Project Details

Search


File Number
SP205
Project Name
Eagle Rising Preliminary Plan Reconsideration
Description
A reconsideration of an expired 2012-SP12-6 preliminary plan
Parcels
5229000019 5229000019 5229000020 5229000020 5229000025 5229000025 5229000027 5229000027 5229000029 5229000029 5229000034 5229000034 5229000035 5229000035
Applicant
Land Resource Associates (LRA)
P.E. Next Level Development, Inc Wayne Timura ( wtimura@NLdevelopment.com )
(719) 351-8629
P.E. Next Level Development, Inc Wayne Timura ( wtimura@NLdevelopment.com )
(719) 351-8629
File Prefix
SP - Preliminary Plan
Year
2020
Project Manager
Ryan Howser
Status
Closed
Created
12/3/2018 12:34:05 PM

View: Review Comments


Approved Documents (4)

Link Document
View Drainage Report - Preliminary
View Deviation Request Form
View Deviation Request Form
View Deviation Request Form


Additional Documents (7)

Link Document Comment
View Recorded BoCC Resolution
View BoCC Memo SP-20-005 with attachments
View BoCC_Resolution_22-402
View 11/28 coordination meeting
View BOCC Staff Report - final with attachments Staff Report for the Board of County Commissioners hearing on 11/14/2024. MB
View BOCC Hearing Agenda Hearing Agenda for the Board of County Commissioners hearing on 11/14/2024. MB
View BoCC Recorded resolution no. 24-442


Review Documents (27)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 8/20/2020 1:46:20 PM
View Application/Petition Form 8/20/2020 1:46:21 PM
View Legal Description (MS WORD Version required) 9/10/2020 11:13:00 AM
View Letter of Intent 9/6/2023 4:10:53 PM
View Title Commitment (Current within 30 days of submittal) 8/20/2020 2:25:44 PM
View Vicinity/Location Map 8/20/2020 1:46:23 PM
View Grading & Erosion Control Plan (24 x 36) 10/13/2022 9:26:36 AM
View Preliminary Plan Drawings (24" x 36") 1/15/2024 5:38:29 PM
View Wetlands Analysis Report 10/6/2022 4:45:11 PM
View USF&W Clearance Letter 9/14/2023 10:51:27 AM
View Drainage Report - Preliminary 3/8/2024 3:57:24 PM
View Natural Features Report 9/14/2023 10:51:26 AM
View Soils & Geology Report 9/14/2023 10:51:25 AM
View Subdivision Summary Sheet 8/20/2020 1:46:23 PM
View Traffic Impact Study 9/27/2023 8:41:33 AM
View Creek Drainage Deviation redline 4/11/2024 2:53:28 PM
View Cul-d-sac length deviation redline 4/5/2024 9:32:39 AM
View Deviation Request Form 4/5/2024 7:00:11 PM
View Deviation Request Form 4/5/2024 7:00:12 PM
View Deviation Request Form 4/5/2024 7:00:08 PM
View Engineering Comment Responses (MVE) 3/12/2024 8:44:57 AM
View LRA Response to Comments 3/8/2024 5:53:03 PM
View Response to Comments Letter and Matrix 11/3/2023 3:33:05 PM
View Responses to TIS Redline Comments 9/14/2023 10:51:28 AM
View roadway cross section deviation redline 4/5/2024 9:32:40 AM
View Title Policy 8/20/2020 2:25:45 PM
View Updated Soils & Geology Report 2/3/2023 10:05:06 AM



Events (155)

Date Comment
4/16/2024 4:16:30 PM Project Closed
4/16/2024 4:16:30 PM Project Approved: 4/16/2024
4/16/2024 1:46:46 PM Request for Review Comments returned by PCD Engineering Division
4/11/2024 3:04:59 PM Submission Triaged
4/11/2024 2:53:46 PM Submission received from Applicant
4/11/2024 2:43:46 PM Submission request sent to Applicant
4/9/2024 7:30:53 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Gilbert LaForce on behalf of PCD Engineering Division
4/9/2024 7:30:51 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Engineering Manager on behalf of PCD Engineering Division
4/9/2024 7:29:54 AM Submission Triaged
4/5/2024 8:10:51 PM Submission received from Applicant
4/4/2024 11:09:44 AM Submission request sent to Applicant
4/2/2024 4:02:07 PM Submission request sent to Applicant
4/2/2024 3:59:24 PM Request for Review Comments returned by PCD Engineering Division
4/2/2024 3:54:54 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Gilbert LaForce on behalf of PCD Engineering Division
4/2/2024 3:54:52 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Engineering Manager on behalf of PCD Engineering Division
4/2/2024 3:53:58 PM Submission request canceled
3/28/2024 5:21:49 PM Submission request sent to Applicant
3/28/2024 5:20:20 PM Request for Review Comments returned by PCD Engineering Division
3/12/2024 10:28:00 AM Submission Triaged
3/12/2024 8:45:02 AM Submission received from Applicant
3/12/2024 7:27:42 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Gilbert LaForce on behalf of PCD Engineering Division
3/12/2024 7:27:40 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Engineering Manager on behalf of PCD Engineering Division
3/12/2024 7:26:58 AM Submission request sent to Applicant
3/12/2024 7:26:41 AM Submission Triaged
3/8/2024 5:53:10 PM Submission received from Applicant
1/31/2024 8:00:53 AM Submission request sent to Applicant
1/29/2024 1:23:17 PM Request for Review Comments returned by PCD Engineering Division
1/26/2024 4:15:17 PM Request for Review Comments returned by Black Forest Fire Protection District
1/17/2024 4:58:02 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by PJ Langmaid on behalf of Black Forest Fire Protection District
1/17/2024 4:58:00 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Black Forest Fire Chief on behalf of Black Forest Fire Protection District
1/17/2024 4:57:54 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Gilbert LaForce on behalf of PCD Engineering Division
1/17/2024 4:57:52 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Engineering Manager on behalf of PCD Engineering Division
1/17/2024 4:49:53 PM Submission Triaged
1/17/2024 4:29:20 PM Submission received from Applicant
11/21/2023 8:11:57 AM Submission request sent to Applicant
11/20/2023 1:37:46 PM Request for Review Comments returned by PCD Engineering Division
11/7/2023 2:21:13 PM Request for Review Comments returned by Black Forest Fire Protection District
11/7/2023 5:54:46 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Lupe Packman on behalf of PCD Engineering Division
11/7/2023 5:54:41 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Gilbert LaForce on behalf of PCD Engineering Division
11/7/2023 5:54:39 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/7/2023 5:54:37 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Edward Schoenheit on behalf of PCD Engineering Division
11/7/2023 5:54:36 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Engineering Manager on behalf of PCD Engineering Division
11/7/2023 5:54:34 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Charlene Durham on behalf of PCD Engineering Division
11/7/2023 5:54:32 AM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
11/7/2023 5:53:32 AM Submission Triaged
11/3/2023 9:08:47 PM Submission received from Applicant
9/29/2023 4:06:02 PM Submission request sent to Applicant
9/29/2023 4:00:23 PM Request for Review Comments returned by PCD Engineering Division
9/29/2023 3:54:30 PM Request for Review Comments email resent for Project Eagle Rising Preliminary Plan Reconsideration for review by Engineering Manager on behalf of PCD Engineering Division
9/29/2023 3:54:28 PM Request for Review Comments email resent for Project Eagle Rising Preliminary Plan Reconsideration for review by Engineering Manager on behalf of PCD Engineering Division
9/29/2023 3:20:11 PM Request for Review Comments returned by PCD Engineering Division
9/29/2023 12:42:05 PM Request for Review Comments returned by EPC County Attorney's Office
9/27/2023 8:57:39 AM Submission Triaged
9/27/2023 8:41:43 AM Submission received from Applicant
9/27/2023 7:23:49 AM Request for Review Comments returned by PCD Project Manager
9/26/2023 4:35:57 PM Submission request sent to Applicant
9/15/2023 10:41:07 AM Request for Review Comments returned by EPC Environmental Services
9/14/2023 12:24:31 PM Submission Triaged
9/14/2023 10:51:36 AM Submission received from Applicant
9/13/2023 2:53:55 PM Submission request sent to Applicant
9/13/2023 2:53:07 PM Submission request sent to Applicant
9/13/2023 2:52:36 PM Submission Triaged
9/13/2023 2:39:21 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Kathy Andrew on behalf of EPC Environmental Services
9/13/2023 2:39:18 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Edi Anderson on behalf of EPC County Attorney's Office
9/13/2023 2:39:15 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Ryan Howser on behalf of PCD Project Manager
9/13/2023 2:39:13 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Engineering Manager on behalf of PCD Engineering Division
9/13/2023 2:39:13 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Engineering Manager on behalf of PCD Engineering Division
9/13/2023 2:36:02 PM Submission Triaged
9/7/2023 1:55:45 PM Submission received from Applicant
3/2/2023 12:07:24 PM Submission request sent to Applicant
3/2/2023 12:06:04 PM Request for Review Comments returned by PCD Project Manager
3/1/2023 9:20:56 PM Request for Review Comments returned by PCD Engineering Division
2/3/2023 3:47:31 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Ryan Howser on behalf of PCD Project Manager
2/3/2023 3:47:28 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/3/2023 3:45:39 PM Submission Triaged
2/3/2023 2:34:59 PM Submission received from Applicant
1/12/2023 1:53:16 PM Submission request sent to Applicant
11/4/2022 3:50:59 PM Submission request sent to Applicant
11/4/2022 3:49:43 PM Request for Review Comments returned by PCD Project Manager
11/3/2022 4:27:41 PM Request for Review Comments returned by PCD Engineering Division
10/25/2022 9:38:12 AM Request for Review Comments returned by EPC County Attorney's Office
10/25/2022 9:29:29 AM Request for Review Comments email resent for Project Eagle Rising Preliminary Plan Reconsideration for review by Edi Anderson on behalf of EPC County Attorney's Office
10/20/2022 9:45:42 AM Request for Review Comments returned by EPC County Attorney's Office
10/19/2022 2:31:00 PM Request for Review Comments returned by EPC Environmental Services
10/13/2022 12:13:07 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Kathy Andrew on behalf of EPC Environmental Services
10/13/2022 12:13:05 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Edi Anderson on behalf of EPC County Attorney's Office
10/13/2022 12:13:04 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Ryan Howser on behalf of PCD Project Manager
10/13/2022 12:13:03 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/13/2022 12:10:44 PM Submission Triaged
10/13/2022 9:26:54 AM Submission received from Applicant
9/20/2022 5:43:22 PM Submission request sent to Applicant
9/20/2022 5:25:26 PM Project Manager Assigned: Ryan Howser
9/20/2022 4:59:53 PM Project reopened for Review Comments
1/17/2022 7:44:10 PM Project Closed
1/17/2022 7:44:10 PM Project Cancelled: 1/17/2022
12/10/2020 11:06:09 AM Submission request sent to Applicant
11/30/2020 3:10:19 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
11/17/2020 3:29:29 PM Submission Triaged
11/17/2020 1:16:12 PM Submission received from Applicant
11/15/2020 4:14:02 PM Request for Review Comments returned by EPC Health Department
11/3/2020 2:46:19 PM Submission request sent to Applicant
11/2/2020 3:59:05 PM Request for Review Comments returned by Colorado Division of Water Resources
10/20/2020 11:14:48 PM Request for Review Comments returned by PCD Engineering Division
10/13/2020 5:45:56 PM Request for Review Comments returned by PCD Project Manager
10/13/2020 2:51:05 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
10/12/2020 2:40:03 PM Request for Review Comments returned by Pikes Peak Regional Building Department
10/9/2020 11:40:39 AM Request for Review Comments returned by Parks Advisory Board
10/9/2020 11:39:21 AM Request for Review Comments returned by EPC Parks Department
10/8/2020 1:57:38 PM Request for Review Comments returned by Colorado Geological Survey
9/30/2020 8:53:39 AM Request for Review Comments returned by El Paso County Conservation Dist
9/25/2020 11:53:03 AM Request for Review Comments returned by EPC County Attorney's Office
9/24/2020 7:55:55 PM Request for Review Comments returned by Black Forest Land Use Committee
9/24/2020 2:20:55 PM Request for Review Comments returned by EPC Environmental Services
9/24/2020 12:32:46 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
9/22/2020 3:13:45 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Pam Sekac on behalf of Park Forest Water Dist
9/22/2020 3:13:43 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
9/22/2020 3:13:40 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
9/22/2020 3:13:38 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
9/22/2020 3:13:36 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Terry Stokka on behalf of Black Forest Land Use Committee
9/22/2020 3:13:34 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
9/22/2020 3:13:31 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
9/22/2020 3:13:29 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
9/22/2020 3:13:26 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Larry Long on behalf of Colorado State Forest Service
9/22/2020 3:13:24 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
9/22/2020 3:13:22 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Colorado Geological Survey on behalf of Colorado Geological Survey
9/22/2020 3:13:20 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Joanna Williams on behalf of Colorado Division of Water Resources
9/22/2020 3:13:18 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
9/22/2020 3:13:14 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by on behalf of Parks Advisory Board
9/22/2020 3:13:12 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Commander John Padgett on behalf of EPC Sheriff's Department
9/22/2020 3:13:10 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
9/22/2020 3:13:08 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by on behalf of EPC Parks Department
9/22/2020 3:13:06 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by on behalf of EPC Health Department
9/22/2020 3:13:00 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Kathy Andrew on behalf of EPC Environmental Services
9/22/2020 3:12:58 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Edi Anderson on behalf of EPC County Attorney's Office
9/22/2020 3:12:56 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Nina Ruiz on behalf of PCD Project Manager
9/22/2020 3:12:53 PM Request for Review Comments email sent for Project Eagle Rising Preliminary Plan Reconsideration for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/22/2020 3:02:06 PM Fees paid: 9/22/2020 (Receipt: 1003281)
9/11/2020 5:55:03 AM Set Applicant to Land Resource Associates (LRA)
9/11/2020 5:53:36 AM Project Manager Assigned: Nina Ruiz
9/11/2020 5:23:58 AM Payment Request sent: 9/11/2020
9/11/2020 5:23:58 AM File # Assigned: SP205
9/11/2020 5:23:55 AM Submission Triaged
9/10/2020 11:13:25 AM Submission received from Applicant
8/24/2020 12:46:45 PM Submission request sent to Applicant
8/20/2020 6:14:54 PM Submission request sent to Applicant
8/20/2020 6:13:52 PM Submission request sent to Applicant
8/20/2020 6:05:11 PM Submission request sent to Applicant
8/20/2020 6:02:10 PM Submission request sent to Applicant
8/20/2020 5:54:36 PM Submission Triaged
8/20/2020 2:26:09 PM Submission received from Applicant
8/3/2020 5:15:42 PM Submission request sent to Applicant
5/7/2020 10:51:37 AM Submission request sent to Applicant
12/3/2018 12:37:49 PM Submission request sent to Applicant
12/3/2018 12:34:22 PM Project Manager Assigned: Nina Ruiz
12/3/2018 12:34:22 PM Project Created