                        5/13/2022 10:42:00 AM
                     | 
                    
                        Project Closed
                     | 
                
                
                    | 
                        5/13/2022 10:42:00 AM
                     | 
                    
                        Project Approved: 5/13/2022
                     | 
                
                
                    | 
                        7/20/2020 1:57:18 PM
                     | 
                    
                        Request for Review Comments returned by PCD Engineering Division
                     | 
                
                
                    | 
                        7/16/2020 5:55:22 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills Ranch Filings 1-3 at Meridina Ranch PUDSP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
                     | 
                
                
                    | 
                        7/16/2020 5:54:29 AM
                     | 
                    
                        Submission Triaged
                     | 
                
                
                    | 
                        7/15/2020 10:56:32 AM
                     | 
                    
                        Submission received from Applicant
                     | 
                
                
                    | 
                        7/14/2020 5:34:00 PM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        7/13/2020 10:33:31 AM
                     | 
                    
                        Request for Review Comments returned by PCD Engineering Division
                     | 
                
                
                    | 
                        7/9/2020 11:49:17 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills Ranch Filings 1-3 at Meridina Ranch PUDSP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
                     | 
                
                
                    | 
                        7/9/2020 11:48:44 AM
                     | 
                    
                        Submission Triaged
                     | 
                
                
                    | 
                        7/8/2020 4:32:53 PM
                     | 
                    
                        Submission received from Applicant
                     | 
                
                
                    | 
                        7/8/2020 5:11:06 AM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        7/7/2020 3:46:53 PM
                     | 
                    
                        Request for Review Comments returned by PCD Engineering Division
                     | 
                
                
                    | 
                        7/1/2020 5:44:59 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills Ranch Filings 1-3 at Meridina Ranch PUDSP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
                     | 
                
                
                    | 
                        7/1/2020 5:43:27 AM
                     | 
                    
                        Submission Triaged
                     | 
                
                
                    | 
                        6/30/2020 4:12:28 PM
                     | 
                    
                        Submission received from Applicant
                     | 
                
                
                    | 
                        6/25/2020 8:11:48 PM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        6/16/2020 8:57:04 AM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        6/16/2020 8:56:29 AM
                     | 
                    
                        Request for Review Comments returned by PCD Project Manager
                     | 
                
                
                    | 
                        6/16/2020 8:48:45 AM
                     | 
                    
                        Request for Review Comments email resent for Project Rolling Hills Ranch Filings 1-3 at Meridina Ranch PUDSP for review by Nina Ruiz on behalf of PCD Project Manager
                     | 
                
                
                    | 
                        6/15/2020 11:46:10 AM
                     | 
                    
                        Request for Review Comments returned by PCD Engineering Division
                     | 
                
                
                    | 
                        6/5/2020 7:32:57 AM
                     | 
                    
                        Request for Review Comments returned by PCD Project Manager
                     | 
                
                
                    | 
                        6/3/2020 9:35:28 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
                     | 
                
                
                    | 
                        5/22/2020 8:09:19 AM
                     | 
                    
                        Request for Review Comments returned by 911 Authority - El Paso/Teller County
                     | 
                
                
                    | 
                        5/4/2020 3:26:56 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
                     | 
                
                
                    | 
                        5/4/2020 3:26:55 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Nina Ruiz on behalf of PCD Project Manager
                     | 
                
                
                    | 
                        5/4/2020 3:26:53 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
                     | 
                
                
                    | 
                        5/4/2020 3:20:56 PM
                     | 
                    
                        Submission Triaged
                     | 
                
                
                    | 
                        4/30/2020 5:17:54 PM
                     | 
                    
                        Submission received from Applicant
                     | 
                
                
                    | 
                        4/28/2020 4:02:54 PM
                     | 
                    
                        Request for Review Comments returned by EPC County Attorney's Office
                     | 
                
                
                    | 
                        4/23/2020 10:31:57 AM
                     | 
                    
                        Request for Review Comments returned by EPC Health Department
                     | 
                
                
                    | 
                        4/22/2020 5:54:48 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Edi Anderson on behalf of EPC County Attorney's Office
                     | 
                
                
                    | 
                        4/21/2020 5:12:41 PM
                     | 
                    
                        Request for Review Comments returned by Colorado Division of Water Resources
                     | 
                
                
                    | 
                        4/15/2020 4:12:10 PM
                     | 
                    
                        Request for Review Comments returned by EPC Stormwater Review
                     | 
                
                
                    | 
                        4/15/2020 1:55:13 PM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        4/15/2020 1:50:35 PM
                     | 
                    
                        Request for Review Comments returned by PCD Project Manager
                     | 
                
                
                    | 
                        4/7/2020 4:29:45 PM
                     | 
                    
                        Request for Review Comments returned by PCD Engineering Division
                     | 
                
                
                    | 
                        4/1/2020 12:27:57 PM
                     | 
                    
                        Request for Review Comments returned by Falcon Fire Protection District
                     | 
                
                
                    | 
                        3/23/2020 11:53:32 AM
                     | 
                    
                        Request for Review Comments returned by 911 Authority - El Paso/Teller County
                     | 
                
                
                    | 
                        3/17/2020 5:00:36 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
                     | 
                
                
                    | 
                        3/12/2020 3:38:17 PM
                     | 
                    
                        Request for Review Comments returned by RBD Floodplain
                     | 
                
                
                    | 
                        3/12/2020 3:30:23 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Keith Curtis on behalf of RBD Floodplain
                     | 
                
                
                    | 
                        3/12/2020 3:30:22 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
                     | 
                
                
                    | 
                        3/12/2020 3:30:21 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Joanna Williams on behalf of Colorado Division of Water Resources
                     | 
                
                
                    | 
                        3/12/2020 3:30:16 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by  on behalf of EPC Health Department
                     | 
                
                
                    | 
                        3/12/2020 3:30:15 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Nina Ruiz on behalf of PCD Project Manager
                     | 
                
                
                    | 
                        3/12/2020 3:30:13 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
                     | 
                
                
                    | 
                        3/12/2020 3:08:09 PM
                     | 
                    
                        Submission Triaged
                     | 
                
                
                    | 
                        3/11/2020 9:02:14 PM
                     | 
                    
                        Submission received from Applicant
                     | 
                
                
                    | 
                        3/11/2020 5:30:28 PM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        3/10/2020 10:08:28 AM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        3/2/2020 8:33:33 AM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        1/29/2020 4:26:32 PM
                     | 
                    
                        Request for Review Comments returned by EPC Health Department
                     | 
                
                
                    | 
                        1/23/2020 1:17:13 PM
                     | 
                    
                        Request for Review Comments returned by Colorado Division of Water Resources
                     | 
                
                
                    | 
                        1/7/2020 4:38:38 PM
                     | 
                    
                        Request for Review Comments returned by Colorado Parks and Wildlife
                     | 
                
                
                    | 
                        12/18/2019 12:38:05 PM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        12/18/2019 12:35:17 PM
                     | 
                    
                        Request for Review Comments returned by PCD Project Manager
                     | 
                
                
                    | 
                        12/18/2019 12:27:37 PM
                     | 
                    
                        Request for Review Comments email resent for Project Rolling Hills PUDSP for review by Nina Ruiz on behalf of PCD Project Manager
                     | 
                
                
                    | 
                        12/12/2019 4:34:01 PM
                     | 
                    
                        Request for Review Comments returned by PCD Engineering Division
                     | 
                
                
                    | 
                        12/11/2019 6:53:36 AM
                     | 
                    
                        Request for Review Comments returned by PCD Project Manager
                     | 
                
                
                    | 
                        12/2/2019 5:14:06 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Nina Ruiz on behalf of PCD Project Manager
                     | 
                
                
                    | 
                        12/2/2019 5:14:04 PM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
                     | 
                
                
                    | 
                        12/2/2019 10:23:27 AM
                     | 
                    
                        Request for Review Comments returned by Pikes Peak Regional Building Department
                     | 
                
                
                    | 
                        11/27/2019 9:32:05 AM
                     | 
                    
                        Request for Review Comments returned by El Paso County Conservation Dist
                     | 
                
                
                    | 
                        11/22/2019 2:17:26 PM
                     | 
                    
                        Request for Review Comments returned by Parks Advisory Board
                     | 
                
                
                    | 
                        11/21/2019 11:18:05 AM
                     | 
                    
                        Request for Review Comments returned by County Attorney - Development Review
                     | 
                
                
                    | 
                        11/21/2019 9:18:41 AM
                     | 
                    
                        Request for Review Comments returned by Mountain View Electric Association, Inc.
                     | 
                
                
                    | 
                        11/21/2019 8:31:00 AM
                     | 
                    
                        Request for Review Comments returned by Colorado Geological Survey
                     | 
                
                
                    | 
                        11/12/2019 12:17:14 PM
                     | 
                    
                        Request for Review Comments returned by Upper Black Squirrel Creek GWMD
                     | 
                
                
                    | 
                        11/7/2019 9:47:45 AM
                     | 
                    
                        Request for Review Comments returned by EPC Parks Department
                     | 
                
                
                    | 
                        11/6/2019 11:37:00 AM
                     | 
                    
                        Request for Review Comments returned by EPC Environmental Services
                     | 
                
                
                    | 
                        11/4/2019 1:06:57 PM
                     | 
                    
                        Request for Review Comments returned by 911 Authority - El Paso/Teller County
                     | 
                
                
                    | 
                        11/1/2019 12:17:33 PM
                     | 
                    
                        Request for Review Comments returned by EPC County Attorney's Office
                     | 
                
                
                    | 
                        11/1/2019 10:54:15 AM
                     | 
                    
                        Request for Review Comments returned by RBD Floodplain
                     | 
                
                
                    | 
                        11/1/2019 8:33:57 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Autumn Mason on behalf of Woodmen Road Metro
                     | 
                
                
                    | 
                        11/1/2019 8:33:55 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
                     | 
                
                
                    | 
                        11/1/2019 8:33:54 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Mr. David Pelser on behalf of Meridian Ranch/Meridian Service Metro Dist.
                     | 
                
                
                    | 
                        11/1/2019 8:33:52 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Melissa Andrews on behalf of Falcon School District 49
                     | 
                
                
                    | 
                        11/1/2019 8:33:51 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
                     | 
                
                
                    | 
                        11/1/2019 8:33:50 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Pamela Davison on behalf of El Paso County Conservation Dist
                     | 
                
                
                    | 
                        11/1/2019 8:33:48 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
                     | 
                
                
                    | 
                        11/1/2019 8:33:47 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
                     | 
                
                
                    | 
                        11/1/2019 8:33:44 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
                     | 
                
                
                    | 
                        11/1/2019 8:33:44 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Keith Curtis on behalf of RBD Floodplain
                     | 
                
                
                    | 
                        11/1/2019 8:33:42 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
                     | 
                
                
                    | 
                        11/1/2019 8:33:41 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
                     | 
                
                
                    | 
                        11/1/2019 8:33:41 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Larry Long on behalf of Colorado State Forest Service
                     | 
                
                
                    | 
                        11/1/2019 8:33:40 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
                     | 
                
                
                    | 
                        11/1/2019 8:33:39 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Colorado Geological Survey on behalf of Colorado Geological Survey
                     | 
                
                
                    | 
                        11/1/2019 8:33:38 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Joanna Williams on behalf of Colorado Division of Water Resources
                     | 
                
                
                    | 
                        11/1/2019 8:33:37 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by  on behalf of Parks Advisory Board
                     | 
                
                
                    | 
                        11/1/2019 8:33:36 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Commander John Padgett on behalf of EPC Sheriff's Department
                     | 
                
                
                    | 
                        11/1/2019 8:33:35 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
                     | 
                
                
                    | 
                        11/1/2019 8:33:34 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by  on behalf of EPC Parks Department
                     | 
                
                
                    | 
                        11/1/2019 8:33:30 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by  on behalf of EPC Health Department
                     | 
                
                
                    | 
                        11/1/2019 8:33:30 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Kathy Andrew on behalf of EPC Environmental Services
                     | 
                
                
                    | 
                        11/1/2019 8:33:29 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Edi Anderson on behalf of EPC County Attorney's Office
                     | 
                
                
                    | 
                        11/1/2019 8:33:28 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Lori Seago on behalf of County Attorney - Development Review
                     | 
                
                
                    | 
                        11/1/2019 8:33:27 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Nina Ruiz on behalf of PCD Project Manager
                     | 
                
                
                    | 
                        11/1/2019 8:33:26 AM
                     | 
                    
                        Request for Review Comments email sent for Project Rolling Hills PUDSP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
                     | 
                
                
                    | 
                        11/1/2019 8:24:47 AM
                     | 
                    
                        Fees paid: 11/1/2019 (Receipt: 1001966)
                     | 
                
                
                    | 
                        10/30/2019 5:27:08 PM
                     | 
                    
                        Payment Request sent: 10/30/2019
                     | 
                
                
                    | 
                        10/30/2019 5:27:01 PM
                     | 
                    
                        File # Assigned: PUDSP199
                     | 
                
                
                    | 
                        10/30/2019 1:55:22 PM
                     | 
                    
                        Submission Triaged
                     | 
                
                
                    | 
                        10/29/2019 3:40:33 PM
                     | 
                    
                        Submission received from Applicant
                     | 
                
                
                    | 
                        10/28/2019 1:20:02 PM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        10/28/2019 1:19:42 PM
                     | 
                    
                        Submission Triaged
                     | 
                
                
                    | 
                        10/24/2019 10:41:23 AM
                     | 
                    
                        Submission received from Applicant
                     | 
                
                
                    | 
                        2/5/2019 4:03:21 PM
                     | 
                    
                        Submission request sent to Applicant
                     | 
                
                
                    | 
                        1/28/2019 1:09:09 PM
                     | 
                    
                        Project Manager Assigned: Nina Ruiz
                     | 
                
                
                    | 
                        1/28/2019 1:09:09 PM
                     | 
                    
                        EA Assigned: EA193
                     | 
                
                
                    | 
                        1/28/2019 1:09:09 PM
                     | 
                    
                        Project Created
                     |