Project Details

Search


File Number
SP186
Project Name
Winsome (McCune Ranch) Preliminary Plan
Parcels
5100000493 5100000493
Applicant
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
File Prefix
SP - Preliminary Plan
Year
2018
Project Manager
Nina Ruiz
Status
Closed
Created
9/13/2018 8:18:28 AM

View: Review Comments


Approved Documents (3)

Link Document
View Drainage Report - Preliminary
View Traffic Impact Study
View Deviation Request for Access Spacing


Additional Documents (14)

Link Document Comment
View Letter of Opposition
View Approved Deviation for Intersection Spacing
View PC Mail Notice
View Property Posting
View PC SR SP-18-006
View Neighbor Comments Received 5.30.19
View Adjacent Property Owner Response 6.3.19
View BoCC Hearing Date Notice
View Adjacent Owner Letter 6.17.19
View BoCC Sign Posting
View Letter Against 6.26.19
View BoCC Staff Report
View BoCC Approval
View PC Resolution


Review Documents (40)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 10/15/2018 6:26:51 PM
View Application/Petition Form 1/18/2019 10:00:16 AM
View Legal Description (MS WORD Version required) 10/12/2018 10:22:32 AM
View Letter of Intent 4/22/2019 8:10:58 AM
View OWTS Report 1/18/2019 10:33:59 AM
View Title Commitment (Current within 30 days of submittal) 10/12/2018 10:22:34 AM
View Vicinity/Location Map 10/12/2018 10:22:35 AM
View Colorado Geological Survey Receipt 10/12/2018 10:22:29 AM
View Grading & Erosion Control Plan (24 x 36) 4/23/2019 12:35:18 PM
View Preliminary Plan Drawings (24" x 36") 5/22/2019 9:20:36 AM
View Wildlife Report 1/18/2019 10:32:08 AM
View Electric Provider Commitment Letter 10/12/2018 10:22:29 AM
View Fire Commitment Letter 10/12/2018 10:22:30 AM
View Natural Gas Commitment Letter 10/12/2018 10:22:34 AM
View Drainage Report - Preliminary 5/22/2019 8:54:26 AM
View FEMA LOMR, CLOMR, LOMA 4/15/2019 12:40:26 PM
View Fire Protection Report 1/18/2019 10:00:17 AM
View Natural Features Report 1/18/2019 10:06:36 AM
View Soils & Geology Report 1/18/2019 10:00:18 AM
View Subdivision Summary Sheet 1/18/2019 10:24:26 AM
View Traffic Impact Study 3/12/2019 10:24:27 AM
View Wildland Fire & Hazard Mitigation Plan 10/12/2018 10:22:36 AM
View Water Quality Report 3/12/2019 10:24:28 AM
View Water Resources Report 1/18/2019 10:32:06 AM
View Water Supply Information Summary 10/12/2018 10:22:36 AM
View Comment Response Letter 4/12/2019 8:20:31 AM
View Comment Response Letter 1/18/2019 11:43:43 AM
View Deviation Request for Access Spacing 5/13/2019 9:42:39 AM
View Drainage Report Comment Response letter 1/11/2019 5:52:33 PM
View Falcon Fire Department approval of cul-de-sac length 3/12/2019 10:26:50 AM
View Falcon Fire Department approval of driveway length 3/12/2019 10:26:50 AM
View Letter of Intent 4/12/2019 8:12:53 AM
View MVEA Easement Exhibit 5/22/2019 9:25:55 AM
View Response to Colorado Division of Water Resources comments 3/12/2019 10:26:51 AM
View Revised Water Report 4/12/2019 10:00:57 AM
View Signed GEC Plan 4/12/2019 8:12:52 AM
View Signed Grading Plan 4/12/2019 8:20:32 AM
View USFWS clearence 4/12/2019 8:12:53 AM
View Water comment response 4/12/2019 10:00:58 AM
View Water Supply Summary 1/18/2019 10:44:08 AM



Events (196)

Date Comment
7/15/2019 7:35:03 AM Project Closed
7/15/2019 7:35:03 AM Project Approved: 7/15/2019
5/22/2019 3:36:43 PM Request for Review Comments returned by PCD Engineering Division
5/22/2019 12:53:33 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/22/2019 12:52:59 PM Submission Triaged
5/22/2019 11:09:30 AM Submission received from Applicant
5/22/2019 7:41:03 AM Submission request sent to Applicant
5/21/2019 10:44:03 AM Submission request sent to Applicant
5/21/2019 10:42:34 AM Request for Review Comments returned by PCD Engineering Division
5/20/2019 10:47:20 AM Submission request sent to Applicant
5/20/2019 5:34:12 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/20/2019 5:33:10 AM Submission Triaged
5/17/2019 1:59:57 PM Submission received from Applicant
5/17/2019 1:41:20 PM Submission request sent to Applicant
5/17/2019 11:34:55 AM Submission request sent to Applicant
5/17/2019 10:21:25 AM Request for Review Comments returned by PCD Project Manager
5/16/2019 1:53:19 PM Request for Review Comments returned by Colorado Geological Survey
5/14/2019 3:19:58 PM Request for Review Comments returned by PCD Engineering Division
5/14/2019 12:51:23 PM Request for Review Comments returned by EPC Environmental Services
5/13/2019 12:33:21 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
5/13/2019 12:33:19 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
5/13/2019 12:33:13 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/13/2019 12:32:20 PM Submission Triaged
5/13/2019 9:44:56 AM Submission received from Applicant
5/9/2019 8:17:32 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
5/9/2019 5:07:27 AM Submission request sent to Applicant
5/8/2019 9:20:50 AM Request for Review Comments returned by Black Forest Land Use Committee
5/7/2019 7:02:06 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
5/6/2019 3:47:20 PM Submission request sent to Applicant
5/6/2019 3:46:20 PM Request for Review Comments returned by PCD Project Manager
5/6/2019 2:22:19 PM Request for Review Comments returned by Colorado Geological Survey
5/6/2019 12:29:06 PM Request for Review Comments email resent for Project Winsome (McCune Ranch) Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
5/6/2019 11:37:19 AM Request for Review Comments returned by Colorado Division of Water Resources
5/6/2019 8:31:25 AM Request for Review Comments returned by Pikes Peak Regional Building Department
5/3/2019 1:29:01 PM Request for Review Comments returned by Parks Advisory Board
5/3/2019 1:28:05 PM Request for Review Comments returned by EPC Parks Department
5/3/2019 9:33:35 AM Request for Review Comments returned by Falcon Fire Protection District
5/1/2019 3:21:44 PM Request for Review Comments returned by EPC Health Department
4/30/2019 4:30:43 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
4/30/2019 10:30:58 AM Request for Review Comments returned by PCD Engineering Division
4/25/2019 10:24:17 AM Request for Review Comments returned by EPC Environmental Services
4/24/2019 3:43:20 PM Submission Triaged
4/23/2019 8:29:54 PM Request for Review Comments returned by Black Forest Land Use Committee
4/23/2019 12:37:38 PM Submission received from Applicant
4/22/2019 5:04:09 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
4/22/2019 7:11:21 AM Submission request sent to Applicant
4/18/2019 2:14:43 PM Submission request sent to Applicant
4/17/2019 10:02:25 AM Request for Review Comments returned by EPC County Attorney's Office
4/17/2019 7:50:01 AM Request for Review Comments returned by Colorado State Forest Service
4/16/2019 2:10:53 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
4/15/2019 12:49:52 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Neelha Mudigonda on behalf of Colorado Division of Water Resources
4/15/2019 12:49:23 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/15/2019 12:48:22 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
4/15/2019 12:48:20 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
4/15/2019 12:48:18 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
4/15/2019 12:48:18 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
4/15/2019 12:48:17 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
4/15/2019 12:48:14 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
4/15/2019 12:48:13 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
4/15/2019 12:48:12 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
4/15/2019 12:48:11 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
4/15/2019 12:48:09 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
4/15/2019 12:48:08 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by on behalf of Parks Advisory Board
4/15/2019 12:48:07 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by on behalf of EPC Parks Department
4/15/2019 12:48:06 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
4/15/2019 12:48:05 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
4/15/2019 12:48:04 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
4/15/2019 12:44:08 PM Submission Triaged
4/15/2019 12:40:34 PM Submission received from Applicant
4/15/2019 12:19:33 PM Submission request sent to Applicant
4/15/2019 12:19:21 PM Submission Triaged
4/12/2019 1:27:22 PM Submission received from Applicant
4/11/2019 3:35:53 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/4/2019 5:34:38 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Neelha Mudigonda on behalf of Colorado Division of Water Resources
4/4/2019 2:20:03 PM Submission request sent to Applicant
4/4/2019 10:05:32 AM Submission request sent to Applicant
4/4/2019 10:02:26 AM Request for Review Comments returned by PCD Project Manager
4/3/2019 10:51:42 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
4/3/2019 2:01:47 PM Request for Review Comments returned by PCD Engineering Division
4/3/2019 10:01:00 AM Request for Review Comments returned by Pikes Peak Regional Building Department
4/1/2019 4:12:43 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
3/24/2019 4:14:48 PM Request for Review Comments returned by Black Forest Land Use Committee
3/22/2019 9:48:40 AM Request for Review Comments returned by EPC Environmental Services
3/20/2019 2:54:38 PM Request for Review Comments returned by EPC County Attorney's Office
3/20/2019 8:10:58 AM Request for Review Comments returned by Colorado Division of Water Resources
3/15/2019 10:51:57 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
3/13/2019 8:01:30 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
3/13/2019 8:01:28 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
3/13/2019 8:01:26 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
3/13/2019 8:01:24 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
3/13/2019 8:01:20 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
3/13/2019 8:01:17 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Neelha Mudigonda on behalf of Colorado Division of Water Resources
3/13/2019 8:01:09 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by on behalf of EPC Health Department
3/13/2019 8:01:07 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
3/13/2019 8:01:03 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
3/13/2019 8:01:01 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
3/13/2019 8:00:55 AM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/13/2019 7:55:23 AM Submission Triaged
3/12/2019 5:48:11 PM Submission received from Applicant
3/12/2019 10:35:27 AM Submission request sent to Applicant
3/4/2019 12:22:43 PM Submission request sent to Applicant
2/21/2019 1:41:04 PM Request for Review Comments returned by Colorado Division of Water Resources
2/20/2019 10:47:48 AM Request for Review Comments returned by Falcon Fire Protection District
2/15/2019 2:14:54 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
2/13/2019 7:13:43 AM Submission request sent to Applicant
2/13/2019 7:11:26 AM Request for Review Comments returned by PCD Project Manager
2/11/2019 11:51:45 AM Request for Review Comments returned by Pikes Peak Regional Building Department
2/11/2019 11:07:35 AM Request for Review Comments returned by PCD Engineering Division
2/9/2019 11:35:15 AM Request for Review Comments returned by Black Forest Land Use Committee
2/5/2019 8:15:15 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
1/25/2019 1:12:45 PM Request for Review Comments returned by EPC Parks Department
1/24/2019 12:00:05 PM Request for Review Comments email sent for Project Winsome (McCune Ranch) Preliminary Plan for review by Dam Safety Engineer Kallie Bauer on behalf of Colorado Dam Safety Division
1/23/2019 12:48:58 PM Request for Review Comments returned by EPC County Attorney's Office
1/23/2019 11:31:24 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
1/22/2019 4:31:08 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
1/22/2019 4:31:06 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
1/22/2019 4:31:04 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
1/22/2019 4:31:02 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
1/22/2019 4:31:00 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
1/22/2019 4:30:56 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
1/22/2019 4:30:53 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Neelha Mudigonda on behalf of Colorado Division of Water Resources
1/22/2019 4:30:51 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by on behalf of EPC Parks Department
1/22/2019 4:30:47 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
1/22/2019 4:30:45 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
1/22/2019 4:30:39 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/22/2019 4:28:42 PM Submission Triaged
1/18/2019 11:46:08 AM Submission received from Applicant
1/14/2019 3:59:43 PM Submission request sent to Applicant
12/19/2018 9:33:46 AM Request for Review Comments returned by Black Forest Land Use Committee
11/30/2018 11:44:48 PM Request for Review Comments returned by Black Forest Trails Association
11/29/2018 9:22:06 AM Request for Review Comments returned by Colorado Parks and Wildlife
11/19/2018 3:27:32 PM Request for Review Comments returned by Parks Advisory Board
11/18/2018 11:51:09 AM Request for Review Comments returned by EPC Health Department
11/14/2018 11:24:12 AM Request for Review Comments returned by Colorado Division of Water Resources
11/13/2018 5:03:57 PM Submission request sent to Applicant
11/13/2018 5:00:47 PM Request for Review Comments returned by PCD Project Manager
11/13/2018 4:50:04 PM Request for Review Comments email resent for Project McCune Ranch Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
11/13/2018 4:29:10 PM Request for Review Comments email resent for Project McCune Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
11/13/2018 4:03:11 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
11/9/2018 4:28:54 PM Request for Review Comments returned by Colorado Geological Survey
11/8/2018 11:22:59 PM Request for Review Comments returned by Black Forest Trails Association
11/8/2018 3:56:28 PM Request for Review Comments returned by PCD Engineering Division
11/7/2018 1:17:15 PM Submission Triaged
11/7/2018 11:02:36 AM Request for Review Comments returned by PCD Project Manager
11/6/2018 4:34:45 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
11/6/2018 4:10:57 PM Submission received from Applicant
11/6/2018 11:09:10 AM Request for Review Comments returned by Pikes Peak Regional Building Department
11/5/2018 8:57:22 AM Submission request sent to Applicant
11/2/2018 10:27:43 AM Request for Review Comments returned by EPC Environmental Services
11/1/2018 10:00:35 AM Request for Review Comments returned by EPC Parks Department
11/1/2018 8:50:43 AM Submission Triaged
10/31/2018 4:48:49 PM Submission received from Applicant
10/31/2018 3:36:39 PM Submission request sent to Applicant
10/25/2018 1:21:58 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/22/2018 3:47:49 PM Request for Review Comments returned by Falcon Fire Protection District
10/22/2018 1:25:45 PM Request for Review Comments returned by Colorado State Forest Service
10/22/2018 11:33:47 AM Request for Review Comments returned by EPC County Attorney's Office
10/18/2018 12:43:19 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
10/18/2018 12:43:18 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
10/18/2018 12:43:17 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
10/18/2018 12:43:16 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Melissa Andrews on behalf of Falcon 49
10/18/2018 12:43:15 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
10/18/2018 12:43:14 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
10/18/2018 12:43:13 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
10/18/2018 12:43:12 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
10/18/2018 12:43:11 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/18/2018 12:43:10 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
10/18/2018 12:43:09 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
10/18/2018 12:43:08 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
10/18/2018 12:43:07 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
10/18/2018 12:43:07 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
10/18/2018 12:43:05 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
10/18/2018 12:43:04 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Ross Williams on behalf of Parks Advisory Board
10/18/2018 12:43:03 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
10/18/2018 12:43:02 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by on behalf of EPC Parks Department
10/18/2018 12:43:00 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by on behalf of EPC Health Department
10/18/2018 12:42:59 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
10/18/2018 12:42:58 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
10/18/2018 12:42:57 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
10/18/2018 12:42:56 PM Request for Review Comments email sent for Project McCune Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/18/2018 12:38:38 PM Fees paid: 10/18/2018 (Receipt: 1001031)
10/17/2018 12:36:44 PM Payment Request sent: 10/17/2018
10/17/2018 12:36:29 PM File # Assigned: SP186
10/17/2018 11:10:16 AM Submission Triaged
10/16/2018 1:47:45 PM Submission received from Applicant
10/16/2018 11:11:04 AM Submission request sent to Applicant
10/16/2018 11:06:30 AM Submission request canceled
10/16/2018 11:06:08 AM Submission request sent to Applicant
10/16/2018 11:05:35 AM Submission request sent to Applicant
10/16/2018 8:50:53 AM Submission request sent to Applicant
10/16/2018 8:48:54 AM Submission Triaged
10/15/2018 6:27:09 PM Submission received from Applicant
9/24/2018 1:50:28 PM Submission request sent to Applicant
9/13/2018 11:02:48 AM Submission request sent to Applicant
9/13/2018 8:18:44 AM Project Manager Assigned: Nina Ruiz
9/13/2018 8:18:44 AM Project Created