9/13/2022 2:31:58 PM
|
Project Closed
|
9/13/2022 2:31:58 PM
|
Project Approved: 9/13/2022
|
8/15/2022 9:27:18 AM
|
Submission request canceled
|
8/13/2022 10:17:15 AM
|
Submission request sent to Applicant
|
8/13/2022 10:15:54 AM
|
Submission Triaged
|
8/11/2022 7:16:39 PM
|
Submission received from Applicant
|
7/6/2022 9:21:24 AM
|
Submission request sent to Applicant
|
6/30/2022 4:17:13 PM
|
Submission request sent to Applicant
|
6/30/2022 4:15:50 PM
|
Submission request sent to Applicant
|
6/30/2022 4:08:04 PM
|
Project Manager Assigned: Kari Parsons
|
6/30/2022 4:07:14 PM
|
Project reopened for Review Comments
|
5/13/2022 10:40:14 AM
|
Project Closed
|
5/13/2022 10:40:14 AM
|
Project Approved: 5/13/2022
|
11/15/2021 9:21:34 AM
|
Request for Review Comments returned by PCD Engineering Division
|
10/28/2021 5:23:07 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/28/2021 5:22:44 PM
|
Submission Triaged
|
10/27/2021 1:55:02 PM
|
Submission received from Applicant
|
10/9/2021 8:26:15 PM
|
Submission request sent to Applicant
|
10/7/2021 5:48:03 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/30/2021 10:39:48 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/30/2021 10:39:10 AM
|
Submission Triaged
|
9/28/2021 5:49:32 PM
|
Submission received from Applicant
|
8/4/2021 9:44:32 AM
|
Request for Review Comments returned by PCD Administrative Notice
|
7/29/2021 12:15:24 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Elena Krebs on behalf of PCD Administrative Notice
|
5/19/2021 8:35:13 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/18/2021 6:08:16 PM
|
Submission request sent to Applicant
|
5/18/2021 1:15:09 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/17/2021 6:09:36 PM
|
Request for Review Comments email resent for Project River Bend Residential, Final Plat #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/17/2021 2:42:14 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/26/2021 1:34:46 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Nina Ruiz on behalf of PCD Project Manager
|
4/26/2021 1:34:39 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/26/2021 1:33:53 PM
|
Submission Triaged
|
4/25/2021 8:05:49 PM
|
Submission received from Applicant
|
12/10/2020 1:30:27 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
11/23/2020 5:30:56 PM
|
Submission request sent to Applicant
|
11/23/2020 5:30:31 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/20/2020 2:52:22 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/18/2020 2:19:43 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/2/2020 2:32:12 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
10/30/2020 8:02:10 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/28/2020 5:05:50 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Edi Anderson on behalf of EPC County Attorney's Office
|
10/28/2020 5:05:21 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Kristy Martinez on behalf of Fountain
|
10/28/2020 5:05:19 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
10/28/2020 5:05:15 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/28/2020 5:05:11 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
10/28/2020 5:05:09 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Nina Ruiz on behalf of PCD Project Manager
|
10/28/2020 5:05:01 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/28/2020 5:02:04 PM
|
Submission Triaged
|
10/28/2020 7:21:03 AM
|
Submission received from Applicant
|
10/6/2020 7:26:27 AM
|
Submission request sent to Applicant
|
10/6/2020 7:26:08 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/30/2020 5:11:57 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
9/30/2020 6:33:36 AM
|
Request for Review Comments email resent for Project River Bend Residential, Final Plat #2 for review by Nina Ruiz on behalf of PCD Project Manager
|
9/28/2020 2:46:00 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/23/2020 7:13:27 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/15/2020 2:01:31 PM
|
Request for Review Comments returned by Fountain
|
8/25/2020 5:07:26 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Dennis Neal on behalf of Widefield SD 3
|
8/25/2020 5:07:25 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Richard Davis on behalf of Security Water District
|
8/25/2020 5:07:23 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Jay Adriansen on behalf of Security Sanitation District
|
8/25/2020 5:07:22 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by on behalf of Security Fire Protection District
|
8/25/2020 5:07:21 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Kristy Martinez on behalf of Fountain
|
8/25/2020 5:07:19 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
8/25/2020 5:07:18 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Nina Ruiz on behalf of PCD Project Manager
|
8/25/2020 5:07:15 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/25/2020 5:05:07 AM
|
Submission Triaged
|
8/19/2020 2:19:25 PM
|
Submission received from Applicant
|
8/18/2020 12:15:40 PM
|
Submission request sent to Applicant
|
3/27/2020 11:51:41 AM
|
Request for Review Comments returned by EPC Health Department
|
3/17/2020 10:50:47 AM
|
Submission request sent to Applicant
|
3/17/2020 10:49:54 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/16/2020 12:09:33 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/5/2020 10:41:28 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/28/2020 11:00:00 AM
|
Request for Review Comments returned by EPC Environmental Services
|
2/20/2020 12:55:44 PM
|
Request for Review Comments returned by Parks Advisory Board
|
2/20/2020 12:52:20 PM
|
Request for Review Comments returned by EPC Parks Department
|
2/19/2020 10:56:44 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
2/19/2020 10:37:03 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
2/19/2020 10:10:06 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/14/2020 8:50:30 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
2/13/2020 12:05:14 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/13/2020 12:05:13 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
2/13/2020 12:05:12 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
2/13/2020 12:05:10 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Larry Long on behalf of Colorado State Forest Service
|
2/13/2020 12:05:08 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
2/13/2020 12:05:07 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by on behalf of Parks Advisory Board
|
2/13/2020 12:05:06 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by on behalf of EPC Parks Department
|
2/13/2020 12:05:02 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by on behalf of EPC Health Department
|
2/13/2020 12:05:01 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/13/2020 12:05:00 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Edi Anderson on behalf of EPC County Attorney's Office
|
2/13/2020 12:04:59 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Nina Ruiz on behalf of PCD Project Manager
|
2/13/2020 12:04:56 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/13/2020 11:59:36 AM
|
Submission Triaged
|
2/12/2020 7:51:38 AM
|
Submission received from Applicant
|
12/15/2019 4:55:03 PM
|
Request for Review Comments returned by EPC Health Department
|
10/22/2019 9:29:13 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
10/17/2019 5:35:03 PM
|
Submission request sent to Applicant
|
10/17/2019 5:33:03 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/17/2019 5:28:24 PM
|
Request for Review Comments email resent for Project River Bend Residential, Final Plat #2 for review by Nina Ruiz on behalf of PCD Project Manager
|
10/17/2019 3:45:27 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/17/2019 9:27:13 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
10/16/2019 6:01:09 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/15/2019 8:51:58 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/10/2019 8:34:25 AM
|
Request for Review Comments returned by Parks Advisory Board
|
10/4/2019 10:57:53 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/25/2019 8:42:19 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/25/2019 7:15:00 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Kristy Martinez on behalf of Fountain
|
9/25/2019 7:14:59 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/25/2019 7:14:57 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
9/25/2019 7:14:55 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/25/2019 7:14:53 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
9/25/2019 7:14:51 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by on behalf of Parks Advisory Board
|
9/25/2019 7:14:47 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by on behalf of EPC Health Department
|
9/25/2019 7:14:45 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Edi Anderson on behalf of EPC County Attorney's Office
|
9/25/2019 7:14:44 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Nina Ruiz on behalf of PCD Project Manager
|
9/25/2019 7:14:41 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/25/2019 7:11:46 AM
|
Submission Triaged
|
9/24/2019 4:58:22 PM
|
Submission received from Applicant
|
9/24/2019 2:45:36 PM
|
Submission request sent to Applicant
|
2/14/2019 11:34:27 AM
|
Request for Review Comments returned by Parks Advisory Board
|
1/17/2019 4:40:00 PM
|
Submission request sent to Applicant
|
1/17/2019 4:27:48 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/17/2019 4:22:37 PM
|
Request for Review Comments email resent for Project River Bend Residential, Final Plat #2 for review by Nina Ruiz on behalf of PCD Project Manager
|
1/16/2019 2:58:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/10/2019 4:21:10 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/10/2019 7:45:17 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/9/2019 9:03:34 PM
|
Request for Review Comments returned by EPC Health Department
|
1/8/2019 3:38:35 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/7/2019 9:13:45 AM
|
Request for Review Comments returned by Fountain
|
1/4/2019 9:48:08 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/3/2019 11:16:31 AM
|
Request for Review Comments returned by EPC Environmental Services
|
12/26/2018 10:13:07 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/18/2018 11:17:39 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/17/2018 12:41:43 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
12/17/2018 8:15:25 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
12/15/2018 9:56:22 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Dennis Neal on behalf of Widefield SD 3
|
12/15/2018 9:56:20 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Richard Davis on behalf of Security Water District
|
12/15/2018 9:56:19 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Jay Adriansen on behalf of Security Sanitation District
|
12/15/2018 9:56:18 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by on behalf of Security Fire Protection District
|
12/15/2018 9:56:17 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Kristy Martinez on behalf of Fountain
|
12/15/2018 9:56:16 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/15/2018 9:56:15 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
12/15/2018 9:56:14 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/15/2018 9:56:13 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/15/2018 9:56:12 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
12/15/2018 9:56:11 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Larry Long on behalf of Colorado State Forest Service
|
12/15/2018 9:56:10 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
12/15/2018 9:56:08 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
12/15/2018 9:56:07 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Ross Williams on behalf of Parks Advisory Board
|
12/15/2018 9:56:06 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
12/15/2018 9:56:05 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by on behalf of EPC Parks Department
|
12/15/2018 9:56:03 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by on behalf of EPC Health Department
|
12/15/2018 9:56:02 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/15/2018 9:56:01 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Edi Anderson on behalf of EPC County Attorney's Office
|
12/15/2018 9:56:00 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Nina Ruiz on behalf of PCD Project Manager
|
12/15/2018 9:55:59 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/15/2018 9:54:27 AM
|
Fees paid: 12/15/2018 (Receipt: 1001146)
|
12/12/2018 6:04:12 AM
|
Payment Request sent: 12/12/2018
|
12/12/2018 6:04:04 AM
|
File # Assigned: SF1843
|
12/11/2018 3:53:08 PM
|
Submission Triaged
|
12/11/2018 1:57:15 PM
|
Submission received from Applicant
|
11/7/2018 11:22:09 AM
|
Submission request sent to Applicant
|
10/4/2018 10:29:45 AM
|
Submission request sent to Applicant
|
10/4/2018 10:29:39 AM
|
Submission Triaged
|
10/3/2018 3:58:03 PM
|
Submission received from Applicant
|
9/27/2018 7:52:00 AM
|
Submission request sent to Applicant
|
8/6/2018 2:18:20 PM
|
Submission request sent to Applicant
|
8/6/2018 2:13:58 PM
|
Project Manager Assigned: Nina Ruiz
|
8/6/2018 2:13:58 PM
|
EA Assigned: EA-17-086
|
8/6/2018 2:13:58 PM
|
Project Created
|