Project Details

Search


File Number
SF1912
Project Name
Saddlehorn (824 Acres), Final Plat
Description
Final Plat
Parcels
4300000554 4300000554 4300000556 4300000556 4300000562 4300000562
Applicant
ROI Properties
Bill Guman ( bill@guman.net )
(719) 633-9700
Bill Guman ( bill@guman.net )
(719) 633-9700
EA Number
EA18215
File Prefix
SF - Final Plat
Year
2019
Project Manager
Nina Ruiz
Status
Closed
Created
11/28/2018 5:26:36 AM

View: Review Comments



Additional Documents (20)

Link Document Comment
View Mailing Packet: Notice, Map and Labels Mailed 4/27
View Property Tax Certificates
View Title Commitment
View Recorded Plat
View Recorded Private Stormwater Facility Maintenance Agreement and Easement
View Recorded Public ROW License Agreement
View Recorded Record of Admin Action Approval of Final Plat
View Recorded SIA
View Recorded Temp Access and Utility Easement
View Recorded Temp Drainage and Utility Easement
View Recorded Temp Public Turnaround Easement_Benito Wells Trl
View Recorded Temp Public Turnaround Easement_El Raiceno Trl
View DLR approved
View CDs revised approved
View DEV04-Cul-de-sac-Length-Phasing approved
View SF19012-FDR approved
View SF19012 FAE approved
View Approved Pavement Design Report
View Recorded Avigation Easement
View Falcon FIre Protection District


Review Documents (47)

Link Document Date
View 2_detention maintenance agreement 12/28/2020 3:22:04 PM
View 4_F1 MS4 exclusion map 2/5/2020 2:13:24 PM
View 8_Saddlehorn filing utility 2/5/2020 2:13:23 PM
View CD comments 7/24/2019 11:44:16 AM
View CD Redline Responses 5/18/2020 1:20:55 PM
View Channel BMP Agreement 3/18/2021 4:09:04 PM
View Construction Document responses 9/18/2019 4:28:37 PM
View cul de sac deviation request 12/28/2020 3:56:14 PM
View Deviation Request 12/28/2020 3:09:23 PM
View Deviation request for Barrosito length 12/28/2020 4:01:36 PM
View Deviation request for Curtis Road 12/28/2020 4:01:35 PM
View Deviation request for Judge Orr Road 12/28/2020 4:01:37 PM
View Deviation Request_07.08.19 12/28/2020 2:18:30 PM
View Estimate of Guaranteed Funds 3/22/2021 7:55:35 AM
View FDR redline responses 5/18/2020 1:26:45 PM
View Filing 1 Construction Drawings - revised 9/8/2021 3:37:14 PM
View Filing one final plat comments 7/22/2019 5:35:21 PM
View Filing one utility report 7/22/2019 5:33:40 PM
View Final Plat redline responses 5/18/2020 1:33:02 PM
View Final Plat Redlines_JR Response 7/21/2020 1:51:08 PM
View Final Utility Report filing 1 4/30/2019 1:29:47 PM
View Financial Assurance Estimate 12/28/2020 2:19:54 PM
View Financial Assurance Redline Response 5/18/2020 1:26:45 PM
View Fire Protection Report Amended 7/15/2019 4:42:20 PM
View I & M Report 9/19/2019 12:06:13 PM
View I&M for filing one 7/22/2019 5:39:05 PM
View Limited Power of Attorney 8/12/2019 8:55:27 AM
View Lot closure report 7/24/2019 11:39:57 AM
View no rise letter 2/5/2020 2:13:22 PM
View No Rise Letter for Culvert_signed 12/28/2020 2:44:32 PM
View O&M Manual redline responses 5/18/2020 1:33:03 PM
View O&M Plan Redlines_JR Response 7/21/2020 1:51:09 PM
View Offsite Easements for cul-de-sac 1/29/2021 8:34:51 AM
View On site wastewater study addendum 7/23/2019 1:26:02 PM
View Redlines summary JR responses 5/18/2020 1:33:04 PM
View Revised CDs Post Approval 10/28/2021 2:22:50 PM
View Saddlehorn F1 drainage letter 10/28/2021 2:22:52 PM
View Saddlehorn Ranch noise study 5/6/2020 9:58:46 AM
View Saddlehorn Ranch Permanent Will Serve Letter 8/28/2020 10:35:42 AM
View Saddlehorn Ranch Will Serve letter_water 5/6/2020 10:10:42 AM
View Saddlehorn Transfer Covenant Final Version 11/2/2020 10:36:36 AM
View soil, geology, geologic hazard and wastewater study 5/6/2020 9:57:15 AM
View State Engineer Approval Pond G_H_I 12/28/2020 2:18:32 PM
View State Engineer Notice of Non Juridictional Pond 5/18/2020 1:20:54 PM
View SWMP 12/28/2020 2:31:20 PM
View USFWS Letter 4/25/2019 9:23:45 AM
View Utility Report 9/18/2019 4:26:46 PM



Events (258)

Date Comment
5/13/2022 10:42:19 AM Project Closed
5/13/2022 10:42:19 AM Project Approved: 5/13/2022
11/12/2021 4:23:47 PM Request for Review Comments returned by PCD Engineering Division
10/28/2021 5:24:18 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/28/2021 5:23:11 PM Submission Triaged
10/28/2021 2:23:45 PM Submission received from Applicant
10/21/2021 2:38:46 PM Submission request sent to Applicant
10/20/2021 10:10:38 AM Request for Review Comments returned by PCD Engineering Division
9/21/2021 9:16:52 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/21/2021 9:14:44 PM Submission Triaged
9/13/2021 2:41:40 PM Submission received from Applicant
9/13/2021 1:32:17 PM Submission request sent to Applicant
7/19/2021 9:27:49 PM Submission request sent to Applicant
7/13/2021 5:15:58 PM Request for Review Comments returned by PCD Engineering Division
6/13/2021 7:55:48 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/13/2021 7:53:34 PM Submission Triaged
6/11/2021 8:44:25 AM Submission received from Applicant
6/10/2021 8:19:29 AM Submission request sent to Applicant
5/6/2021 1:37:22 PM Request for Review Comments returned by PCD Engineering Division
4/30/2021 8:45:22 AM Request for Review Comments returned by EPC County Attorney's Office
4/30/2021 6:27:34 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
4/30/2021 6:27:29 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/30/2021 6:25:02 AM Submission Triaged
4/29/2021 1:10:17 PM Submission received from Applicant
4/28/2021 7:46:25 AM Request for Review Comments returned by PCD Administrative Notice
4/20/2021 12:43:01 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elena Krebs on behalf of PCD Administrative Notice
4/18/2021 12:25:43 PM Submission request sent to Applicant
4/15/2021 5:06:25 PM Request for Review Comments returned by PCD Engineering Division
4/15/2021 8:07:04 AM Request for Review Comments returned by PCD Project Manager
3/23/2021 5:19:44 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
3/23/2021 5:19:33 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/23/2021 5:12:58 PM Submission Triaged
3/22/2021 7:55:53 AM Submission received from Applicant
3/19/2021 12:36:51 PM Submission request sent to Applicant
3/19/2021 12:35:55 PM Submission Triaged
3/18/2021 4:09:15 PM Submission received from Applicant
1/6/2021 1:55:38 PM Request for Review Comments returned by EPC County Attorney's Office
1/5/2021 3:25:33 PM Submission request sent to Applicant
1/5/2021 8:01:52 AM Request for Review Comments returned by PCD Engineering Division
12/29/2020 9:03:42 PM Request for Review Comments returned by EPC Health Department
12/28/2020 4:20:49 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/28/2020 4:19:19 PM Submission Triaged
12/28/2020 4:13:22 PM Submission received from Applicant
12/25/2020 12:34:28 PM Submission request sent to Applicant
12/22/2020 2:49:10 PM Request for Review Comments returned by PCD Engineering Division
12/11/2020 3:38:59 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
12/4/2020 2:51:14 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
12/4/2020 2:51:06 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/4/2020 2:42:48 PM Submission Triaged
12/4/2020 11:07:32 AM Submission received from Applicant
11/29/2020 4:12:55 PM Request for Review Comments returned by PCD Project Manager
11/28/2020 1:35:25 PM Submission request sent to Applicant
11/25/2020 5:41:55 PM Request for Review Comments returned by PCD Engineering Division
11/23/2020 4:51:14 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
11/19/2020 8:58:08 AM Request for Review Comments returned by Colorado Division of Water Resources
11/18/2020 9:08:03 AM Request for Review Comments returned by EPC County Attorney's Office
11/5/2020 11:48:00 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
11/4/2020 9:37:09 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
11/4/2020 9:37:06 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
11/4/2020 9:37:00 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by on behalf of EPC Health Department
11/4/2020 9:36:51 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
11/4/2020 9:36:49 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
11/4/2020 9:36:41 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/4/2020 9:30:27 PM Submission Triaged
11/3/2020 4:24:53 PM Submission received from Applicant
8/25/2020 7:16:35 AM Submission request sent to Applicant
8/21/2020 6:21:44 PM Request for Review Comments returned by PCD Engineering Division
8/16/2020 7:33:17 AM Request for Review Comments returned by PCD Project Manager
7/23/2020 5:41:27 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
7/23/2020 5:41:23 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/23/2020 5:38:05 PM Submission Triaged
7/23/2020 2:28:00 PM Submission received from Applicant
7/21/2020 9:09:39 PM Submission request sent to Applicant
7/10/2020 7:35:12 AM Submission request sent to Applicant
7/10/2020 7:33:38 AM Request for Review Comments returned by PCD Project Manager
7/10/2020 7:31:08 AM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
7/9/2020 8:14:02 AM Request for Review Comments returned by PCD Engineering Division
7/8/2020 5:12:28 AM Request for Review Comments returned by PCD Project Manager
6/30/2020 10:57:02 AM Request for Review Comments returned by EPC County Attorney's Office
6/10/2020 8:47:59 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
6/9/2020 8:25:08 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
6/9/2020 8:25:06 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by on behalf of EPC Health Department
6/9/2020 8:25:04 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
6/9/2020 8:25:03 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
6/9/2020 8:25:01 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/9/2020 8:20:41 PM Submission Triaged
6/9/2020 11:11:17 AM Submission received from Applicant
4/30/2020 3:13:16 PM Submission request sent to Applicant
4/21/2020 4:45:13 PM Request for Review Comments returned by EPC Health Department
4/15/2020 8:37:32 AM Request for Review Comments returned by EPC County Attorney's Office
4/13/2020 10:34:32 PM Request for Review Comments returned by PCD Engineering Division
4/11/2020 6:54:29 AM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/10/2020 1:04:37 PM Request for Review Comments returned by PCD Engineering Division
4/8/2020 1:44:57 PM Request for Review Comments returned by PCD Project Manager
4/1/2020 12:20:15 PM Request for Review Comments returned by Falcon Fire Protection District
4/1/2020 9:44:41 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
3/18/2020 5:05:30 PM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Final Plat for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
3/18/2020 2:00:40 PM Request for Review Comments returned by Colorado Division of Water Resources
3/17/2020 1:00:01 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
3/12/2020 12:24:19 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
3/12/2020 12:24:19 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
3/12/2020 12:24:15 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
3/12/2020 12:24:14 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
3/12/2020 12:24:10 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by on behalf of EPC Health Department
3/12/2020 12:24:10 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
3/12/2020 12:24:09 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
3/12/2020 12:24:06 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/12/2020 12:12:32 PM Submission Triaged
3/11/2020 4:59:25 PM Submission received from Applicant
2/3/2020 3:48:31 PM Submission request sent to Applicant
1/29/2020 5:19:24 AM Submission request sent to Applicant
1/29/2020 5:07:36 AM Submission request sent to Applicant
1/15/2020 10:53:50 AM Request for Review Comments returned by EPC County Attorney's Office
1/10/2020 12:30:00 PM Request for Review Comments returned by PCD Engineering Division
1/9/2020 6:59:20 AM Request for Review Comments returned by PCD Project Manager
1/8/2020 3:11:04 PM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/7/2020 11:22:05 AM Request for Review Comments returned by PCD Engineering Division
12/19/2019 6:23:41 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
12/19/2019 6:23:39 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/19/2019 6:22:27 AM Submission Triaged
12/18/2019 1:39:29 PM Submission received from Applicant
12/18/2019 12:59:39 PM Submission request sent to Applicant
12/6/2019 7:06:22 PM Request for Review Comments returned by EPC Health Department
10/30/2019 7:24:21 AM Submission request sent to Applicant
10/29/2019 12:22:30 PM Request for Review Comments returned by PCD Engineering Division
10/15/2019 1:51:06 PM Request for Review Comments returned by PCD Project Manager
10/10/2019 1:06:36 PM Request for Review Comments returned by El Paso County Conservation Dist
10/9/2019 8:47:46 AM Request for Review Comments returned by Colorado Division of Water Resources
10/8/2019 11:09:19 AM Request for Review Comments returned by EPC Environmental Services
10/4/2019 11:12:14 AM Request for Review Comments returned by Colorado Geological Survey
9/26/2019 12:28:30 PM Request for Review Comments returned by Schriever AFB
9/24/2019 11:01:39 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/22/2019 11:57:34 AM Request for Review Comments returned by Parks Advisory Board
9/19/2019 2:03:17 PM Request for Review Comments returned by Central CO Conservation District
9/19/2019 12:28:05 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Darren Horstmeier on behalf of Schriever AFB
9/19/2019 12:28:01 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
9/19/2019 12:27:58 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Pamela Davison on behalf of El Paso County Conservation Dist
9/19/2019 12:27:54 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/19/2019 12:27:51 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Pamela Davidson on behalf of Central CO Conservation District
9/19/2019 12:27:47 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
9/19/2019 12:27:40 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
9/19/2019 12:27:36 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by on behalf of Parks Advisory Board
9/19/2019 12:27:22 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by on behalf of EPC Health Department
9/19/2019 12:27:18 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
9/19/2019 12:27:14 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
9/19/2019 12:27:03 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/19/2019 12:22:21 PM Submission Triaged
9/19/2019 12:15:47 PM Submission received from Applicant
9/19/2019 12:10:37 PM Submission request sent to Applicant
9/19/2019 12:10:19 PM Submission Triaged
9/19/2019 12:06:56 PM Submission received from Applicant
8/15/2019 8:26:53 AM Request for Review Comments returned by Pikes Peak Regional Building Department
8/7/2019 4:35:21 PM Submission request sent to Applicant
8/7/2019 12:39:59 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
8/1/2019 7:55:38 AM Submission request sent to Applicant
7/30/2019 10:40:51 AM Request for Review Comments returned by EPC Parks Department
7/25/2019 12:36:06 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
7/25/2019 12:19:19 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
7/25/2019 12:19:15 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
7/25/2019 12:19:08 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
7/25/2019 12:19:04 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by on behalf of EPC Parks Department
7/25/2019 12:19:00 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
7/25/2019 12:18:50 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/25/2019 12:16:43 PM Submission Triaged
7/24/2019 4:21:48 PM Submission received from Applicant
7/9/2019 9:21:20 AM Submission request sent to Applicant
6/24/2019 4:45:01 PM Request for Review Comments returned by EPC Health Department
6/17/2019 5:12:00 PM Submission request sent to Applicant
6/17/2019 5:02:54 PM Submission request sent to Applicant
6/17/2019 4:15:27 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/14/2019 6:08:19 PM Request for Review Comments returned by PCD Engineering Division
6/13/2019 4:41:22 PM Request for Review Comments returned by Parks Advisory Board
6/6/2019 4:45:42 PM Request for Review Comments returned by Colorado Division of Water Resources
6/5/2019 12:54:23 PM Request for Review Comments returned by EPC Parks Department
6/4/2019 4:59:16 PM Request for Review Comments returned by Colorado Geological Survey
6/3/2019 10:08:58 AM Request for Review Comments returned by Pikes Peak Regional Building Department
6/1/2019 11:44:08 AM Request for Review Comments returned by PCD Project Manager
6/1/2019 9:52:15 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/31/2019 2:27:17 PM Request for Review Comments returned by Falcon Fire Protection District
5/30/2019 8:42:23 AM Request for Review Comments returned by El Paso County Conservation Dist
5/29/2019 9:34:29 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
5/29/2019 4:30:58 AM Request for Review Comments email resent for Project 824 Acres, Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
5/23/2019 2:28:00 PM Request for Review Comments returned by EPC Environmental Services
5/16/2019 10:03:15 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
5/16/2019 10:02:38 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
5/15/2019 3:22:55 PM Request for Review Comments returned by Central CO Conservation District
5/15/2019 3:21:06 PM Request for Review Comments returned by Central CO Conservation District
5/15/2019 10:58:20 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/15/2019 10:57:35 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/15/2019 8:06:40 AM Request for Review Comments returned by Schriever AFB
5/15/2019 8:05:24 AM Request for Review Comments returned by Schriever AFB
5/14/2019 4:19:36 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Darren Horstmeier on behalf of Schriever AFB
5/14/2019 4:19:34 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
5/14/2019 4:19:31 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Dave Elliott on behalf of Meadow Lake Airport Association
5/14/2019 4:19:29 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Melissa Andrews on behalf of Falcon School District 49
5/14/2019 4:19:27 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
5/14/2019 4:19:25 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Pamela Davison on behalf of El Paso County Conservation Dist
5/14/2019 4:19:22 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Darren Horstmeier on behalf of Schriever AFB
5/14/2019 4:19:22 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Pamela Davidson on behalf of Central CO Conservation District
5/14/2019 4:19:20 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila
5/14/2019 4:19:20 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
5/14/2019 4:19:18 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
5/14/2019 4:19:18 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Dave Elliott on behalf of Meadow Lake Airport Association
5/14/2019 4:19:16 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Melissa Andrews on behalf of Falcon School District 49
5/14/2019 4:19:16 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
5/14/2019 4:19:14 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
5/14/2019 4:19:14 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
5/14/2019 4:19:12 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Pamela Davison on behalf of El Paso County Conservation Dist
5/14/2019 4:19:12 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
5/14/2019 4:19:10 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Pamela Davidson on behalf of Central CO Conservation District
5/14/2019 4:19:10 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by John Bauer on behalf of Federal Aviation Administration (FAA)
5/14/2019 4:19:07 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila
5/14/2019 4:19:07 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Larry Long on behalf of Colorado State Forest Service
5/14/2019 4:19:05 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
5/14/2019 4:19:04 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
5/14/2019 4:19:02 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
5/14/2019 4:19:02 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
5/14/2019 4:19:00 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
5/14/2019 4:19:00 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
5/14/2019 4:18:58 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
5/14/2019 4:18:56 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
5/14/2019 4:18:56 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by John Bauer on behalf of Federal Aviation Administration (FAA)
5/14/2019 4:18:53 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Larry Long on behalf of Colorado State Forest Service
5/14/2019 4:18:53 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by on behalf of Parks Advisory Board
5/14/2019 4:18:51 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department
5/14/2019 4:18:51 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
5/14/2019 4:18:49 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
5/14/2019 4:18:49 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
5/14/2019 4:18:47 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by on behalf of EPC Parks Department
5/14/2019 4:18:47 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
5/14/2019 4:18:43 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
5/14/2019 4:18:41 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by on behalf of EPC Health Department
5/14/2019 4:18:41 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by on behalf of Parks Advisory Board
5/14/2019 4:18:39 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department
5/14/2019 4:18:39 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
5/14/2019 4:18:37 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
5/14/2019 4:18:37 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
5/14/2019 4:18:35 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
5/14/2019 4:18:35 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by on behalf of EPC Parks Department
5/14/2019 4:18:33 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/14/2019 4:18:28 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by on behalf of EPC Health Department
5/14/2019 4:18:25 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
5/14/2019 4:18:23 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
5/14/2019 4:18:21 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
5/14/2019 4:18:19 PM Request for Review Comments email sent for Project 824 Acres, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/14/2019 4:15:31 PM Fees paid: 5/14/2019 (Receipt: 1001449)
5/7/2019 3:22:32 PM Payment Request sent: 5/7/2019
5/7/2019 3:22:16 PM File # Assigned: SF1912
5/6/2019 3:06:38 PM Submission Triaged
5/6/2019 1:40:17 PM Submission received from Applicant
5/6/2019 11:52:11 AM Submission request sent to Applicant
5/6/2019 11:51:31 AM Submission Triaged
4/30/2019 5:26:21 PM Submission received from Applicant
1/28/2019 9:53:49 AM Submission request sent to Applicant
11/28/2018 5:31:57 AM Submission request sent to Applicant
11/28/2018 5:26:53 AM Project Manager Assigned: Nina Ruiz
11/28/2018 5:26:53 AM EA Assigned: EA18215
11/28/2018 5:26:53 AM Project Created