7/15/2019 7:35:03 AM
|
Project Closed
|
7/15/2019 7:35:03 AM
|
Project Approved: 7/15/2019
|
5/22/2019 3:36:43 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/22/2019 12:53:33 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/22/2019 12:52:59 PM
|
Submission Triaged
|
5/22/2019 11:09:30 AM
|
Submission received from Applicant
|
5/22/2019 7:41:03 AM
|
Submission request sent to Applicant
|
5/21/2019 10:44:03 AM
|
Submission request sent to Applicant
|
5/21/2019 10:42:34 AM
|
Request for Review Comments returned by PCD Engineering Division
|
5/20/2019 10:47:20 AM
|
Submission request sent to Applicant
|
5/20/2019 5:34:12 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/20/2019 5:33:10 AM
|
Submission Triaged
|
5/17/2019 1:59:57 PM
|
Submission received from Applicant
|
5/17/2019 1:41:20 PM
|
Submission request sent to Applicant
|
5/17/2019 11:34:55 AM
|
Submission request sent to Applicant
|
5/17/2019 10:21:25 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/16/2019 1:53:19 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
5/14/2019 3:19:58 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/14/2019 12:51:23 PM
|
Request for Review Comments returned by EPC Environmental Services
|
5/13/2019 12:33:21 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
5/13/2019 12:33:19 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
5/13/2019 12:33:13 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/13/2019 12:32:20 PM
|
Submission Triaged
|
5/13/2019 9:44:56 AM
|
Submission received from Applicant
|
5/9/2019 8:17:32 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
5/9/2019 5:07:27 AM
|
Submission request sent to Applicant
|
5/8/2019 9:20:50 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
5/7/2019 7:02:06 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
5/6/2019 3:47:20 PM
|
Submission request sent to Applicant
|
5/6/2019 3:46:20 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/6/2019 2:22:19 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
5/6/2019 12:29:06 PM
|
Request for Review Comments email resent for Project Winsome (McCune Ranch) Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
5/6/2019 11:37:19 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
5/6/2019 8:31:25 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/3/2019 1:29:01 PM
|
Request for Review Comments returned by Parks Advisory Board
|
5/3/2019 1:28:05 PM
|
Request for Review Comments returned by EPC Parks Department
|
5/3/2019 9:33:35 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
5/1/2019 3:21:44 PM
|
Request for Review Comments returned by EPC Health Department
|
4/30/2019 4:30:43 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
4/30/2019 10:30:58 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/25/2019 10:24:17 AM
|
Request for Review Comments returned by EPC Environmental Services
|
4/24/2019 3:43:20 PM
|
Submission Triaged
|
4/23/2019 8:29:54 PM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
4/23/2019 12:37:38 PM
|
Submission received from Applicant
|
4/22/2019 5:04:09 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
4/22/2019 7:11:21 AM
|
Submission request sent to Applicant
|
4/18/2019 2:14:43 PM
|
Submission request sent to Applicant
|
4/17/2019 10:02:25 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
4/17/2019 7:50:01 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
4/16/2019 2:10:53 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/15/2019 12:49:52 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Neelha Mudigonda on behalf of Colorado Division of Water Resources
|
4/15/2019 12:49:23 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/15/2019 12:48:22 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
4/15/2019 12:48:20 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
4/15/2019 12:48:18 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
|
4/15/2019 12:48:18 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
4/15/2019 12:48:17 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
4/15/2019 12:48:14 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
4/15/2019 12:48:13 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
|
4/15/2019 12:48:12 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
4/15/2019 12:48:11 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
4/15/2019 12:48:09 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
4/15/2019 12:48:08 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by on behalf of Parks Advisory Board
|
4/15/2019 12:48:07 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by on behalf of EPC Parks Department
|
4/15/2019 12:48:06 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
4/15/2019 12:48:05 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
4/15/2019 12:48:04 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
4/15/2019 12:44:08 PM
|
Submission Triaged
|
4/15/2019 12:40:34 PM
|
Submission received from Applicant
|
4/15/2019 12:19:33 PM
|
Submission request sent to Applicant
|
4/15/2019 12:19:21 PM
|
Submission Triaged
|
4/12/2019 1:27:22 PM
|
Submission received from Applicant
|
4/11/2019 3:35:53 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/4/2019 5:34:38 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Neelha Mudigonda on behalf of Colorado Division of Water Resources
|
4/4/2019 2:20:03 PM
|
Submission request sent to Applicant
|
4/4/2019 10:05:32 AM
|
Submission request sent to Applicant
|
4/4/2019 10:02:26 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/3/2019 10:51:42 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
4/3/2019 2:01:47 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/3/2019 10:01:00 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/1/2019 4:12:43 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
3/24/2019 4:14:48 PM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
3/22/2019 9:48:40 AM
|
Request for Review Comments returned by EPC Environmental Services
|
3/20/2019 2:54:38 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
3/20/2019 8:10:58 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/15/2019 10:51:57 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/13/2019 8:01:30 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
3/13/2019 8:01:28 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
3/13/2019 8:01:26 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
3/13/2019 8:01:24 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
3/13/2019 8:01:20 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/13/2019 8:01:17 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Neelha Mudigonda on behalf of Colorado Division of Water Resources
|
3/13/2019 8:01:09 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by on behalf of EPC Health Department
|
3/13/2019 8:01:07 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/13/2019 8:01:03 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
3/13/2019 8:01:01 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
3/13/2019 8:00:55 AM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/13/2019 7:55:23 AM
|
Submission Triaged
|
3/12/2019 5:48:11 PM
|
Submission received from Applicant
|
3/12/2019 10:35:27 AM
|
Submission request sent to Applicant
|
3/4/2019 12:22:43 PM
|
Submission request sent to Applicant
|
2/21/2019 1:41:04 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/20/2019 10:47:48 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
2/15/2019 2:14:54 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
2/13/2019 7:13:43 AM
|
Submission request sent to Applicant
|
2/13/2019 7:11:26 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/11/2019 11:51:45 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/11/2019 11:07:35 AM
|
Request for Review Comments returned by PCD Engineering Division
|
2/9/2019 11:35:15 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
2/5/2019 8:15:15 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/25/2019 1:12:45 PM
|
Request for Review Comments returned by EPC Parks Department
|
1/24/2019 12:00:05 PM
|
Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Dam Safety Engineer Kallie Bauer on behalf of Colorado Dam Safety Division
|
1/23/2019 12:48:58 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
1/23/2019 11:31:24 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/22/2019 4:31:08 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
1/22/2019 4:31:06 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
|
1/22/2019 4:31:04 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
1/22/2019 4:31:02 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
1/22/2019 4:31:00 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
1/22/2019 4:30:56 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/22/2019 4:30:53 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Neelha Mudigonda on behalf of Colorado Division of Water Resources
|
1/22/2019 4:30:51 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by on behalf of EPC Parks Department
|
1/22/2019 4:30:47 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
1/22/2019 4:30:45 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
1/22/2019 4:30:39 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/22/2019 4:28:42 PM
|
Submission Triaged
|
1/18/2019 11:46:08 AM
|
Submission received from Applicant
|
1/14/2019 3:59:43 PM
|
Submission request sent to Applicant
|
12/19/2018 9:33:46 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
11/30/2018 11:44:48 PM
|
Request for Review Comments returned by Black Forest Trails Association
|
11/29/2018 9:22:06 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
11/19/2018 3:27:32 PM
|
Request for Review Comments returned by Parks Advisory Board
|
11/18/2018 11:51:09 AM
|
Request for Review Comments returned by EPC Health Department
|
11/14/2018 11:24:12 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
11/13/2018 5:03:57 PM
|
Submission request sent to Applicant
|
11/13/2018 5:00:47 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/13/2018 4:50:04 PM
|
Request for Review Comments email resent for Project McCune Ranch Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
11/13/2018 4:29:10 PM
|
Request for Review Comments email resent for Project McCune Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
11/13/2018 4:03:11 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/9/2018 4:28:54 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
11/8/2018 11:22:59 PM
|
Request for Review Comments returned by Black Forest Trails Association
|
11/8/2018 3:56:28 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/7/2018 1:17:15 PM
|
Submission Triaged
|
11/7/2018 11:02:36 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/6/2018 4:34:45 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
11/6/2018 4:10:57 PM
|
Submission received from Applicant
|
11/6/2018 11:09:10 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/5/2018 8:57:22 AM
|
Submission request sent to Applicant
|
11/2/2018 10:27:43 AM
|
Request for Review Comments returned by EPC Environmental Services
|
11/1/2018 10:00:35 AM
|
Request for Review Comments returned by EPC Parks Department
|
11/1/2018 8:50:43 AM
|
Submission Triaged
|
10/31/2018 4:48:49 PM
|
Submission received from Applicant
|
10/31/2018 3:36:39 PM
|
Submission request sent to Applicant
|
10/25/2018 1:21:58 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/22/2018 3:47:49 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
10/22/2018 1:25:45 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
10/22/2018 11:33:47 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
10/18/2018 12:43:19 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
10/18/2018 12:43:18 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
10/18/2018 12:43:17 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
|
10/18/2018 12:43:16 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Melissa Andrews on behalf of Falcon 49
|
10/18/2018 12:43:15 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
10/18/2018 12:43:14 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
10/18/2018 12:43:13 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
10/18/2018 12:43:12 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
10/18/2018 12:43:11 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/18/2018 12:43:10 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
10/18/2018 12:43:09 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
|
10/18/2018 12:43:08 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
10/18/2018 12:43:07 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/18/2018 12:43:07 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/18/2018 12:43:05 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
10/18/2018 12:43:04 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Ross Williams on behalf of Parks Advisory Board
|
10/18/2018 12:43:03 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
10/18/2018 12:43:02 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by on behalf of EPC Parks Department
|
10/18/2018 12:43:00 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by on behalf of EPC Health Department
|
10/18/2018 12:42:59 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/18/2018 12:42:58 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
10/18/2018 12:42:57 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
10/18/2018 12:42:56 PM
|
Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/18/2018 12:38:38 PM
|
Fees paid: 10/18/2018 (Receipt: 1001031)
|
10/17/2018 12:36:44 PM
|
Payment Request sent: 10/17/2018
|
10/17/2018 12:36:29 PM
|
File # Assigned: SP186
|
10/17/2018 11:10:16 AM
|
Submission Triaged
|
10/16/2018 1:47:45 PM
|
Submission received from Applicant
|
10/16/2018 11:11:04 AM
|
Submission request sent to Applicant
|
10/16/2018 11:06:30 AM
|
Submission request canceled
|
10/16/2018 11:06:08 AM
|
Submission request sent to Applicant
|
10/16/2018 11:05:35 AM
|
Submission request sent to Applicant
|
10/16/2018 8:50:53 AM
|
Submission request sent to Applicant
|
10/16/2018 8:48:54 AM
|
Submission Triaged
|
10/15/2018 6:27:09 PM
|
Submission received from Applicant
|
9/24/2018 1:50:28 PM
|
Submission request sent to Applicant
|
9/13/2018 11:02:48 AM
|
Submission request sent to Applicant
|
9/13/2018 8:18:44 AM
|
Project Manager Assigned: Nina Ruiz
|
9/13/2018 8:18:44 AM
|
Project Created
|