4/19/2022 4:07:25 PM
|
Project Closed
|
4/19/2022 4:07:25 PM
|
Project Approved: 4/19/2022
|
4/14/2022 12:21:23 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
4/14/2022 12:21:20 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/13/2022 4:08:43 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
4/13/2022 7:20:42 AM
|
Submission Triaged
|
4/12/2022 5:13:21 PM
|
Submission received from Applicant
|
4/12/2022 4:23:45 PM
|
Submission request sent to Applicant
|
4/4/2022 7:34:41 AM
|
Submission request sent to Applicant
|
4/4/2022 7:34:16 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/1/2022 4:36:28 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/10/2022 7:15:45 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
3/10/2022 7:15:39 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
3/10/2022 7:15:32 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/10/2022 7:14:36 AM
|
Submission Triaged
|
3/9/2022 2:46:04 PM
|
Submission received from Applicant
|
2/28/2022 7:04:08 AM
|
Submission request sent to Applicant
|
2/25/2022 10:33:51 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
2/23/2022 5:28:16 PM
|
Submission request sent to Applicant
|
2/23/2022 5:27:17 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/23/2022 5:20:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/10/2022 6:12:56 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/9/2022 7:19:06 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
2/9/2022 7:16:41 AM
|
Submission Triaged
|
2/9/2022 6:28:15 AM
|
Submission received from Applicant
|
2/8/2022 3:38:56 PM
|
Submission request sent to Applicant
|
2/1/2022 7:27:07 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
2/1/2022 7:27:01 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
|
2/1/2022 7:26:55 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/1/2022 7:26:53 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
2/1/2022 7:25:35 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
2/1/2022 7:25:29 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/1/2022 7:24:14 AM
|
Submission Triaged
|
2/1/2022 6:52:05 AM
|
Submission received from Applicant
|
12/28/2021 10:56:41 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
12/21/2021 1:23:00 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/20/2021 12:49:40 PM
|
Submission request sent to Applicant
|
12/20/2021 12:49:05 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/20/2021 11:26:59 AM
|
Submission request sent to Applicant
|
12/20/2021 11:22:25 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/14/2021 3:16:14 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/29/2021 1:04:21 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/29/2021 8:13:53 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
11/29/2021 8:13:51 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/29/2021 8:13:44 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
11/29/2021 8:13:37 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
11/29/2021 8:13:27 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
|
11/29/2021 8:13:25 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
11/29/2021 8:13:19 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/29/2021 8:13:17 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
11/29/2021 8:13:15 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
11/29/2021 8:13:09 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/29/2021 8:11:44 AM
|
Submission Triaged
|
11/24/2021 1:54:17 PM
|
Submission received from Applicant
|
10/21/2021 1:42:10 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
10/20/2021 7:36:09 AM
|
Submission request sent to Applicant
|
10/20/2021 7:35:47 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/19/2021 5:14:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/28/2021 12:09:07 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
9/28/2021 12:09:01 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
9/28/2021 12:08:55 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/28/2021 12:07:31 PM
|
Submission Triaged
|
9/28/2021 10:20:04 AM
|
Submission received from Applicant
|
9/16/2021 7:14:33 AM
|
Submission request sent to Applicant
|
9/16/2021 7:13:54 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/15/2021 2:28:28 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/17/2021 7:28:41 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
8/17/2021 7:28:34 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/17/2021 7:24:59 AM
|
Submission Triaged
|
8/17/2021 7:23:24 AM
|
Submission received from Applicant
|
8/17/2021 7:03:47 AM
|
Submission request sent to Applicant
|
8/17/2021 7:02:54 AM
|
Request for Review Comments returned by PCD Project Manager
|
8/11/2021 12:11:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/3/2021 7:21:03 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
8/3/2021 7:20:56 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/3/2021 7:18:45 AM
|
Submission Triaged
|
8/3/2021 5:33:05 AM
|
Submission received from Applicant
|
7/16/2021 11:22:42 AM
|
Submission request sent to Applicant
|
7/1/2021 8:26:24 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/30/2021 10:35:33 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/30/2021 10:25:29 AM
|
Request for Review Comments email resent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
6/30/2021 10:17:54 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/25/2021 9:34:37 AM
|
Submission Triaged
|
6/25/2021 9:32:02 AM
|
Submission received from Applicant
|
6/25/2021 9:23:37 AM
|
Submission request sent to Applicant
|
6/25/2021 9:23:01 AM
|
Submission Triaged
|
6/25/2021 9:11:31 AM
|
Submission received from Applicant
|
6/24/2021 2:52:23 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/24/2021 2:01:59 PM
|
Submission request sent to Applicant
|
6/24/2021 1:34:11 PM
|
Submission request sent to Applicant
|
6/23/2021 10:42:34 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
6/17/2021 8:54:35 AM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
6/15/2021 4:55:03 PM
|
Submission request sent to Applicant
|
6/9/2021 1:56:39 PM
|
Submission Triaged
|
6/9/2021 1:54:27 PM
|
Submission received from Applicant
|
6/9/2021 10:03:10 AM
|
Submission request sent to Applicant
|
6/9/2021 9:51:15 AM
|
Submission request sent to Applicant
|
5/27/2021 12:21:56 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
5/25/2021 7:17:01 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
5/25/2021 7:16:55 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
5/25/2021 7:16:47 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
5/25/2021 7:16:43 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
5/25/2021 7:16:41 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
5/25/2021 7:16:39 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
5/25/2021 7:16:33 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/25/2021 7:14:45 AM
|
Submission Triaged
|
5/24/2021 10:12:41 AM
|
Submission received from Applicant
|
5/24/2021 9:10:09 AM
|
Submission request sent to Applicant
|
5/24/2021 9:09:30 AM
|
Submission Triaged
|
5/21/2021 5:29:54 PM
|
Submission received from Applicant
|
3/2/2021 8:26:18 AM
|
Submission request sent to Applicant
|
3/2/2021 8:04:17 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/1/2021 11:35:06 AM
|
Request for Review Comments returned by PCD Engineering Division
|
2/25/2021 6:08:42 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/25/2021 5:54:08 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/4/2021 2:15:11 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/3/2021 12:29:53 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
2/3/2021 12:29:51 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/3/2021 12:29:45 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
2/3/2021 12:29:39 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
2/3/2021 12:29:37 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
|
2/3/2021 12:29:35 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
2/3/2021 12:29:30 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/3/2021 12:29:28 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
2/3/2021 12:29:26 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
2/3/2021 12:29:20 PM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/3/2021 12:26:04 PM
|
Submission Triaged
|
2/3/2021 11:47:26 AM
|
Submission received from Applicant
|
2/3/2021 8:37:32 AM
|
Submission request sent to Applicant
|
11/10/2020 7:28:06 AM
|
Submission request sent to Applicant
|
11/9/2020 10:38:04 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/3/2020 8:40:40 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/2/2020 10:38:01 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/30/2020 1:48:05 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/30/2020 1:32:29 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
10/7/2020 2:23:30 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/7/2020 9:09:12 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/7/2020 9:09:01 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
10/7/2020 9:08:55 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
10/7/2020 9:08:53 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
|
10/7/2020 9:08:50 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
10/7/2020 9:08:48 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
10/7/2020 9:08:46 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
10/7/2020 9:08:42 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/7/2020 9:06:58 AM
|
Submission Triaged
|
10/7/2020 8:47:36 AM
|
Submission received from Applicant
|
7/30/2020 1:48:43 PM
|
Submission request sent to Applicant
|
7/28/2020 8:29:05 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/15/2020 7:04:46 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/2/2020 2:27:09 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
6/15/2020 2:50:13 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/12/2020 11:32:44 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/12/2020 11:32:43 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
6/12/2020 11:32:41 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
6/12/2020 11:32:40 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
|
6/12/2020 11:32:39 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
6/12/2020 11:32:38 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
6/12/2020 11:32:37 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
|
6/12/2020 11:32:36 AM
|
Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/12/2020 11:11:54 AM
|
Fees paid: 6/12/2020 (Receipt: 1002847)
|
6/2/2020 4:41:18 PM
|
Payment Request sent: 6/2/2020
|
6/2/2020 4:41:18 PM
|
File # Assigned: CDR205
|
6/2/2020 4:41:13 PM
|
Submission Triaged
|
6/2/2020 2:42:53 PM
|
Submission received from Applicant
|
2/10/2020 4:27:17 PM
|
Submission request sent to Applicant
|
4/24/2019 1:53:01 PM
|
Submission request sent to Applicant
|
4/24/2019 11:15:57 AM
|
Submission request sent to Applicant
|
4/24/2019 11:12:11 AM
|
Project Manager Assigned: Kari Parsons
|
4/24/2019 11:12:11 AM
|
Project Created
|