Project Details

Search


File Number
CDR205
Project Name
Sterling Ranch Road & Marksheffel Road CDs
Description
Construction Drawings for Sterling Ranch Road and Marksheffel Road includes Vollmer Roar at Marksheffel.
Parcels
5233000013 5233000013
Applicant
M&S Civil Consultants, Inc.
Mike Bramlett ( mbramlett@jrengineering.com )
(719) 593-2593
Mike Bramlett ( mbramlett@jrengineering.com )
(719) 593-2593
File Prefix
CDR - Construction Drawing Review
Year
2020
Project Manager
Kari Parsons
Status
Closed
Created
4/24/2019 11:12:06 AM

View: Review Comments



Additional Documents (8)

Link Document Comment
View Sterling Ranch Road Segment Only CDR Approved
View Sterling Ranch Road Segment Only FAE Approved
View email re: Sterling Ranch Engineering Approvals
View CDR Marksheffel Approved
View FAE Marksheffel Approved
View Vollmer Approved CDS
View Marksheffel April 2022 CD approved
View Approved Pavement Design Report - 10/27/22


Review Documents (31)

Link Document Date
View Letter of Intent 2/3/2021 8:12:35 AM
View Vicinity/Location Map 5/29/2020 11:31:30 AM
View Easement(s) 5/29/2020 11:36:07 AM
View Grading & Erosion Control checklist 2/3/2021 11:45:23 AM
View SWMP checklist 2/3/2021 11:45:23 AM
View US Army Corps of Engineer's Permit 3/4/2020 1:54:10 PM
View Construction Drawings (Plans/Profiles) 7/22/2021 2:38:52 PM
View Grading & Erosion Control Plan (24 x 36) 9/28/2021 10:19:51 AM
View Storm Water Management Plan (SWMP) 2/3/2021 11:45:20 AM
View Deviation Request 5/24/2021 10:11:56 AM
View Soils & Geology Report 10/7/2020 8:46:01 AM
View CAD file 4/12/2022 4:55:22 PM
View CD Redlines JR Response 2/1/2022 6:51:38 AM
View Deviation Request Sterling Ranch Rd 2/3/2021 11:45:24 AM
View Drainage Letter 6/25/2021 9:31:01 AM
View Engr Comments JR Response 2/1/2022 6:51:39 AM
View Financial Assurance Forms 8/3/2021 5:30:51 AM
View JR Response CD redlines 11/21/2021 9:50:50 AM
View JR Response Engr Review letter 11/21/2021 10:01:51 AM
View JR response to engineering review letter 9/28/2021 10:19:54 AM
View JR Response to GEC redlines 9/28/2021 10:19:55 AM
View List of discussion points between County, City and Owner for background on Marksheffel Rd 6/2/2020 2:42:47 PM
View Marksheffel FAE City Portion 8/3/2021 5:32:59 AM
View Sterling Ranch Road CDS 6/25/2021 9:10:37 AM
View Sterling Ranch Road FAE Only 6/25/2021 9:10:39 AM
View Striping Plan Marksheffel 3/8/2022 4:31:37 PM
View Vollmer FAE revised 3/9/2022 2:45:53 PM
View Vollmer Road CDs 3/8/2022 4:31:36 PM
View Vollmer ROW Warranty Deed 11/17/2021 7:25:02 AM
View Vollmer South Segment Traffic Fee Credit Agreement 4/12/2022 5:13:13 PM
View Vollmer Temp Const Esmt 11/17/2021 7:25:01 AM



Events (169)

Date Comment
4/19/2022 4:07:25 PM Project Closed
4/19/2022 4:07:25 PM Project Approved: 4/19/2022
4/14/2022 12:21:23 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
4/14/2022 12:21:20 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/13/2022 4:08:43 PM Request for Review Comments returned by Colorado Springs Public Works
4/13/2022 7:20:42 AM Submission Triaged
4/12/2022 5:13:21 PM Submission received from Applicant
4/12/2022 4:23:45 PM Submission request sent to Applicant
4/4/2022 7:34:41 AM Submission request sent to Applicant
4/4/2022 7:34:16 AM Request for Review Comments returned by PCD Project Manager
4/1/2022 4:36:28 PM Request for Review Comments returned by PCD Engineering Division
3/10/2022 7:15:45 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
3/10/2022 7:15:39 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
3/10/2022 7:15:32 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/10/2022 7:14:36 AM Submission Triaged
3/9/2022 2:46:04 PM Submission received from Applicant
2/28/2022 7:04:08 AM Submission request sent to Applicant
2/25/2022 10:33:51 AM Request for Review Comments returned by Colorado Springs Public Works
2/23/2022 5:28:16 PM Submission request sent to Applicant
2/23/2022 5:27:17 PM Request for Review Comments returned by PCD Project Manager
2/23/2022 5:20:42 PM Request for Review Comments returned by PCD Engineering Division
2/10/2022 6:12:56 PM Request for Review Comments returned by EPC Stormwater Review
2/9/2022 7:19:06 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
2/9/2022 7:16:41 AM Submission Triaged
2/9/2022 6:28:15 AM Submission received from Applicant
2/8/2022 3:38:56 PM Submission request sent to Applicant
2/1/2022 7:27:07 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
2/1/2022 7:27:01 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
2/1/2022 7:26:55 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
2/1/2022 7:26:53 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
2/1/2022 7:25:35 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
2/1/2022 7:25:29 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/1/2022 7:24:14 AM Submission Triaged
2/1/2022 6:52:05 AM Submission received from Applicant
12/28/2021 10:56:41 AM Request for Review Comments returned by Colorado Springs Public Works
12/21/2021 1:23:00 PM Request for Review Comments returned by EPC Stormwater Review
12/20/2021 12:49:40 PM Submission request sent to Applicant
12/20/2021 12:49:05 PM Request for Review Comments returned by PCD Project Manager
12/20/2021 11:26:59 AM Submission request sent to Applicant
12/20/2021 11:22:25 AM Request for Review Comments returned by PCD Engineering Division
12/14/2021 3:16:14 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/29/2021 1:04:21 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
11/29/2021 8:13:53 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
11/29/2021 8:13:51 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/29/2021 8:13:44 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
11/29/2021 8:13:37 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
11/29/2021 8:13:27 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
11/29/2021 8:13:25 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Joe Valdez on behalf of Black Hills Energy-Aquila
11/29/2021 8:13:19 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
11/29/2021 8:13:17 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
11/29/2021 8:13:15 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
11/29/2021 8:13:09 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/29/2021 8:11:44 AM Submission Triaged
11/24/2021 1:54:17 PM Submission received from Applicant
10/21/2021 1:42:10 PM Request for Review Comments returned by Colorado Springs Public Works
10/20/2021 7:36:09 AM Submission request sent to Applicant
10/20/2021 7:35:47 AM Request for Review Comments returned by PCD Project Manager
10/19/2021 5:14:42 PM Request for Review Comments returned by PCD Engineering Division
9/28/2021 12:09:07 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
9/28/2021 12:09:01 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
9/28/2021 12:08:55 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/28/2021 12:07:31 PM Submission Triaged
9/28/2021 10:20:04 AM Submission received from Applicant
9/16/2021 7:14:33 AM Submission request sent to Applicant
9/16/2021 7:13:54 AM Request for Review Comments returned by PCD Project Manager
9/15/2021 2:28:28 PM Request for Review Comments returned by PCD Engineering Division
8/17/2021 7:28:41 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
8/17/2021 7:28:34 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/17/2021 7:24:59 AM Submission Triaged
8/17/2021 7:23:24 AM Submission received from Applicant
8/17/2021 7:03:47 AM Submission request sent to Applicant
8/17/2021 7:02:54 AM Request for Review Comments returned by PCD Project Manager
8/11/2021 12:11:42 PM Request for Review Comments returned by PCD Engineering Division
8/3/2021 7:21:03 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
8/3/2021 7:20:56 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/3/2021 7:18:45 AM Submission Triaged
8/3/2021 5:33:05 AM Submission received from Applicant
7/16/2021 11:22:42 AM Submission request sent to Applicant
7/1/2021 8:26:24 AM Request for Review Comments returned by PCD Engineering Division
6/30/2021 10:35:33 AM Request for Review Comments returned by EPC Stormwater Review
6/30/2021 10:25:29 AM Request for Review Comments email resent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/30/2021 10:17:54 AM Request for Review Comments returned by EPC Stormwater Review
6/25/2021 9:34:37 AM Submission Triaged
6/25/2021 9:32:02 AM Submission received from Applicant
6/25/2021 9:23:37 AM Submission request sent to Applicant
6/25/2021 9:23:01 AM Submission Triaged
6/25/2021 9:11:31 AM Submission received from Applicant
6/24/2021 2:52:23 PM Request for Review Comments returned by PCD Project Manager
6/24/2021 2:01:59 PM Submission request sent to Applicant
6/24/2021 1:34:11 PM Submission request sent to Applicant
6/23/2021 10:42:34 AM Request for Review Comments returned by Colorado Springs Public Works
6/17/2021 8:54:35 AM Request for Review Comments returned by Colorado Springs Planning & Community Development
6/15/2021 4:55:03 PM Submission request sent to Applicant
6/9/2021 1:56:39 PM Submission Triaged
6/9/2021 1:54:27 PM Submission received from Applicant
6/9/2021 10:03:10 AM Submission request sent to Applicant
6/9/2021 9:51:15 AM Submission request sent to Applicant
5/27/2021 12:21:56 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/25/2021 7:17:01 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/25/2021 7:16:55 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
5/25/2021 7:16:47 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
5/25/2021 7:16:43 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
5/25/2021 7:16:41 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
5/25/2021 7:16:39 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
5/25/2021 7:16:33 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/25/2021 7:14:45 AM Submission Triaged
5/24/2021 10:12:41 AM Submission received from Applicant
5/24/2021 9:10:09 AM Submission request sent to Applicant
5/24/2021 9:09:30 AM Submission Triaged
5/21/2021 5:29:54 PM Submission received from Applicant
3/2/2021 8:26:18 AM Submission request sent to Applicant
3/2/2021 8:04:17 AM Request for Review Comments returned by PCD Project Manager
3/1/2021 11:35:06 AM Request for Review Comments returned by PCD Engineering Division
2/25/2021 6:08:42 PM Request for Review Comments returned by EPC Stormwater Review
2/25/2021 5:54:08 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
2/4/2021 2:15:11 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/3/2021 12:29:53 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
2/3/2021 12:29:51 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/3/2021 12:29:45 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
2/3/2021 12:29:39 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
2/3/2021 12:29:37 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
2/3/2021 12:29:35 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Joe Valdez on behalf of Black Hills Energy-Aquila
2/3/2021 12:29:30 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
2/3/2021 12:29:28 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
2/3/2021 12:29:26 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
2/3/2021 12:29:20 PM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/3/2021 12:26:04 PM Submission Triaged
2/3/2021 11:47:26 AM Submission received from Applicant
2/3/2021 8:37:32 AM Submission request sent to Applicant
11/10/2020 7:28:06 AM Submission request sent to Applicant
11/9/2020 10:38:04 AM Request for Review Comments returned by EPC Stormwater Review
11/3/2020 8:40:40 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
11/2/2020 10:38:01 PM Request for Review Comments returned by PCD Engineering Division
10/30/2020 1:48:05 PM Request for Review Comments returned by PCD Project Manager
10/30/2020 1:32:29 PM Request for Review Comments returned by Colorado Springs Public Works
10/7/2020 2:23:30 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/7/2020 9:09:12 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/7/2020 9:09:01 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
10/7/2020 9:08:55 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
10/7/2020 9:08:53 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
10/7/2020 9:08:50 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Joe Valdez on behalf of Black Hills Energy-Aquila
10/7/2020 9:08:48 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
10/7/2020 9:08:46 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
10/7/2020 9:08:42 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/7/2020 9:06:58 AM Submission Triaged
10/7/2020 8:47:36 AM Submission received from Applicant
7/30/2020 1:48:43 PM Submission request sent to Applicant
7/28/2020 8:29:05 PM Request for Review Comments returned by PCD Engineering Division
7/15/2020 7:04:46 AM Request for Review Comments returned by PCD Project Manager
7/2/2020 2:27:09 PM Request for Review Comments returned by Colorado Springs Public Works
6/15/2020 2:50:13 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/12/2020 11:32:44 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/12/2020 11:32:43 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Shirley Applegate on behalf of Colorado Springs Public Works
6/12/2020 11:32:41 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
6/12/2020 11:32:40 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Greg Smith on behalf of CIG Colorado Interstate Gas
6/12/2020 11:32:39 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Joe Valdez on behalf of Black Hills Energy-Aquila
6/12/2020 11:32:38 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
6/12/2020 11:32:37 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Kari Parsons on behalf of PCD Project Manager
6/12/2020 11:32:36 AM Request for Review Comments email sent for Project Sterling Ranch Road & Marksheffel Road CDs for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/12/2020 11:11:54 AM Fees paid: 6/12/2020 (Receipt: 1002847)
6/2/2020 4:41:18 PM Payment Request sent: 6/2/2020
6/2/2020 4:41:18 PM File # Assigned: CDR205
6/2/2020 4:41:13 PM Submission Triaged
6/2/2020 2:42:53 PM Submission received from Applicant
2/10/2020 4:27:17 PM Submission request sent to Applicant
4/24/2019 1:53:01 PM Submission request sent to Applicant
4/24/2019 11:15:57 AM Submission request sent to Applicant
4/24/2019 11:12:11 AM Project Manager Assigned: Kari Parsons
4/24/2019 11:12:11 AM Project Created