8/16/2022 4:08:33 PM
|
Project Closed
|
8/16/2022 4:08:33 PM
|
Project Approved: 8/16/2022
|
8/16/2022 4:06:14 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
8/15/2022 11:38:32 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
8/15/2022 11:38:31 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
8/15/2022 11:35:47 AM
|
Submission Triaged
|
8/15/2022 11:35:18 AM
|
Submission received from Applicant
|
8/15/2022 11:34:30 AM
|
Submission request sent to Applicant
|
8/13/2022 10:18:32 AM
|
Submission request sent to Applicant
|
8/13/2022 10:14:43 AM
|
Submission Triaged
|
8/11/2022 7:15:48 PM
|
Submission received from Applicant
|
6/30/2022 4:07:48 PM
|
Submission request sent to Applicant
|
6/30/2022 4:05:12 PM
|
Project reopened for Review Comments
|
6/30/2022 4:04:50 PM
|
Project Manager Assigned: Kari Parsons
|
5/13/2022 10:40:00 AM
|
Project Closed
|
5/13/2022 10:40:00 AM
|
Project Approved: 5/13/2022
|
11/24/2021 9:17:57 AM
|
Request for Review Comments returned by PCD Engineering Division
|
11/15/2021 4:29:51 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/15/2021 4:24:10 PM
|
Submission Triaged
|
11/15/2021 10:45:00 AM
|
Submission received from Applicant
|
10/9/2021 8:25:05 PM
|
Submission request sent to Applicant
|
10/7/2021 6:24:25 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/4/2021 2:59:36 PM
|
Submission request sent to Applicant
|
9/30/2021 10:39:49 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/30/2021 10:38:47 AM
|
Submission Triaged
|
9/28/2021 5:48:13 PM
|
Submission received from Applicant
|
8/4/2021 9:43:04 AM
|
Request for Review Comments returned by PCD Administrative Notice
|
7/29/2021 12:09:38 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Elena Krebs on behalf of PCD Administrative Notice
|
5/19/2021 8:35:25 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/19/2021 8:32:35 PM
|
Submission request sent to Applicant
|
5/19/2021 7:24:45 AM
|
Request for Review Comments returned by PCD Engineering Division
|
5/17/2021 6:09:22 PM
|
Request for Review Comments email resent for Project River Bend Residential, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/17/2021 3:15:39 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/27/2021 9:25:54 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
4/26/2021 4:35:48 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
4/26/2021 4:35:45 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
4/26/2021 4:35:37 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/26/2021 4:34:12 PM
|
Submission Triaged
|
4/26/2021 4:23:43 PM
|
Submission received from Applicant
|
4/26/2021 6:07:44 AM
|
Submission request sent to Applicant
|
12/16/2020 8:46:09 AM
|
Request for Review Comments returned by Fountain
|
12/10/2020 1:25:56 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
11/23/2020 5:23:28 PM
|
Submission request sent to Applicant
|
11/23/2020 5:22:55 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/20/2020 2:52:38 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/18/2020 1:44:35 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/2/2020 2:31:31 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
10/30/2020 7:43:58 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/28/2020 5:04:52 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Kristy Martinez on behalf of Fountain
|
10/28/2020 5:04:50 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
10/28/2020 5:04:47 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/28/2020 5:04:43 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
10/28/2020 5:04:39 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
10/28/2020 5:04:36 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
10/28/2020 5:04:28 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/28/2020 5:01:48 PM
|
Submission Triaged
|
10/28/2020 7:19:33 AM
|
Submission received from Applicant
|
10/14/2020 2:12:10 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/5/2020 1:46:34 PM
|
Submission request sent to Applicant
|
10/5/2020 9:53:09 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/30/2020 5:16:52 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
9/23/2020 9:29:28 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
9/23/2020 7:09:53 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
9/23/2020 7:09:51 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/23/2020 7:09:44 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
9/23/2020 7:08:11 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/23/2020 7:07:33 AM
|
Submission request sent to Applicant
|
9/22/2020 1:34:45 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/15/2020 2:00:53 PM
|
Request for Review Comments returned by Fountain
|
8/25/2020 5:08:48 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Kristy Martinez on behalf of Fountain
|
8/25/2020 5:08:47 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
8/25/2020 5:08:46 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
8/25/2020 5:08:42 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/25/2020 5:07:51 AM
|
Submission Triaged
|
8/19/2020 10:08:30 PM
|
Submission received from Applicant
|
8/18/2020 12:14:46 PM
|
Submission request sent to Applicant
|
5/12/2020 9:07:25 PM
|
Submission request sent to Applicant
|
3/27/2020 11:50:25 AM
|
Request for Review Comments returned by EPC Health Department
|
3/17/2020 10:40:59 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/16/2020 12:09:14 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/5/2020 10:19:48 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/28/2020 10:55:04 AM
|
Request for Review Comments returned by EPC Environmental Services
|
2/20/2020 12:55:18 PM
|
Request for Review Comments returned by Parks Advisory Board
|
2/20/2020 12:51:31 PM
|
Request for Review Comments returned by EPC Parks Department
|
2/19/2020 10:55:19 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
2/19/2020 10:37:34 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
2/19/2020 10:09:30 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/14/2020 8:52:26 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
2/13/2020 12:04:55 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/13/2020 12:04:54 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
2/13/2020 12:04:52 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
2/13/2020 12:04:50 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Larry Long on behalf of Colorado State Forest Service
|
2/13/2020 12:04:46 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
2/13/2020 12:04:44 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by on behalf of Parks Advisory Board
|
2/13/2020 12:04:42 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by on behalf of EPC Parks Department
|
2/13/2020 12:04:36 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by on behalf of EPC Health Department
|
2/13/2020 12:04:35 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/13/2020 12:04:33 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
2/13/2020 12:04:32 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
2/13/2020 12:04:30 PM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/13/2020 11:59:16 AM
|
Submission Triaged
|
2/12/2020 7:49:08 AM
|
Submission received from Applicant
|
12/4/2019 5:07:57 PM
|
Request for Review Comments returned by EPC Health Department
|
10/22/2019 9:37:11 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
10/17/2019 5:20:53 PM
|
Submission request sent to Applicant
|
10/17/2019 5:12:17 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/17/2019 5:07:42 PM
|
Request for Review Comments email resent for Project River Bend Residential, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
10/17/2019 3:45:50 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/16/2019 5:59:10 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/11/2019 1:19:24 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
10/10/2019 8:33:36 AM
|
Request for Review Comments returned by Parks Advisory Board
|
10/10/2019 8:27:23 AM
|
Request for Review Comments returned by EPC Parks Department
|
10/10/2019 7:49:19 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/26/2019 10:56:44 AM
|
Request for Review Comments returned by EPC Environmental Services
|
9/24/2019 2:08:02 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/24/2019 8:21:04 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
9/19/2019 1:35:08 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/19/2019 11:59:22 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Kristy Martinez on behalf of Fountain
|
9/19/2019 11:59:22 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/19/2019 11:59:21 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
9/19/2019 11:59:19 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/19/2019 11:59:17 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Larry Long on behalf of Colorado State Forest Service
|
9/19/2019 11:59:15 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
9/19/2019 11:59:13 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by on behalf of Parks Advisory Board
|
9/19/2019 11:59:12 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by on behalf of EPC Parks Department
|
9/19/2019 11:59:09 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by on behalf of EPC Health Department
|
9/19/2019 11:59:08 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
9/19/2019 11:59:06 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
9/19/2019 11:59:05 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
9/19/2019 11:59:02 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/19/2019 11:57:39 AM
|
Submission Triaged
|
9/12/2019 8:41:19 PM
|
Submission received from Applicant
|
2/14/2019 11:28:55 AM
|
Request for Review Comments returned by Parks Advisory Board
|
1/17/2019 4:39:17 PM
|
Submission request sent to Applicant
|
1/17/2019 4:19:39 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/17/2019 4:12:11 PM
|
Request for Review Comments email resent for Project River Bend Residential, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
1/16/2019 2:58:25 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/10/2019 4:20:04 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/10/2019 7:43:23 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/9/2019 8:52:21 PM
|
Request for Review Comments returned by EPC Health Department
|
1/8/2019 3:26:51 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/7/2019 9:12:20 AM
|
Request for Review Comments returned by Fountain
|
1/4/2019 9:24:16 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/3/2019 11:17:48 AM
|
Request for Review Comments returned by EPC Environmental Services
|
12/26/2018 10:12:31 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/18/2018 11:16:31 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/17/2018 12:28:46 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
12/17/2018 8:14:08 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
12/15/2018 9:48:10 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Dennis Neal on behalf of Widefield SD 3
|
12/15/2018 9:48:09 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Richard Davis on behalf of Security Water District
|
12/15/2018 9:48:08 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Jay Adriansen on behalf of Security Sanitation District
|
12/15/2018 9:48:07 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by on behalf of Security Fire Protection District
|
12/15/2018 9:48:06 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Kristy Martinez on behalf of Fountain
|
12/15/2018 9:48:05 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/15/2018 9:48:04 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
12/15/2018 9:48:03 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/15/2018 9:48:02 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/15/2018 9:48:01 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
12/15/2018 9:48:00 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Larry Long on behalf of Colorado State Forest Service
|
12/15/2018 9:47:59 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
12/15/2018 9:47:57 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
12/15/2018 9:47:56 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Ross Williams on behalf of Parks Advisory Board
|
12/15/2018 9:47:55 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
12/15/2018 9:47:54 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by on behalf of EPC Parks Department
|
12/15/2018 9:47:52 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by on behalf of EPC Health Department
|
12/15/2018 9:47:51 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/15/2018 9:47:50 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
12/15/2018 9:47:49 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
12/15/2018 9:47:48 AM
|
Request for Review Comments email sent for Project River Bend Residential, Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/15/2018 9:44:05 AM
|
Fees paid: 12/15/2018 (Receipt: 1001143)
|
12/12/2018 6:04:41 AM
|
Payment Request sent: 12/12/2018
|
12/12/2018 6:04:30 AM
|
File # Assigned: SF1844
|
12/11/2018 3:50:19 PM
|
Submission Triaged
|
12/11/2018 1:54:33 PM
|
Submission received from Applicant
|
11/7/2018 11:21:16 AM
|
Submission request sent to Applicant
|
10/4/2018 9:15:57 AM
|
Submission request sent to Applicant
|
10/4/2018 9:15:43 AM
|
Submission Triaged
|
10/3/2018 3:36:42 PM
|
Submission received from Applicant
|
9/27/2018 7:51:14 AM
|
Submission request sent to Applicant
|
7/19/2018 11:55:56 AM
|
Submission request sent to Applicant
|
7/19/2018 11:51:11 AM
|
Project Manager Assigned: Nina Ruiz
|
7/19/2018 11:51:10 AM
|
EA Assigned: EA-17-086
|
7/19/2018 11:51:10 AM
|
Project Created
|