| 8/5/2022 4:34:45 PM | Project Closed | 
                
                    | 8/5/2022 4:34:45 PM | Project Approved: 8/5/2022 | 
                
                    | 8/2/2022 8:28:12 AM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 8/2/2022 7:40:57 AM | Request for Review Comments email sent for Project Mountain's Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 8/2/2022 7:39:46 AM | Submission Triaged | 
                
                    | 8/1/2022 11:02:47 AM | Submission received from Applicant | 
                
                    | 7/29/2022 12:40:51 PM | Submission request sent to Applicant | 
                
                    | 7/26/2022 12:30:53 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 7/26/2022 11:41:49 AM | Request for Review Comments email sent for Project Mountain's Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 7/26/2022 11:41:05 AM | Submission Triaged | 
                
                    | 7/25/2022 1:40:48 PM | Submission received from Applicant | 
                
                    | 7/14/2022 3:12:02 PM | Submission request sent to Applicant | 
                
                    | 7/14/2022 1:38:13 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 7/14/2022 1:29:26 PM | Request for Review Comments email resent for Project Mountain's Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 7/14/2022 9:41:45 AM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 7/8/2022 8:43:10 AM | Request for Review Comments email sent for Project Mountain's Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 7/8/2022 8:33:34 AM | Submission request sent to Applicant | 
                
                    | 7/8/2022 8:33:21 AM | Submission Triaged | 
                
                    | 7/7/2022 2:20:24 PM | Submission received from Applicant | 
                
                    | 6/28/2022 2:18:52 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 6/22/2022 5:23:11 PM | Submission request sent to Applicant | 
                
                    | 6/22/2022 5:21:47 PM | Request for Review Comments email sent for Project Mountain's Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 6/22/2022 5:20:25 PM | Submission request canceled | 
                
                    | 6/21/2022 8:18:58 AM | Submission request sent to Applicant | 
                
                    | 6/15/2022 3:53:46 PM | Submission request sent to Applicant | 
                
                    | 4/8/2022 8:03:13 AM | Submission request sent to Applicant | 
                
                    | 2/18/2022 8:54:11 AM | Request for Review Comments returned by EPC County Attorney's Office | 
                
                    | 2/8/2022 7:19:51 AM | Submission Triaged | 
                
                    | 2/7/2022 12:06:41 PM | Submission received from Applicant | 
                
                    | 2/4/2022 11:03:13 AM | Submission request sent to Applicant | 
                
                    | 2/1/2022 4:45:25 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 2/1/2022 1:52:40 PM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office | 
                
                    | 2/1/2022 1:13:24 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 1/31/2022 4:49:44 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 1/11/2022 5:30:06 PM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 1/11/2022 5:30:04 PM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 1/11/2022 5:30:02 PM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 1/11/2022 5:27:32 PM | Submission Triaged | 
                
                    | 1/11/2022 3:35:07 PM | Submission received from Applicant | 
                
                    | 12/3/2021 2:27:37 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 12/3/2021 9:31:45 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 12/2/2021 2:36:46 PM | Submission request sent to Applicant | 
                
                    | 12/2/2021 2:33:14 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 12/2/2021 1:41:05 PM | Request for Review Comments email resent for Project Mountains Edge Final Plat for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 12/2/2021 1:34:56 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 11/30/2021 3:07:57 PM | Request for Review Comments returned by EPC County Attorney's Office | 
                
                    | 11/24/2021 4:02:25 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 11/15/2021 10:57:45 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 11/12/2021 11:00:48 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 11/12/2021 11:00:44 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 11/12/2021 11:00:40 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office | 
                
                    | 11/12/2021 11:00:38 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 11/12/2021 11:00:36 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 11/12/2021 11:00:29 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 11/12/2021 10:22:03 AM | Submission Triaged | 
                
                    | 11/11/2021 12:25:19 PM | Submission received from Applicant | 
                
                    | 8/9/2021 3:50:59 PM | Submission request sent to Applicant | 
                
                    | 7/14/2021 12:03:34 PM | Submission request sent to Applicant | 
                
                    | 7/14/2021 11:44:41 AM | Request for Review Comments returned by EPC County Attorney's Office | 
                
                    | 6/10/2021 5:35:40 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 6/10/2021 3:33:14 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 6/3/2021 10:53:05 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Stormwater Engineer Reviewer Christina Furchak on behalf of EPC Stormwater Review | 
                
                    | 6/3/2021 9:49:31 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 6/2/2021 12:00:57 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 5/27/2021 8:37:23 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 5/13/2021 10:39:23 AM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 5/13/2021 9:43:13 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 5/13/2021 9:43:11 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 5/13/2021 9:43:07 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office | 
                
                    | 5/13/2021 9:43:05 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 5/13/2021 9:43:02 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 5/13/2021 9:42:55 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 5/13/2021 7:17:02 AM | Submission Triaged | 
                
                    | 5/12/2021 4:01:48 PM | Submission received from Applicant | 
                
                    | 5/11/2021 9:01:52 AM | Submission request sent to Applicant | 
                
                    | 12/4/2020 4:25:53 PM | Submission request sent to Applicant | 
                
                    | 11/18/2020 5:20:01 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 11/17/2020 4:55:50 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 11/17/2020 11:35:41 AM | Request for Review Comments returned by EPC County Attorney's Office | 
                
                    | 11/11/2020 1:52:46 PM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 11/5/2020 4:42:26 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 10/21/2020 10:56:59 AM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 10/21/2020 10:36:53 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 10/21/2020 10:36:51 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 10/21/2020 10:36:49 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office | 
                
                    | 10/21/2020 10:36:47 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 10/21/2020 10:36:45 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 10/21/2020 10:36:39 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 10/21/2020 10:33:16 AM | Submission Triaged | 
                
                    | 10/21/2020 10:12:36 AM | Submission received from Applicant | 
                
                    | 10/20/2020 4:08:03 PM | Submission request sent to Applicant | 
                
                    | 7/8/2020 12:45:30 PM | Project Manager Assigned: Ryan Howser | 
                
                    | 6/8/2020 9:53:11 AM | Submission request sent to Applicant | 
                
                    | 6/8/2020 9:52:41 AM | Submission Triaged | 
                
                    | 6/4/2020 10:15:03 AM | Submission received from Applicant | 
                
                    | 6/2/2020 12:00:16 PM | Submission request sent to Applicant | 
                
                    | 4/6/2020 7:32:57 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 4/6/2020 7:31:39 AM | Request for Review Comments email resent for Project Mountains Edge Final Plat for review by Gabe Sevigny on behalf of PCD Project Manager | 
                
                    | 4/3/2020 9:38:17 AM | Request for Review Comments returned by EPC County Attorney's Office | 
                
                    | 4/1/2020 12:43:34 PM | Request for Review Comments email resent for Project Mountains Edge Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office | 
                
                    | 3/30/2020 11:05:23 AM | Request for Review Comments returned by EPC Health Department | 
                
                    | 3/23/2020 9:48:20 AM | Request for Review Comments email resent for Project Mountains Edge Final Plat for review by  on behalf of EPC Health Department | 
                
                    | 3/18/2020 11:14:31 AM | Request for Review Comments returned by EPC Health Department | 
                
                    | 3/3/2020 12:58:18 PM | Submission request sent to Applicant | 
                
                    | 3/3/2020 12:54:14 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 3/3/2020 12:52:45 PM | Request for Review Comments email resent for Project Mountains Edge Final Plat for review by Gabe Sevigny on behalf of PCD Project Manager | 
                
                    | 3/3/2020 12:47:23 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 2/29/2020 1:21:21 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 2/26/2020 2:52:36 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 2/26/2020 2:32:49 PM | Request for Review Comments email resent for Project Mountains Edge Final Plat for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 2/26/2020 1:16:34 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 2/25/2020 2:28:39 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 2/20/2020 10:16:41 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 2/19/2020 12:28:34 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 2/19/2020 12:25:02 PM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 2/19/2020 12:12:54 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 2/14/2020 10:56:41 AM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 2/5/2020 12:44:08 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 2/5/2020 8:55:41 AM | Request for Review Comments returned by El Paso County Conservation Dist | 
                
                    | 2/4/2020 2:33:30 PM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 2/3/2020 2:11:38 PM | Request for Review Comments email resent for Project Mountains Edge Final Plat for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 2/3/2020 1:35:53 PM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 2/3/2020 1:22:59 PM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 2/3/2020 12:45:40 PM | Request for Review Comments returned by EPC County Attorney's Office | 
                
                    | 2/3/2020 12:24:09 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 2/3/2020 9:15:01 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Pamela Davison on behalf of El Paso County Conservation Dist | 
                
                    | 2/3/2020 9:15:00 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 2/3/2020 9:05:31 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Patrick Palacol on behalf of Peyton Fire Protection District | 
                
                    | 2/3/2020 9:05:30 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc. | 
                
                    | 2/3/2020 9:05:29 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Linda Miller on behalf of Calhan SD RJ1 | 
                
                    | 2/3/2020 9:05:28 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila | 
                
                    | 2/3/2020 9:05:27 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 2/3/2020 9:05:26 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 2/3/2020 9:05:25 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 2/3/2020 9:05:24 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 2/3/2020 9:05:23 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 2/3/2020 9:05:22 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 2/3/2020 9:05:21 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 2/3/2020 9:05:20 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by  on behalf of Parks Advisory Board | 
                
                    | 2/3/2020 9:05:19 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department | 
                
                    | 2/3/2020 9:05:18 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by  on behalf of EPC Parks Department | 
                
                    | 2/3/2020 9:05:16 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by  on behalf of EPC Health Department | 
                
                    | 2/3/2020 9:05:15 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 2/3/2020 9:05:14 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office | 
                
                    | 2/3/2020 9:05:13 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Gabe Sevigny on behalf of PCD Project Manager | 
                
                    | 2/3/2020 9:05:12 AM | Request for Review Comments email sent for Project Mountains Edge Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 2/3/2020 9:03:55 AM | Fees paid: 2/3/2020 (Receipt: 1002320) | 
                
                    | 1/28/2020 8:57:38 AM | Submission Triaged | 
                
                    | 1/27/2020 11:04:05 AM | Submission received from Applicant | 
                
                    | 1/15/2020 1:41:04 PM | Submission request sent to Applicant | 
                
                    | 1/6/2020 8:18:38 AM | Payment Request sent: 1/6/2020 | 
                
                    | 1/6/2020 8:18:31 AM | File # Assigned: SF201 | 
                
                    | 12/31/2019 12:07:43 PM | Submission Triaged | 
                
                    | 12/31/2019 10:05:19 AM | Submission received from Applicant | 
                
                    | 10/15/2019 10:42:02 AM | Submission request sent to Applicant | 
                
                    | 10/15/2019 10:41:38 AM | Submission Triaged | 
                
                    | 10/11/2019 12:22:25 PM | Submission received from Applicant | 
                
                    | 8/14/2019 2:08:41 PM | Submission request sent to Applicant | 
                
                    | 8/14/2019 2:07:15 PM | Submission request sent to Applicant | 
                
                    | 7/30/2019 12:39:46 PM | Submission request sent to Applicant | 
                
                    | 7/9/2019 10:13:13 AM | Project Manager Assigned: Gabe Sevigny | 
                
                    | 7/9/2019 10:13:13 AM | Project Created |