Project Details
Search |
All Active Projects
-
File Number
-
CDR204
-
Project Name
-
Sand Creek Channel Design CDs
-
Description
-
Sand Creek Channel Design Report end to end; Overall Bank / Channel Stabilization Plans 30 percent design concept from South Sterling Ranch Dev to Retreat at TimberRidge S. border.
-
Applicant
-
JR Engineering
Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241
Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241
-
EA Number
-
17-87
-
File Prefix
-
CDR - Construction Drawing Review
-
Year
-
2020
-
Project Manager
-
Kari Parsons
-
Status
-
Active
-
Created
-
4/18/2019 2:42:49 PM
View:
Review Comments
Approved Documents (2)
Project pending final approval. Some approved documents are available prior to the overall Approval.
|
Link
|
Document
|
Date
|
View
|
BMP applicability form
|
10/21/2024 3:43:35 PM
|
View
|
GEC Checklist
|
10/21/2024 3:43:36 PM
|
Additional Documents (3)
Link
|
Document
|
Comment
|
Date
|
View
|
Modified Wetland Letter
|
|
9/19/2022 8:48:11 AM
|
View
|
Supplemental Docs to Wetland Letter
|
|
9/19/2022 8:48:14 AM
|
View
|
Memo- Hydrology alternatives
|
|
9/19/2022 8:48:14 AM
|
Review Documents (37)
Link
|
Document
|
Date
|
View
|
Letter of Intent
|
10/27/2021 8:14:23 AM
|
View
|
Construction Drawings (Plans/Profiles)
|
12/24/2023 7:59:40 AM
|
View
|
Wetlands Analysis Report
|
10/29/2020 8:13:56 PM
|
View
|
Drainage Report - Final
|
4/21/2023 6:37:22 AM
|
View
|
FEMA LOMR, CLOMR, LOMA
|
5/27/2020 3:48:33 PM
|
View
|
Detention Maintenance Agreement (MS WORD version required - attachments included)
|
6/27/2024 9:22:31 AM
|
View
|
19032 GECP-SWMP Checklst
|
4/25/2023 5:24:35 AM
|
View
|
BMP applicability form
|
4/25/2023 5:08:29 AM
|
View
|
CD redlines JR Response
|
1/26/2023 5:02:38 AM
|
View
|
Channel Report redlines JR Response
|
12/29/2023 9:26:35 AM
|
View
|
Construction Dwgs sheet 41-82
|
3/26/2024 7:08:16 AM
|
View
|
Construction Dwgs sheet 83-95
|
3/26/2024 7:07:09 AM
|
View
|
Construction Dwgs sheet 96-121
|
3/26/2024 7:07:10 AM
|
View
|
Dam Safety AFC SRMD Pond 1 and 2
|
4/25/2023 5:49:50 AM
|
View
|
ESQCP form
|
4/25/2023 2:40:24 PM
|
View
|
Final Design Report
|
3/26/2024 7:08:12 AM
|
View
|
Financial Assurance Forms
|
12/24/2023 8:02:36 AM
|
View
|
GEC Checklist
|
1/26/2023 5:00:53 AM
|
View
|
Grading and erosion control plan
|
12/24/2023 8:03:27 AM
|
View
|
JR Response - Design Report comments
|
8/16/2023 10:44:56 AM
|
View
|
JR Response Design Report Comments
|
4/25/2023 5:13:15 AM
|
View
|
JR Response Engr Review Letter
|
4/25/2023 5:14:08 AM
|
View
|
JR Response to Engr Comment Letter
|
9/17/2022 8:32:38 AM
|
View
|
MDDP Amendment
|
4/21/2023 6:29:17 AM
|
View
|
MDDP redlines JR Response
|
1/26/2023 5:01:50 AM
|
View
|
O and M plan for Channel Maint Agreement
|
8/16/2023 9:28:41 AM
|
View
|
Pages 41-95 of Construction Drawings
|
4/21/2023 6:49:23 AM
|
View
|
Pages 96-121 of Construction Drawings
|
4/21/2023 6:50:58 AM
|
View
|
PE memo to support design
|
8/16/2023 10:44:56 AM
|
View
|
PE support memo for design
|
12/29/2023 9:29:17 AM
|
View
|
pg 41-82 of JR CD set
|
12/24/2023 8:05:39 AM
|
View
|
pg 83-95 of JR CD set
|
12/24/2023 8:07:24 AM
|
View
|
Response to comments
|
4/12/2022 3:13:54 PM
|
View
|
SC Cds pg 1-40
|
3/26/2024 7:09:22 AM
|
View
|
Structural CD set
|
12/24/2023 8:09:48 AM
|
View
|
Structural Plans done by San Engineering
|
8/16/2023 10:43:29 AM
|
View
|
SWMP
|
4/25/2023 5:27:30 AM
|