Project Details

Search


File Number
SF2010
Project Name
PRAIRIE RIDGE (Reconsideration)
Description
A request for a reconsideration for an expired final plat SF07016
Location
North of Walker, Eastside of Brown Road
Parcels
6100000483 6100000483
Applicant
SONSHIP PROPERTIES LLC
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA18264
File Prefix
SF - Final Plat
Year
2020
Project Manager
Ryan Howser
Status
Closed
Created
8/28/2018 3:42:01 PM

View: Review Comments


Approved Documents (5)

Link Document
View Grading & Erosion Control checklist
View Financial Assurance Forms
View Grading & Erosion Control Plan (24 x 36)
View Drainage Report - Final
View Road Condition Report


Additional Documents (14)

Link Document Comment
View BOCC Hearing Notice
View Vicinity Map
View Mailing Labels
View BOCC Poster
View BOCC Memo - Final - With Attachments
View Recorded BoCC Resolution 22-310 - 222116983
View BoCC Resolution - 22-445 - Recorded 222147516
View Title Resources - Commitment for Title Insurance
View Certificate Ad Valorem Property Taxes
View Declaration of Protective Covenants - Recorded 222151684
View Subdivision Improvement Agreement - Recorded - 222151682
View Escrow Agreement - Recorded 222151683
View Recorded Plat - 222715065
View 24-31 Prairie Ridge Filing No. 1 Prelim RA


Review Documents (49)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 3/25/2020 4:46:00 PM
View Application/Petition Form 7/12/2022 4:56:09 PM
View Grading & Erosion Control checklist 7/11/2022 6:59:39 PM
View Legal Description (MS WORD Version required) 5/3/2019 3:48:18 PM
View Letter of Intent 6/4/2021 1:36:06 PM
View OWTS Report 1/14/2021 3:21:23 PM
View Title Commitment (Current within 30 days of submittal) 1/14/2021 3:21:23 PM
View Vicinity/Location Map 5/3/2019 3:48:20 PM
View Financial Assurance Forms 7/12/2022 4:56:10 PM
View Mineral Rights Certification 3/25/2020 4:46:03 PM
View Final Plat Drawings (24" x 36") 8/19/2022 4:37:38 PM
View Grading & Erosion Control Plan (24 x 36) 7/12/2022 1:38:44 PM
View Electric Provider Commitment Letter 5/3/2019 3:48:17 PM
View Natural Gas Commitment Letter 3/26/2020 10:00:30 AM
View Drainage Report - Final 7/12/2022 1:50:28 PM
View Fire Protection Report 1/14/2021 3:21:21 PM
View Soils & Geology Report 1/14/2021 3:21:22 PM
View Subdivision Summary Sheet 5/3/2019 3:48:19 PM
View Wastewater Treatment Report 1/14/2021 3:24:23 PM
View Escrow Agreement 11/2/2022 9:39:41 AM
View Signed court decrees, including augmentation plans 1/15/2021 3:17:49 PM
View Water Quality Report 3/9/2021 7:27:13 PM
View Water Resources Report 3/9/2021 7:27:15 PM
View Water Supply Information Summary 6/4/2021 1:36:07 PM
View Well Permits (if water source is wells) 6/6/2019 3:42:51 PM
View Closures Sheet (Survey) 5/3/2019 3:48:16 PM
View DEV DRAINAGE PLAN 3/8/2021 10:41:00 AM
View Draft Covenants for CAO Review 12/8/2022 3:51:15 PM
View ESQCP 7/11/2022 6:59:40 PM
View Fire Service Commitment Letter 1/14/2021 3:23:29 PM
View Geotech/Pavement Report 3/25/2020 4:46:05 PM
View HISTORIC DRAINAGE PLAN 3/8/2021 10:41:01 AM
View HOA Articles of Incorporation 12/8/2022 4:01:42 PM
View HOA Bylaws 12/8/2022 4:01:41 PM
View HOA Water Deed Form CAO Review 1/15/2021 3:06:59 PM
View Land Deed-Robertson to Sonship 6/4/2021 1:36:08 PM
View Lot Owner Water Deed Form CAO Review 1/15/2021 3:07:00 PM
View PBMP Applicability Form 7/11/2022 6:59:40 PM
View Property & Water Deed 11/18/2022 2:51:49 PM
View Proportional Contribution Update 1/15/2021 5:15:36 PM
View Recorded Water Decree 12/8/2022 3:58:37 PM
View Road Condition Report 6/11/2021 9:35:33 AM
View sample water deed 12/8/2022 3:58:38 PM
View Subdivision Improvements Agreement 9/29/2022 3:34:40 PM
View SWMP 7/11/2022 7:12:58 PM
View SWMP Checklist 7/11/2022 6:59:41 PM
View Waiver Request 2/27/2021 5:11:23 PM
View Water Deed Roberson to Sonship 6/4/2021 1:36:09 PM
View Water Deed-Rushing to Robertson 6/4/2021 1:36:08 PM



Events (175)

Date Comment
12/29/2022 9:03:36 AM Project Closed
12/29/2022 9:03:36 AM Project Approved: 12/29/2022
12/15/2022 10:25:11 AM Request for Review Comments returned by EPC County Attorney's Office
12/9/2022 2:49:55 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Edi Anderson on behalf of EPC County Attorney's Office
12/9/2022 2:48:39 PM Submission Triaged
12/8/2022 4:02:32 PM Submission received from Applicant
11/8/2022 4:38:58 PM Submission request sent to Applicant
11/8/2022 1:40:26 PM Request for Review Comments returned by County Attorney - Development Review
11/3/2022 7:55:56 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
11/3/2022 7:48:26 AM Submission Triaged
11/2/2022 9:39:49 AM Submission received from Applicant
10/20/2022 12:05:20 PM Submission request sent to Applicant
10/20/2022 11:55:29 AM Request for Review Comments returned by County Attorney - Development Review
9/30/2022 9:08:01 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
9/30/2022 9:06:24 AM Submission Triaged
9/29/2022 6:22:40 PM Submission received from Applicant
9/22/2022 3:45:09 PM Submission request sent to Applicant
9/22/2022 3:44:41 PM Submission request sent to Applicant
9/22/2022 3:44:14 PM Project reopened for Review Comments
9/15/2022 10:30:45 AM Project Ready for Approval requests. Review Comment period is complete.
8/25/2022 12:12:22 PM Request for Review Comments returned by County Attorney - Development Review
8/19/2022 4:41:19 PM Submission Triaged
8/19/2022 4:38:13 PM Submission received from Applicant
8/19/2022 10:13:24 AM Submission request sent to Applicant
8/18/2022 8:49:32 AM Request for Review Comments returned by PCD Project Manager
8/18/2022 8:42:50 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
8/16/2022 2:15:11 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
8/16/2022 8:55:24 AM Submission Triaged
8/15/2022 7:44:25 AM Submission received from Applicant
8/5/2022 3:47:10 PM Submission request sent to Applicant
8/3/2022 11:28:51 AM Request for Review Comments returned by PCD Project Manager
8/2/2022 4:38:13 PM Request for Review Comments returned by PCD Engineering Division
8/1/2022 3:28:57 PM Request for Review Comments returned by County Attorney - Development Review
7/15/2022 12:32:14 PM Request for Review Comments returned by EPC Environmental Services
7/12/2022 5:28:09 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Kathy Andrew on behalf of EPC Environmental Services
7/12/2022 5:28:07 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
7/12/2022 5:28:06 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
7/12/2022 5:28:05 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/12/2022 5:27:18 PM Submission Triaged
7/12/2022 4:58:37 PM Submission received from Applicant
7/12/2022 4:38:03 PM Submission request sent to Applicant
7/12/2022 4:37:41 PM Submission Triaged
7/12/2022 1:53:41 PM Submission received from Applicant
1/6/2022 10:27:11 AM Submission request sent to Applicant
12/3/2021 1:30:58 PM Request for Review Comments returned by County Attorney - Development Review
12/1/2021 2:43:59 PM Submission Triaged
12/1/2021 10:01:39 AM Submission received from Applicant
11/24/2021 3:10:42 PM Submission request sent to Applicant
11/24/2021 2:48:25 PM Request for Review Comments returned by PCD Engineering Division
11/24/2021 1:33:48 PM Request for Review Comments returned by EPC Stormwater Review
11/23/2021 9:45:23 AM Request for Review Comments returned by PCD Project Manager
11/18/2021 9:04:01 PM Request for Review Comments returned by EPC Health Department
11/18/2021 7:51:30 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
11/17/2021 8:45:47 PM Request for Review Comments returned by EPC Health Department
10/29/2021 4:35:42 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
10/29/2021 4:35:40 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
10/29/2021 4:35:22 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
10/29/2021 4:35:20 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
10/29/2021 4:35:16 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/29/2021 4:33:51 PM Submission Triaged
10/29/2021 2:57:55 PM Submission received from Applicant
10/21/2021 5:23:21 PM Submission request sent to Applicant
7/16/2021 11:30:48 AM Request for Review Comments returned by PCD Project Manager
7/16/2021 11:25:15 AM Request for Review Comments email resent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
7/15/2021 12:16:20 PM Request for Review Comments returned by PCD Project Manager
7/15/2021 12:09:18 PM Request for Review Comments email resent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
7/15/2021 11:39:53 AM Request for Review Comments returned by EPC Stormwater Review
7/14/2021 5:42:35 PM Request for Review Comments returned by PCD Engineering Division
7/13/2021 4:21:57 PM Request for Review Comments returned by PCD Project Manager
7/13/2021 11:23:03 AM Request for Review Comments returned by EPC County Attorney's Office
6/29/2021 10:57:15 PM Request for Review Comments returned by County Attorney - Development Review
6/21/2021 2:03:52 PM Request for Review Comments returned by EPC Environmental Services
6/16/2021 7:48:14 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
6/15/2021 1:26:37 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/15/2021 1:26:35 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
6/15/2021 1:26:31 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/15/2021 7:54:34 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
6/15/2021 7:54:32 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/15/2021 7:54:29 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
6/15/2021 7:54:17 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Kathy Andrew on behalf of EPC Environmental Services
6/15/2021 7:54:14 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Edi Anderson on behalf of EPC County Attorney's Office
6/15/2021 7:54:12 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
6/15/2021 7:54:10 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
6/15/2021 7:54:04 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/15/2021 7:51:04 AM Submission Triaged
6/11/2021 6:27:58 PM Submission received from Applicant
4/13/2021 9:14:20 AM Submission request sent to Applicant
4/13/2021 9:10:24 AM Request for Review Comments returned by PCD Project Manager
4/13/2021 9:01:32 AM Request for Review Comments email resent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
4/12/2021 1:13:20 PM Request for Review Comments returned by PCD Engineering Division
4/9/2021 8:09:21 AM Request for Review Comments returned by PCD Project Manager
3/31/2021 2:24:33 PM Request for Review Comments returned by EPC Parks Department
3/25/2021 8:21:25 AM Request for Review Comments returned by EPC County Attorney's Office
3/23/2021 12:05:46 PM Request for Review Comments returned by EPC Environmental Services
3/22/2021 8:00:09 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
3/17/2021 9:58:21 AM Request for Review Comments returned by County Attorney - Development Review
3/10/2021 6:50:01 AM Submission Triaged
3/9/2021 7:27:22 PM Submission received from Applicant
3/9/2021 5:30:17 PM Submission request sent to Applicant
3/9/2021 1:17:21 PM Request for Review Comments returned by RBD Floodplain
3/9/2021 12:33:40 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
3/9/2021 10:54:39 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Keith Curtis on behalf of RBD Floodplain
3/9/2021 10:54:37 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
3/9/2021 10:54:35 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by on behalf of EPC Parks Department
3/9/2021 10:54:33 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Kathy Andrew on behalf of EPC Environmental Services
3/9/2021 10:54:31 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Edi Anderson on behalf of EPC County Attorney's Office
3/9/2021 10:54:29 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
3/9/2021 10:54:27 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
3/9/2021 10:54:23 AM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/9/2021 10:48:52 AM Submission Triaged
3/8/2021 10:41:07 AM Submission received from Applicant
6/12/2020 2:05:36 PM Request for Review Comments returned by Parks Advisory Board
6/12/2020 2:03:37 PM Request for Review Comments returned by EPC Parks Department
6/12/2020 1:55:35 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Ross Williams on behalf of Parks Advisory Board
6/12/2020 1:55:34 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by on behalf of EPC Parks Department
6/12/2020 1:18:18 PM Request for Review Comments email resent for Project PRAIRIE RIDGE (Reconsideration) for review by on behalf of EPC Parks Department
6/4/2020 12:25:07 PM Request for Review Comments returned by County Attorney - Development Review
6/1/2020 3:45:27 PM Request for Review Comments email resent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
6/1/2020 1:34:52 PM Request for Review Comments returned by County Attorney - Development Review
5/29/2020 3:52:55 PM Request for Review Comments returned by RBD Floodplain
5/29/2020 2:58:14 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Keith Curtis on behalf of RBD Floodplain
5/29/2020 2:24:15 PM Request for Review Comments email resent for Project PRAIRIE RIDGE (Reconsideration) for review by Keith Curtis on behalf of RBD Floodplain
5/29/2020 2:12:14 PM Request for Review Comments returned by EPC Parks Department
5/29/2020 8:32:12 AM Submission request sent to Applicant
5/29/2020 8:28:56 AM Request for Review Comments returned by PCD Project Manager
5/28/2020 10:19:26 AM Request for Review Comments returned by PCD Engineering Division
5/27/2020 4:52:29 PM Request for Review Comments returned by Pikes Peak Regional Building Department
5/27/2020 2:42:19 PM Request for Review Comments returned by Colorado Division of Water Resources
5/27/2020 2:02:29 PM Request for Review Comments returned by Lewis Palmer 38
5/19/2020 1:44:19 PM Request for Review Comments returned by Black Forest Land Use Committee
5/14/2020 7:20:31 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
5/13/2020 5:12:09 PM Request for Review Comments returned by Colorado Geological Survey
5/8/2020 2:18:19 PM Request for Review Comments returned by EPC Environmental Services
5/8/2020 12:49:23 PM Request for Review Comments returned by EPC County Attorney's Office
5/7/2020 10:50:18 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/6/2020 2:18:19 PM Request for Review Comments returned by RBD Floodplain
5/6/2020 2:14:27 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Jeremy Gardner on behalf of Tri-County Fire Protection District
5/6/2020 2:14:25 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
5/6/2020 2:14:24 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Vicki Wood on behalf of Lewis Palmer 38
5/6/2020 2:14:24 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Pamela Davison on behalf of El Paso County Conservation Dist
5/6/2020 2:14:23 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Joe Valdez on behalf of Black Hills Energy-Aquila
5/6/2020 2:14:22 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Terry Stokka on behalf of Black Forest Land Use Committee
5/6/2020 2:14:21 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Keith Curtis on behalf of RBD Floodplain
5/6/2020 2:14:20 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
5/6/2020 2:14:19 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
5/6/2020 2:14:18 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
5/6/2020 2:14:16 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
5/6/2020 2:14:15 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Joanna Williams on behalf of Colorado Division of Water Resources
5/6/2020 2:14:14 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Commander John Padgett on behalf of EPC Sheriff's Department
5/6/2020 2:14:13 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by on behalf of EPC Parks Department
5/6/2020 2:14:12 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
5/6/2020 2:14:09 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Kathy Andrew on behalf of EPC Environmental Services
5/6/2020 2:14:08 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Edi Anderson on behalf of EPC County Attorney's Office
5/6/2020 2:14:08 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
5/6/2020 2:14:07 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
5/6/2020 2:14:06 PM Request for Review Comments email sent for Project PRAIRIE RIDGE (Reconsideration) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/6/2020 2:09:50 PM Fees paid: 5/6/2020 (Receipt: 1002711)
3/26/2020 10:46:54 AM Project Manager Assigned: Ryan Howser
3/26/2020 10:38:06 AM Payment Request sent: 3/26/2020
3/26/2020 10:38:06 AM File # Assigned: SF2010
3/26/2020 10:38:03 AM Submission Triaged
3/26/2020 10:00:55 AM Submission received from Applicant
3/26/2020 7:18:35 AM Submission request sent to Applicant
3/26/2020 7:18:26 AM Submission Triaged
3/25/2020 4:51:24 PM Submission received from Applicant
8/26/2019 11:16:22 AM Submission request sent to Applicant
6/7/2019 8:16:50 AM Submission request sent to Applicant
6/7/2019 8:15:53 AM Submission Triaged
6/6/2019 3:43:56 PM Submission received from Applicant
2/14/2019 11:51:28 AM Submission request sent to Applicant
2/12/2019 11:16:07 AM Submission request sent to Applicant
2/12/2019 11:03:47 AM Submission request sent to Applicant
8/28/2018 3:42:17 PM Project Manager Assigned: Gabe Sevigny
8/28/2018 3:42:16 PM EA Assigned: EA18264
8/28/2018 3:42:16 PM Project Created