5/13/2022 10:40:36 AM
|
Project Closed
|
|
5/13/2022 10:40:36 AM
|
Project Approved: 5/13/2022
|
|
2/4/2021 6:05:50 AM
|
Submission Triaged
|
|
2/1/2021 6:30:17 PM
|
Submission received from Applicant
|
|
1/27/2021 9:23:01 PM
|
Submission request sent to Applicant
|
|
1/26/2021 7:51:32 AM
|
Request for Review Comments returned by PCD Engineering Division
|
|
1/24/2021 6:30:24 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
1/24/2021 6:17:11 PM
|
Request for Review Comments email resent for Project River Bend Residential, Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
1/24/2021 2:29:19 PM
|
Submission request sent to Applicant
|
|
1/22/2021 1:15:52 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
|
1/21/2021 5:46:01 AM
|
Submission request sent to Applicant
|
|
1/20/2021 2:03:48 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
|
1/12/2021 5:26:59 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
1/5/2021 10:14:32 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
|
12/31/2020 8:52:09 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
12/31/2020 8:52:04 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
|
12/31/2020 8:51:58 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
12/31/2020 8:51:50 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
12/31/2020 8:47:12 AM
|
Submission Triaged
|
|
12/30/2020 5:24:04 PM
|
Submission received from Applicant
|
|
12/10/2020 1:22:48 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
|
12/8/2020 2:14:45 PM
|
Submission request sent to Applicant
|
|
12/8/2020 11:01:35 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
|
12/7/2020 12:03:27 PM
|
Request for Review Comments returned by EPC Health Department
|
|
11/23/2020 5:36:36 PM
|
Submission request sent to Applicant
|
|
11/23/2020 5:35:59 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
11/23/2020 9:58:10 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
|
11/20/2020 2:52:56 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
11/20/2020 12:56:34 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
|
11/20/2020 6:24:57 AM
|
Submission request sent to Applicant
|
|
11/19/2020 9:56:49 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
|
11/19/2020 5:14:28 AM
|
Request for Review Comments email resent for Project River Bend Residential, Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
11/18/2020 4:49:16 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
|
10/29/2020 2:59:07 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
|
10/28/2020 12:57:46 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Dennis Neal on behalf of Widefield SD 3
|
|
10/28/2020 12:57:44 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
|
10/28/2020 12:57:42 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Richard Davis on behalf of Security Water District
|
|
10/28/2020 12:57:40 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Jay Adriansen on behalf of Security Sanitation District
|
|
10/28/2020 12:57:38 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of Security Fire Protection District
|
|
10/28/2020 12:57:35 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Kristy Martinez on behalf of Fountain
|
|
10/28/2020 12:57:33 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
|
10/28/2020 12:57:31 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
|
10/28/2020 12:57:28 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
|
10/28/2020 12:57:20 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
|
10/28/2020 12:57:14 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
|
10/28/2020 12:57:12 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
|
10/28/2020 12:57:04 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of EPC Health Department
|
|
10/28/2020 12:56:56 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
|
10/28/2020 12:56:54 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
10/28/2020 12:56:46 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
10/28/2020 12:50:34 PM
|
Submission Triaged
|
|
10/28/2020 7:13:15 AM
|
Submission received from Applicant
|
|
10/26/2020 8:21:19 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
9/30/2020 5:17:49 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
|
9/23/2020 6:53:22 AM
|
Request for Review Comments returned by PCD Project Manager
|
|
9/23/2020 6:52:17 AM
|
Request for Review Comments email resent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
9/23/2020 6:50:54 AM
|
Submission request sent to Applicant
|
|
9/23/2020 6:49:52 AM
|
Request for Review Comments returned by PCD Project Manager
|
|
9/22/2020 4:18:47 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
|
9/22/2020 1:35:26 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
9/15/2020 2:04:33 PM
|
Request for Review Comments returned by Fountain
|
|
8/26/2020 1:13:52 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
|
8/25/2020 5:05:18 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Dennis Neal on behalf of Widefield SD 3
|
|
8/25/2020 5:05:17 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
|
8/25/2020 5:05:14 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Richard Davis on behalf of Security Water District
|
|
8/25/2020 5:05:13 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Jay Adriansen on behalf of Security Sanitation District
|
|
8/25/2020 5:05:12 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of Security Fire Protection District
|
|
8/25/2020 5:05:11 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Kristy Martinez on behalf of Fountain
|
|
8/25/2020 5:05:10 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
|
8/25/2020 5:05:09 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
8/25/2020 5:05:08 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
|
8/25/2020 5:05:06 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
|
8/25/2020 5:05:05 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
8/25/2020 5:05:02 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
8/25/2020 5:00:09 AM
|
Submission Triaged
|
|
8/19/2020 8:28:53 AM
|
Submission received from Applicant
|
|
3/27/2020 11:34:54 AM
|
Request for Review Comments returned by EPC Health Department
|
|
3/17/2020 10:26:49 AM
|
Submission request sent to Applicant
|
|
3/17/2020 10:24:40 AM
|
Submission request sent to Applicant
|
|
3/17/2020 10:20:52 AM
|
Request for Review Comments returned by PCD Project Manager
|
|
3/14/2020 1:48:26 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
3/7/2020 10:44:23 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
|
3/5/2020 3:30:20 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
|
2/28/2020 11:02:20 AM
|
Request for Review Comments returned by EPC Environmental Services
|
|
2/20/2020 12:54:46 PM
|
Request for Review Comments returned by Parks Advisory Board
|
|
2/20/2020 12:50:47 PM
|
Request for Review Comments returned by EPC Parks Department
|
|
2/19/2020 11:06:11 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
|
2/19/2020 10:36:13 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
|
2/19/2020 10:11:23 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
2/18/2020 10:30:17 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
|
2/14/2020 8:49:13 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
|
2/13/2020 12:04:24 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
2/13/2020 12:04:23 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
|
2/13/2020 12:04:21 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
|
2/13/2020 12:04:20 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
|
|
2/13/2020 12:04:19 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
2/13/2020 12:04:16 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
|
2/13/2020 12:04:14 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of Parks Advisory Board
|
|
2/13/2020 12:04:12 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of EPC Parks Department
|
|
2/13/2020 12:04:07 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of EPC Health Department
|
|
2/13/2020 12:04:05 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
|
2/13/2020 12:04:01 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
|
2/13/2020 12:03:59 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
2/13/2020 12:03:54 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
2/13/2020 11:59:09 AM
|
Submission Triaged
|
|
2/12/2020 12:10:02 AM
|
Submission received from Applicant
|
|
12/15/2019 4:37:21 PM
|
Request for Review Comments returned by EPC Health Department
|
|
11/12/2019 5:31:12 PM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
|
10/22/2019 9:37:54 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
|
10/18/2019 1:43:32 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
|
10/17/2019 5:37:55 PM
|
Submission request sent to Applicant
|
|
10/17/2019 5:37:00 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
10/17/2019 5:35:34 PM
|
Request for Review Comments email resent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
10/17/2019 3:46:22 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
10/16/2019 6:44:06 AM
|
Request for Review Comments returned by PCD Project Manager
|
|
10/11/2019 1:09:45 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
|
10/11/2019 9:20:59 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
|
10/10/2019 5:13:54 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
|
10/10/2019 8:34:03 AM
|
Request for Review Comments returned by Parks Advisory Board
|
|
10/10/2019 8:28:25 AM
|
Request for Review Comments returned by EPC Parks Department
|
|
9/26/2019 11:04:21 AM
|
Request for Review Comments returned by EPC Environmental Services
|
|
9/24/2019 2:45:15 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
9/24/2019 8:19:05 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
|
9/19/2019 1:34:33 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
|
9/19/2019 11:56:44 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Kristy Martinez on behalf of Fountain
|
|
9/19/2019 11:56:43 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
9/19/2019 11:56:42 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
|
9/19/2019 11:56:40 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
|
9/19/2019 11:56:38 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
|
|
9/19/2019 11:56:37 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
9/19/2019 11:56:35 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
|
9/19/2019 11:56:32 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
|
9/19/2019 11:56:29 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of Parks Advisory Board
|
|
9/19/2019 11:56:27 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of EPC Parks Department
|
|
9/19/2019 11:56:19 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of EPC Health Department
|
|
9/19/2019 11:56:17 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
|
9/19/2019 11:56:13 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
|
9/19/2019 11:56:11 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
9/19/2019 11:56:03 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
9/19/2019 11:54:32 AM
|
Submission Triaged
|
|
9/12/2019 8:36:13 PM
|
Submission received from Applicant
|
|
2/14/2019 11:31:59 AM
|
Request for Review Comments returned by Parks Advisory Board
|
|
1/23/2019 3:08:31 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
1/23/2019 3:06:18 PM
|
Request for Review Comments email resent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
1/23/2019 12:04:55 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
1/23/2019 12:03:59 PM
|
Request for Review Comments email resent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
1/17/2019 4:40:51 PM
|
Submission request sent to Applicant
|
|
1/17/2019 4:37:37 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
1/17/2019 4:28:40 PM
|
Request for Review Comments email resent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
1/16/2019 2:57:49 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
1/10/2019 4:20:38 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
|
1/10/2019 7:46:58 AM
|
Request for Review Comments returned by EPC Parks Department
|
|
1/9/2019 8:22:56 PM
|
Request for Review Comments returned by EPC Health Department
|
|
1/8/2019 2:29:31 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
1/7/2019 4:13:12 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
|
1/7/2019 9:12:50 AM
|
Request for Review Comments returned by Fountain
|
|
1/4/2019 1:14:04 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
|
1/4/2019 8:50:55 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
|
1/3/2019 11:17:00 AM
|
Request for Review Comments returned by EPC Environmental Services
|
|
12/26/2018 10:13:39 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
12/18/2018 11:17:05 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
|
12/17/2018 12:14:59 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
|
12/17/2018 8:14:49 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
|
12/15/2018 9:51:32 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Dennis Neal on behalf of Widefield SD 3
|
|
12/15/2018 9:51:31 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
|
12/15/2018 9:51:30 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Richard Davis on behalf of Security Water District
|
|
12/15/2018 9:51:29 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Jay Adriansen on behalf of Security Sanitation District
|
|
12/15/2018 9:51:28 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of Security Fire Protection District
|
|
12/15/2018 9:51:27 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Kristy Martinez on behalf of Fountain
|
|
12/15/2018 9:51:26 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
12/15/2018 9:51:25 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
|
12/15/2018 9:51:24 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
|
12/15/2018 9:51:24 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
|
12/15/2018 9:51:23 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
|
12/15/2018 9:51:21 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
|
|
12/15/2018 9:51:20 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
|
12/15/2018 9:51:20 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
12/15/2018 9:51:19 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
|
12/15/2018 9:51:17 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
|
12/15/2018 9:51:16 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Ross Williams on behalf of Parks Advisory Board
|
|
12/15/2018 9:51:15 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
|
12/15/2018 9:51:14 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of EPC Parks Department
|
|
12/15/2018 9:51:11 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by on behalf of EPC Health Department
|
|
12/15/2018 9:51:10 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
|
12/15/2018 9:51:09 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
|
12/15/2018 9:51:08 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
|
|
12/15/2018 9:51:08 AM
|
Request for Review Comments email sent for Project River Bend Residential, Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
12/15/2018 9:49:50 AM
|
Fees paid: 12/15/2018 (Receipt: 1001144)
|
|
12/12/2018 6:05:14 AM
|
Payment Request sent: 12/12/2018
|
|
12/12/2018 6:05:08 AM
|
File # Assigned: SP187
|
|
12/11/2018 3:41:28 PM
|
Submission Triaged
|
|
12/11/2018 1:54:04 PM
|
Submission received from Applicant
|
|
10/3/2018 3:24:59 PM
|
Submission request sent to Applicant
|
|
10/3/2018 3:24:53 PM
|
Submission Triaged
|
|
10/3/2018 2:11:00 PM
|
Submission received from Applicant
|
|
9/27/2018 7:54:04 AM
|
Submission request sent to Applicant
|
|
7/19/2018 11:40:50 AM
|
Submission request sent to Applicant
|
|
7/19/2018 11:36:52 AM
|
Project Manager Assigned: Nina Ruiz
|
|
7/19/2018 11:36:51 AM
|
EA Assigned: EA-17-086
|
|
7/19/2018 11:36:51 AM
|
Project Created
|