Payment Request sent: 12/11/2019
12/11/2019 4:18:24 PM File # Assigned: PPR1952
12/11/2019 4:12:10 PM Submission Triaged
12/11/2019 3:52:40 PM Submission received from Applicant
11/22/2019 7:55:45 AM Submission request sent to Applicant
11/22/2019 7:55:34 AM Submission Triaged
11/21/2019 6:29:47 PM Submission received from Applicant
11/20/2019 1:42:06 PM Submission request sent to Applicant
11/14/2019 2:08:59 PM Submission request sent to Applicant
11/14/2019 2:05:32 PM Submission Triaged
11/13/2019 4:30:38 PM Submission received from Applicant
10/8/2019 8:19:47 AM Submission request sent to Applicant
10/7/2019 12:48:32 PM Project Manager Assigned: Gabe Sevigny
10/7/2019 12:48:32 PM EA Assigned: EA19192
10/7/2019 12:48:32 PM Project Created