Project Details

Search


File Number
SP196
Project Name
Saddlehorn (824 Acres), Preliminary Plan
Description
Preliminary Plan
Parcels
4300000554 4300000554 4300000556 4300000556 4300000562 4300000562
Applicant
ROI Properties
Brady Williams ( brady@whitmirecapitaladvisors.com )
(360) 989-5395
Brady Williams ( brady@whitmirecapitaladvisors.com )
(360) 989-5395
EA Number
EA18215
File Prefix
SP - Preliminary Plan
Year
2019
Project Manager
Nina Ruiz
Status
Closed
Created
7/18/2018 4:11:48 PM

View: Review Comments


Approved Documents (12)

Link Document
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Grading & Erosion Control Plan (24 x 36)
View Storm Water Management Plan (SWMP)
View Drainage Report - Preliminary
View Traffic Impact Study
View 1_PBMP applicability form
View Curtis Road Deviation Request
View Deviation Request - Barrosito Length
View Deviation Request - Curtis Road
View Deviation Request - Judge Orr Road
View GEC Checklist
View SWMP Checklist


Additional Documents (17)

Link Document Comment
View Falcon FIre Protection District
View MLAA Comment-Email
View Airport Graphic
View Dave Elliott Letter
View Glide Scope Graphic
View Posting Photos Posted 2/16/2021
View Mailing Packet: Notice, Map and Labels Mailed 2/12/2021
View PC Staff Report
View PC Approval Letter
View BoCC Staff Report W/ Attachments Part 1
View BoCC Staff Report W/ Attachments Part 2
View PC Resolution
View BoCC Approval Letter
View BoCC Resolution 21-106
View Administrative Determination Includes Sub Attachments
View Correspondence - Diana K. May Miscellaneous Attachments
View CDPHE Approval Letter


Review Documents (49)

Link Document Date
View 1_PBMP applicability form 5/18/2020 12:56:38 PM
View 2_MS4 Exclusion Map 2/5/2020 2:24:48 PM
View 31102_Arapahoe_WQ_Table 12/2/2020 11:38:01 AM
View 31102_LFH_WQ_Table 12/2/2020 11:39:28 AM
View 31102_Water_Quality_Summary 12/2/2020 11:41:44 AM
View 4_Saddlehorn master utility report 2/5/2020 2:24:46 PM
View Acknowledgement of BDR by CDPHE 12/1/2020 2:16:12 PM
View BDR report 12/1/2020 1:35:26 PM
View CDPHE Acknowledgement 2/8/2021 5:27:09 PM
View Comment letter and responses 6/9/2020 11:05:12 AM
View Comment Response MDDP PDR 2/5/2020 2:28:47 PM
View Curtis Road Deviation Request 12/4/2019 9:19:47 AM
View Deviation Request 12/18/2019 1:29:16 PM
View Deviation Request - Barrosito Length 9/28/2020 12:46:50 PM
View Deviation Request - Curtis Road 5/18/2020 1:00:54 PM
View Deviation Request - Judge Orr 9/28/2020 12:46:48 PM
View Deviation Request - Judge Orr Road 5/18/2020 1:00:55 PM
View Deviation Request_07.08.19 12/18/2019 1:34:00 PM
View Final Utility Report 4/30/2019 1:02:05 PM
View GEC Checklist 12/2/2020 7:02:40 AM
View JR redline responses to GEC, SWMP, ESQCP, PBMP and Judge Orr Deviation 5/18/2020 1:06:02 PM
View Judge Orr Road Deviation Request 12/4/2019 9:19:46 AM
View Limited Power of Attorney 8/12/2019 8:57:15 AM
View Master Utility Report 9/18/2019 4:30:43 PM
View MDDP and PDR comments and resonses 5/18/2020 12:56:38 PM
View MS4 form G 4/24/2019 3:22:24 PM
View MS4 form H 4/24/2019 3:22:25 PM
View MS4 form I 4/24/2019 3:22:25 PM
View On site wastewater study addendum 7/23/2019 1:24:42 PM
View response review letter comments 7/24/2019 4:19:56 PM
View responses to prelim plan redlines and loi 7/27/2020 11:10:20 AM
View Right of Entry 4/24/2019 3:22:26 PM
View Saddlehorn Master Utility Report 7/22/2019 5:00:05 PM
View Saddlehorn Ranch Noise Study 5/6/2020 9:42:28 AM
View Saddlehorn Ranch Permanent Will Serve Letter 2/10/2021 10:56:02 AM
View Saddlehorn Ranch Potable Water Demand Analysis 7/16/2019 2:52:53 PM
View saddlehorn ranch roadway geometry plan 7/27/2020 11:11:42 AM
View Saddlehorn Ranch Will Serve letter_water 12/1/2020 11:34:13 AM
View Saddlehorn Transfer Covenant Final Version 11/2/2020 10:32:33 AM
View soil, geology, geologic hazard and wastewater study 5/6/2020 9:40:29 AM
View SRMD_TMF_Cover_Letter 10/6/2020 5:37:42 PM
View SRMD_TMF_Report 4/15/2021 5:21:13 PM
View Subdivision Improvements Agreement 4/24/2019 11:07:31 AM
View SWMP Checklist 5/18/2020 1:00:56 PM
View SWMP Checklist 12/2/2020 7:02:40 AM
View TMF Submission Form 10/7/2020 3:18:30 PM
View USFWS letter 4/25/2019 9:22:05 AM
View well construction for permit no. 66937-F 12/1/2020 11:30:54 AM
View well construction for permit no. 66938-F 12/1/2020 11:32:12 AM



Events (252)

Date Comment
5/13/2022 10:42:36 AM Project Closed
5/13/2022 10:42:36 AM Project Approved: 5/13/2022
4/19/2021 7:47:14 PM Submission Triaged
4/15/2021 5:21:21 PM Submission received from Applicant
4/15/2021 5:18:22 PM Submission request sent to Applicant
3/2/2021 12:12:15 PM Request for Review Comments returned by EPC County Attorney's Office
2/18/2021 9:18:49 AM Request for Review Comments returned by PCD Project Manager
2/17/2021 2:21:03 PM Request for Review Comments returned by PCD Engineering Division
2/10/2021 9:00:09 PM Submission Triaged
2/10/2021 8:44:08 PM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
2/10/2021 10:56:22 AM Submission received from Applicant
2/10/2021 10:25:18 AM Request for Review Comments returned by EPC County Attorney's Office
2/10/2021 10:11:56 AM Submission request sent to Applicant
2/8/2021 8:54:54 PM Submission Triaged
2/8/2021 5:27:19 PM Submission received from Applicant
2/8/2021 4:37:02 PM Submission request sent to Applicant
2/8/2021 9:44:22 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
2/4/2021 10:27:12 AM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
2/3/2021 9:05:37 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
1/27/2021 9:21:00 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
1/27/2021 9:20:52 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/27/2021 9:17:29 PM Submission Triaged
1/27/2021 2:58:16 PM Submission received from Applicant
1/14/2021 10:31:12 AM Submission request sent to Applicant
1/11/2021 4:45:38 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
1/6/2021 1:54:50 PM Request for Review Comments returned by EPC County Attorney's Office
12/29/2020 8:47:48 PM Request for Review Comments returned by EPC Health Department
12/28/2020 3:57:16 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
12/22/2020 2:43:09 PM Request for Review Comments returned by PCD Engineering Division
12/22/2020 1:55:53 PM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/22/2020 8:50:11 AM Request for Review Comments returned by PCD Engineering Division
12/20/2020 1:27:35 PM Request for Review Comments returned by PCD Project Manager
12/14/2020 4:59:03 PM Request for Review Comments returned by Colorado Geological Survey
12/11/2020 3:39:41 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
12/7/2020 2:20:13 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
12/7/2020 2:20:11 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
12/7/2020 2:20:03 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/7/2020 2:15:31 PM Submission Triaged
12/7/2020 10:17:56 AM Submission received from Applicant
12/4/2020 2:52:39 PM Submission request sent to Applicant
12/4/2020 2:52:12 PM Submission Triaged
12/4/2020 11:08:27 AM Submission received from Applicant
12/1/2020 5:31:15 AM Submission request sent to Applicant
11/30/2020 3:56:18 PM Request for Review Comments returned by EPC County Attorney's Office
11/29/2020 4:13:01 PM Request for Review Comments returned by PCD Project Manager
11/28/2020 1:36:31 PM Submission request sent to Applicant
11/28/2020 7:52:46 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
11/25/2020 5:04:41 PM Request for Review Comments returned by PCD Engineering Division
11/25/2020 5:41:12 AM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
11/24/2020 4:12:05 PM Request for Review Comments returned by Meadow Lake Airport Association
11/23/2020 4:51:30 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
11/19/2020 8:55:35 AM Request for Review Comments returned by Colorado Division of Water Resources
11/5/2020 11:49:01 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
11/4/2020 9:38:26 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
11/4/2020 9:38:20 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
11/4/2020 9:38:17 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
11/4/2020 9:38:13 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by on behalf of EPC Health Department
11/4/2020 9:38:07 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
11/4/2020 9:38:05 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
11/4/2020 9:37:57 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/4/2020 9:31:22 PM Submission Triaged
11/3/2020 4:25:05 PM Submission received from Applicant
8/28/2020 5:57:23 AM Submission request sent to Applicant
8/26/2020 7:26:21 AM Request for Review Comments returned by PCD Project Manager
8/21/2020 6:08:26 PM Request for Review Comments returned by PCD Engineering Division
7/27/2020 5:06:03 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
7/27/2020 5:05:59 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/27/2020 5:02:43 PM Submission Triaged
7/27/2020 11:15:21 AM Submission received from Applicant
7/10/2020 7:45:38 AM Submission request sent to Applicant
7/10/2020 7:44:46 AM Request for Review Comments returned by PCD Project Manager
7/10/2020 7:38:21 AM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
7/8/2020 2:41:51 PM Request for Review Comments returned by PCD Engineering Division
7/8/2020 5:12:40 AM Request for Review Comments returned by PCD Project Manager
6/30/2020 10:54:47 AM Request for Review Comments returned by EPC County Attorney's Office
6/10/2020 8:47:23 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
6/9/2020 8:28:14 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
6/9/2020 8:28:12 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by on behalf of EPC Health Department
6/9/2020 8:28:10 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
6/9/2020 8:28:09 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
6/9/2020 8:28:06 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/9/2020 8:25:31 PM Submission Triaged
6/9/2020 11:12:02 AM Submission received from Applicant
4/21/2020 4:23:04 PM Request for Review Comments returned by EPC Health Department
4/15/2020 3:37:49 PM Submission request sent to Applicant
4/15/2020 8:38:18 AM Request for Review Comments returned by EPC County Attorney's Office
4/13/2020 10:01:21 PM Request for Review Comments returned by PCD Engineering Division
4/11/2020 6:54:47 AM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/10/2020 1:07:43 PM Request for Review Comments returned by PCD Engineering Division
4/8/2020 1:45:03 PM Request for Review Comments returned by PCD Project Manager
4/1/2020 12:19:59 PM Request for Review Comments returned by Falcon Fire Protection District
4/1/2020 9:43:36 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
3/18/2020 5:05:02 PM Request for Review Comments email resent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
3/18/2020 1:59:41 PM Request for Review Comments returned by Colorado Division of Water Resources
3/17/2020 1:00:42 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
3/12/2020 12:30:34 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
3/12/2020 12:30:33 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
3/12/2020 12:30:31 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
3/12/2020 12:30:30 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
3/12/2020 12:30:27 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by on behalf of EPC Health Department
3/12/2020 12:30:26 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
3/12/2020 12:30:25 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
3/12/2020 12:30:23 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/12/2020 12:23:19 PM Submission Triaged
3/11/2020 5:00:13 PM Submission received from Applicant
2/3/2020 3:43:57 PM Submission request sent to Applicant
1/27/2020 7:51:52 AM Submission request sent to Applicant
1/15/2020 10:51:42 AM Request for Review Comments returned by EPC County Attorney's Office
1/10/2020 12:13:58 PM Request for Review Comments returned by PCD Engineering Division
1/9/2020 6:59:29 AM Request for Review Comments returned by PCD Project Manager
12/19/2019 6:25:54 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
12/19/2019 6:25:51 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/19/2019 6:24:11 AM Submission Triaged
12/18/2019 1:39:44 PM Submission received from Applicant
12/18/2019 1:00:02 PM Submission request sent to Applicant
12/6/2019 7:04:21 PM Request for Review Comments returned by EPC Health Department
12/3/2019 5:29:04 PM Submission request sent to Applicant
10/26/2019 6:15:38 AM Submission request sent to Applicant
10/24/2019 3:14:39 PM Request for Review Comments returned by PCD Engineering Division
10/15/2019 3:37:08 PM Request for Review Comments returned by PCD Project Manager
10/9/2019 8:46:39 AM Request for Review Comments returned by Colorado Division of Water Resources
10/8/2019 10:54:42 AM Request for Review Comments returned by EPC Environmental Services
10/4/2019 2:54:49 PM Request for Review Comments returned by Pikes Peak Regional Building Department
10/4/2019 10:19:10 AM Request for Review Comments returned by Colorado Geological Survey
10/1/2019 2:15:35 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
9/24/2019 11:00:39 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/22/2019 12:00:17 PM Request for Review Comments returned by EPC Parks Department
9/22/2019 11:58:53 AM Request for Review Comments returned by Parks Advisory Board
9/19/2019 2:19:35 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
9/19/2019 12:28:16 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
9/19/2019 12:28:13 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
9/19/2019 12:28:09 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/19/2019 12:28:05 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
9/19/2019 12:27:58 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
9/19/2019 12:27:54 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
9/19/2019 12:27:47 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
9/19/2019 12:27:44 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by on behalf of Parks Advisory Board
9/19/2019 12:27:40 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by on behalf of EPC Parks Department
9/19/2019 12:27:25 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by on behalf of EPC Health Department
9/19/2019 12:27:22 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
9/19/2019 12:27:18 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
9/19/2019 12:27:08 PM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/19/2019 12:20:41 PM Submission Triaged
9/19/2019 12:15:15 PM Submission received from Applicant
9/19/2019 12:08:06 PM Submission request sent to Applicant
9/19/2019 12:07:48 PM Submission Triaged
9/19/2019 11:29:09 AM Submission received from Applicant
8/7/2019 4:35:39 PM Submission request sent to Applicant
8/1/2019 7:56:29 AM Submission request sent to Applicant
7/29/2019 2:07:52 PM Submission request sent to Applicant
7/29/2019 2:06:58 PM Submission Triaged
7/25/2019 1:07:29 PM Submission received from Applicant
7/25/2019 12:12:50 PM Submission request sent to Applicant
7/25/2019 12:12:24 PM Submission Triaged
7/24/2019 4:21:35 PM Submission received from Applicant
7/9/2019 9:20:51 AM Submission request sent to Applicant
6/24/2019 4:23:50 PM Request for Review Comments returned by EPC Health Department
6/17/2019 5:14:13 PM Submission request sent to Applicant
6/17/2019 5:06:31 PM Submission request sent to Applicant
6/17/2019 4:15:55 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/14/2019 6:03:28 PM Request for Review Comments returned by PCD Engineering Division
6/13/2019 4:40:38 PM Request for Review Comments returned by Parks Advisory Board
6/5/2019 12:53:30 PM Request for Review Comments returned by EPC Parks Department
6/4/2019 5:00:32 PM Request for Review Comments returned by Colorado Geological Survey
6/3/2019 9:13:56 AM Request for Review Comments returned by Pikes Peak Regional Building Department
6/1/2019 11:26:24 AM Request for Review Comments returned by PCD Project Manager
6/1/2019 9:52:30 AM Request for Review Comments email sent for Project Saddlehorn (824 Acres), Preliminary Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/31/2019 2:48:18 PM Request for Review Comments returned by Falcon Fire Protection District
5/30/2019 2:16:28 PM Request for Review Comments returned by Colorado Division of Water Resources
5/30/2019 8:37:31 AM Request for Review Comments returned by El Paso County Conservation Dist
5/29/2019 9:59:16 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
5/29/2019 4:32:18 AM Request for Review Comments email resent for Project 824 Acres, Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
5/23/2019 12:57:42 PM Request for Review Comments returned by EPC Environmental Services
5/16/2019 10:02:00 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
5/16/2019 10:01:13 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
5/15/2019 3:22:20 PM Request for Review Comments returned by Central CO Conservation District
5/15/2019 3:21:42 PM Request for Review Comments returned by Central CO Conservation District
5/15/2019 8:36:05 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/15/2019 8:35:19 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/15/2019 7:58:26 AM Request for Review Comments returned by Schriever AFB
5/15/2019 7:56:40 AM Request for Review Comments returned by Schriever AFB
5/14/2019 4:15:12 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Darren Horstmeier on behalf of Schriever AFB
5/14/2019 4:15:10 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
5/14/2019 4:15:07 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
5/14/2019 4:15:05 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Melissa Andrews on behalf of Falcon School District 49
5/14/2019 4:15:03 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
5/14/2019 4:15:01 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Pamela Davison on behalf of El Paso County Conservation Dist
5/14/2019 4:15:00 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Darren Horstmeier on behalf of Schriever AFB
5/14/2019 4:14:57 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Pamela Davidson on behalf of Central CO Conservation District
5/14/2019 4:14:57 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
5/14/2019 4:14:55 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
5/14/2019 4:14:55 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
5/14/2019 4:14:53 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
5/14/2019 4:14:53 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Melissa Andrews on behalf of Falcon School District 49
5/14/2019 4:14:50 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
5/14/2019 4:14:50 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
5/14/2019 4:14:48 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Pamela Davison on behalf of El Paso County Conservation Dist
5/14/2019 4:14:48 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
5/14/2019 4:14:46 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Steve Phillips on behalf of Federal Aviation Administration (FAA)
5/14/2019 4:14:46 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Pamela Davidson on behalf of Central CO Conservation District
5/14/2019 4:14:44 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
5/14/2019 4:14:44 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
5/14/2019 4:14:41 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
5/14/2019 4:14:41 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
5/14/2019 4:14:39 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
5/14/2019 4:14:39 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
5/14/2019 4:14:37 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
5/14/2019 4:14:37 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
5/14/2019 4:14:35 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Steve Phillips on behalf of Federal Aviation Administration (FAA)
5/14/2019 4:14:33 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
5/14/2019 4:14:33 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
5/14/2019 4:14:30 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
5/14/2019 4:14:30 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by on behalf of Parks Advisory Board
5/14/2019 4:14:28 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
5/14/2019 4:14:28 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
5/14/2019 4:14:26 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
5/14/2019 4:14:26 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
5/14/2019 4:14:23 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by on behalf of EPC Parks Department
5/14/2019 4:14:21 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
5/14/2019 4:14:19 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by on behalf of Parks Advisory Board
5/14/2019 4:14:17 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
5/14/2019 4:14:17 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by on behalf of EPC Health Department
5/14/2019 4:14:14 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
5/14/2019 4:14:14 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
5/14/2019 4:14:12 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by on behalf of EPC Parks Department
5/14/2019 4:14:12 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
5/14/2019 4:14:10 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
5/14/2019 4:14:07 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/14/2019 4:14:05 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by on behalf of EPC Health Department
5/14/2019 4:14:03 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
5/14/2019 4:14:01 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
5/14/2019 4:13:59 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Nina Ruiz on behalf of PCD Project Manager
5/14/2019 4:13:57 PM Request for Review Comments email sent for Project 824 Acres, Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/14/2019 4:04:11 PM Fees paid: 5/14/2019 (Receipt: 1001448)
5/7/2019 3:24:31 PM Payment Request sent: 5/7/2019
5/7/2019 3:23:50 PM File # Assigned: SP196
5/7/2019 1:59:38 PM Submission Triaged
5/7/2019 11:07:37 AM Submission received from Applicant
5/6/2019 4:20:27 PM Submission request sent to Applicant
5/6/2019 4:19:50 PM Submission Triaged
5/6/2019 4:01:08 PM Submission received from Applicant
5/6/2019 3:56:49 PM Submission request sent to Applicant
5/6/2019 3:56:09 PM Submission Triaged
5/6/2019 3:28:19 PM Submission received from Applicant
5/6/2019 11:06:43 AM Submission request sent to Applicant
5/6/2019 11:06:08 AM Submission Triaged
4/30/2019 5:26:12 PM Submission received from Applicant
1/28/2019 9:51:57 AM Submission request sent to Applicant
7/18/2018 4:22:14 PM Submission request sent to Applicant
7/18/2018 4:12:10 PM Project Manager Assigned: Nina Ruiz
7/18/2018 4:12:10 PM EA Assigned: EA18215
7/18/2018 4:12:10 PM Project Created