Project Details

Search


File Number
SP193
Project Name
Windermere Preliminary Plan
Description
Preliminary plan proposed to create 203 single-family detached residential lots, public rights-of-way, and tracts for open space, park, drainage, and utilities.
Parcels
5326400016 5326400016 5329100004 5329100004 5329111002 5329111002 5329400013 5329400013
Applicant
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
EA Number
EA18200
File Prefix
SP - Preliminary Plan
Year
2019
Project Manager
Kari Parsons
Status
Closed
Created
6/26/2018 1:15:22 PM

View: Review Comments


Approved Documents (15)

Link Document
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Grading & Erosion Control checklist
View MS4 Post Construction Form
View PBMP Applicability Form
View SWMP checklist
View Grading & Erosion Control Plan (24 x 36)
View Storm Water Management Plan (SWMP)
View Drainage Report - Preliminary
View Traffic Impact Study
View CDs Utilities
View ESQCP
View Financial Assurance Forms
View MS4 Post Construction Form for South Pond
View SDI worksheet - North pond
View SDI worksheet - South pond


Additional Documents (15)

Link Document Comment
View Preliminary Plan checklist
View Mailing Packet: Notice, Map and Labels Mailed 2/12/2021
View Posting Photos Posted 2/16/2021
View PC Staff Report
View Trowbridge Comments- Parsons Response
View Email Comments Trowbridge comments_Ruiz response
View Neighbor Comment
View PC APPROVAL LETTER
View REVISED PRELIM PLAN
View Returned Mail
View BoCC Staff Report W/ Attachments
View PC Resolution
View BoCC Approval Letter
View BoCC Resolution 21-105
View Email Correspondence


Review Documents (44)

Link Document Date
View Application/Petition Form 2/23/2021 9:55:15 AM
View Legal Description (MS WORD Version required) 2/23/2021 9:55:16 AM
View Letter of Intent 2/23/2021 9:55:17 AM
View Title Commitment (Current within 30 days of submittal) 7/1/2020 1:20:18 PM
View Vicinity/Location Map 2/22/2019 7:30:43 AM
View Applicant Comment Response Letter 11/10/2020 2:28:34 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 2/22/2019 10:12:43 AM
View Grading & Erosion Control checklist 3/11/2021 2:11:27 PM
View MS4 Post Construction Form 2/22/2019 7:30:49 AM
View PBMP Applicability Form 2/23/2021 10:58:34 AM
View SWMP checklist 1/15/2021 11:20:44 AM
View Grading & Erosion Control Plan (24 x 36) 6/15/2021 12:14:46 PM
View Landscape Plan drawings 3/11/2021 2:11:27 PM
View Predevelopment (Early) Grading Request 11/10/2020 2:28:34 PM
View Preliminary Plan Drawings (24" x 36") 3/19/2021 2:21:00 PM
View Storm Water Management Plan (SWMP) 1/15/2021 11:20:43 AM
View Drainage Report - Preliminary 3/23/2021 4:01:47 PM
View Soils & Geology Report 1/20/2021 7:10:40 AM
View Subdivision Summary Sheet 2/10/2021 7:49:39 AM
View Traffic Impact Study 1/15/2021 11:20:41 AM
View Wastewater Disposal Report 2/4/2021 4:56:04 PM
View Water Resources Report 2/10/2021 7:34:06 AM
View Water Supply Information Summary 2/23/2021 10:41:37 AM
View Adjoining property owner letter 6/18/2020 2:19:57 PM
View Application form 1/15/2021 11:20:45 AM
View CDs Utilities 8/24/2021 2:19:41 PM
View Comment response letter 1/20/2021 7:41:25 AM
View Commitment letter from waste water service provider 2/23/2021 4:35:41 PM
View Commitment letter from water service provider 2/23/2021 4:35:40 PM
View ESQCP 11/10/2020 2:28:38 PM
View FAE 3/23/2021 4:01:49 PM
View Financial Assurance Estimate 2/23/2021 12:36:29 PM
View Financial Assurance Forms 11/10/2020 2:28:14 PM
View Impact Identification Statement 2/22/2019 7:30:36 AM
View MS4 Post Construction Form for South Pond 11/10/2020 2:28:35 PM
View Noise Study 11/10/2020 2:28:18 PM
View Proof of embankment/pond submittal to State engineer 11/10/2020 2:28:37 PM
View Response letter 6/18/2020 2:22:08 PM
View RMG response letter 1/20/2021 7:10:42 AM
View SDI worksheet - North pond 11/10/2020 2:28:36 PM
View SDI worksheet - South pond 11/10/2020 2:28:37 PM
View Storage approval letter 11/10/2020 2:28:40 PM
View Stormwater management plan 6/18/2020 2:22:09 PM
View Traffic comment response 6/18/2020 2:22:10 PM



Events (310)

Date Comment
8/25/2021 1:23:59 PM Project Closed
8/25/2021 1:23:59 PM Project Approved: 8/25/2021
8/25/2021 1:23:39 PM Project Ready for Approval requests. Review Comment period is complete.
8/25/2021 12:47:43 PM Request for Review Comments returned by PCD Engineering Division
8/24/2021 2:32:08 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/24/2021 2:31:07 PM Submission Triaged
8/24/2021 2:19:50 PM Submission received from Applicant
8/24/2021 2:12:29 PM Submission request sent to Applicant
8/3/2021 11:20:47 AM Request for Review Comments returned by PCD Engineering Division
7/28/2021 12:32:35 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/28/2021 12:31:36 PM Submission Triaged
7/28/2021 12:21:14 PM Submission received from Applicant
7/28/2021 9:19:57 AM Request for Review Comments returned by PCD Project Manager
7/28/2021 9:19:20 AM Submission request sent to Applicant
7/28/2021 8:53:48 AM Request for Review Comments returned by PCD Engineering Division
7/16/2021 11:17:47 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
7/16/2021 11:17:45 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/16/2021 11:16:02 AM Submission Triaged
7/16/2021 10:58:14 AM Submission received from Applicant
7/9/2021 3:01:18 PM Request for Review Comments returned by Cherokee Metro Dist
7/7/2021 2:51:50 PM Submission request sent to Applicant
7/7/2021 2:14:58 PM Request for Review Comments returned by PCD Engineering Division
6/30/2021 2:36:49 PM Request for Review Comments returned by Colorado Springs Public Works
6/30/2021 10:20:30 AM Request for Review Comments returned by EPC Stormwater Review
6/25/2021 11:53:47 AM Request for Review Comments returned by PCD Project Manager
6/25/2021 11:52:12 AM Request for Review Comments email resent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
6/25/2021 11:51:01 AM Request for Review Comments returned by PCD Project Manager
6/23/2021 10:05:30 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/17/2021 8:57:21 AM Request for Review Comments returned by Colorado Springs Planning & Community Development
6/15/2021 12:28:38 PM Fees paid: 6/15/2021 (Receipt: 1004577)
6/15/2021 12:23:31 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/15/2021 12:23:25 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
6/15/2021 12:23:14 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
6/15/2021 12:23:11 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Jeff Munger on behalf of Cherokee Metro Dist
6/15/2021 12:23:07 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/15/2021 12:23:04 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
6/15/2021 12:23:00 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/15/2021 12:20:18 PM Payment Request sent: 6/15/2021
6/15/2021 12:18:47 PM Submission Triaged
6/15/2021 12:14:58 PM Submission received from Applicant
6/15/2021 12:11:41 PM Submission request sent to Applicant
6/3/2021 9:27:43 AM Submission request sent to Applicant
6/3/2021 9:27:15 AM Project reopened for Review Comments
4/14/2021 12:17:04 PM Project Ready for Approval requests. Review Comment period is complete.
4/2/2021 3:55:49 PM Request for Review Comments returned by PCD Engineering Division
3/25/2021 7:24:47 AM Request for Review Comments returned by PCD Project Manager
3/23/2021 4:04:50 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
3/23/2021 4:04:46 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/23/2021 4:04:05 PM Submission Triaged
3/23/2021 4:01:58 PM Submission received from Applicant
3/23/2021 7:24:12 AM Submission request sent to Applicant
3/22/2021 5:03:25 PM Request for Review Comments returned by PCD Engineering Division
3/19/2021 2:45:22 PM Submission Triaged
3/19/2021 2:33:40 PM Submission received from Applicant
3/19/2021 11:48:55 AM Request for Review Comments returned by PCD Project Manager
3/19/2021 11:34:46 AM Submission request sent to Applicant
3/11/2021 4:18:23 PM Submission Triaged
3/11/2021 2:16:22 PM Submission received from Applicant
3/11/2021 7:08:12 AM Submission request sent to Applicant
3/9/2021 9:36:33 AM Submission Triaged
3/9/2021 8:11:52 AM Submission received from Applicant
3/9/2021 7:45:16 AM Submission request sent to Applicant
3/9/2021 7:05:53 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
3/9/2021 7:05:50 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/9/2021 7:04:47 AM Submission Triaged
3/8/2021 2:05:09 PM Submission received from Applicant
2/26/2021 8:26:49 AM Request for Review Comments returned by EPC County Attorney's Office
2/23/2021 4:39:10 PM Submission request sent to Applicant
2/23/2021 4:38:46 PM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
2/23/2021 4:37:53 PM Submission Triaged
2/23/2021 4:35:49 PM Submission received from Applicant
2/23/2021 9:50:30 AM Submission request sent to Applicant
2/23/2021 8:22:08 AM Submission request sent to Applicant
2/22/2021 12:29:00 PM Request for Review Comments returned by EPC County Attorney's Office
2/17/2021 3:26:18 PM Request for Review Comments returned by Cherokee Metro Dist
2/17/2021 11:33:24 AM Submission request sent to Applicant
2/15/2021 10:46:02 AM Request for Review Comments returned by Colorado Geological Survey
2/12/2021 1:35:13 PM Request for Review Comments returned by Colorado Division of Water Resources
2/11/2021 5:08:37 PM Submission request sent to Applicant
2/11/2021 10:39:47 AM Submission request sent to Applicant
2/10/2021 7:20:30 PM Request for Review Comments returned by PCD Engineering Division
2/10/2021 11:56:53 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
2/10/2021 11:56:49 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
2/10/2021 11:55:43 AM Submission Triaged
2/10/2021 10:16:45 AM Submission received from Applicant
2/10/2021 7:17:24 AM Submission request sent to Applicant
2/9/2021 8:36:03 PM Request for Review Comments returned by EPC Stormwater Review
2/9/2021 4:43:17 PM Submission request sent to Applicant
2/9/2021 1:37:52 PM Submission request canceled
2/9/2021 12:12:42 PM Submission request sent to Applicant
2/5/2021 2:39:00 PM Submission Triaged
2/5/2021 2:09:45 PM Submission received from Applicant
2/5/2021 12:54:55 PM Submission request sent to Applicant
2/5/2021 12:53:49 PM Submission request sent to Applicant
2/4/2021 5:27:22 PM Submission Triaged
2/4/2021 4:56:17 PM Submission received from Applicant
2/4/2021 1:56:55 PM Submission request sent to Applicant
2/4/2021 8:49:17 AM Request for Review Comments returned by Colorado Springs Public Works
2/4/2021 8:12:14 AM Submission request sent to Applicant
2/4/2021 8:11:26 AM Request for Review Comments returned by PCD Project Manager
2/4/2021 7:43:15 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
2/4/2021 7:41:45 AM Submission request canceled
2/3/2021 10:50:53 AM Submission request sent to Applicant
2/3/2021 10:36:24 AM Submission request sent to Applicant
2/3/2021 10:17:37 AM Submission Triaged
2/3/2021 10:14:19 AM Submission received from Applicant
2/3/2021 10:06:38 AM Submission request sent to Applicant
1/20/2021 9:28:23 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Jeff Munger on behalf of Cherokee Metro Dist
1/20/2021 9:26:39 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
1/20/2021 9:26:33 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
1/20/2021 9:26:27 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
1/20/2021 9:10:02 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
1/20/2021 9:10:00 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
1/20/2021 9:09:56 AM Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/20/2021 8:56:52 AM Submission Triaged
1/20/2021 7:55:45 AM Submission received from Applicant
1/9/2021 2:01:09 PM Request for Review Comments returned by EPC Health Department
12/31/2020 9:04:57 AM Request for Review Comments returned by Colorado Springs Public Works
12/28/2020 9:46:41 AM Request for Review Comments returned by Colorado Division of Water Resources
12/10/2020 8:28:38 AM Submission request sent to Applicant
12/10/2020 8:27:04 AM Submission request sent to Applicant
12/10/2020 8:25:12 AM Request for Review Comments returned by PCD Project Manager
12/9/2020 4:52:26 PM Request for Review Comments returned by PCD Engineering Division
12/8/2020 12:47:45 PM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
12/8/2020 9:37:54 AM Request for Review Comments returned by Colorado Parks and Wildlife
12/4/2020 4:44:57 PM Request for Review Comments returned by EPC Parks Department
12/4/2020 4:42:30 PM Request for Review Comments returned by Parks Advisory Board
12/1/2020 6:15:13 PM Request for Review Comments returned by Colorado Geological Survey
12/1/2020 10:47:39 AM Request for Review Comments returned by Pikes Peak Regional Building Department
11/30/2020 5:02:22 PM Request for Review Comments returned by EPC Stormwater Review
11/18/2020 11:15:39 PM Request for Review Comments returned by County Attorney - Development Review
11/18/2020 8:55:34 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
11/13/2020 1:39:02 PM Request for Review Comments returned by EPC County Attorney's Office
11/12/2020 4:47:52 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
11/12/2020 3:44:21 PM Request for Review Comments returned by Falcon Fire Protection District
11/12/2020 2:07:03 PM Request for Review Comments returned by EPC Environmental Services
11/12/2020 9:48:43 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/10/2020 2:54:01 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Josh Braunschweig on behalf of Mountain View Electric Association, Inc.
11/10/2020 2:53:59 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Christoph Zurcher on behalf of Mountain Metro Transit (City of COS)
11/10/2020 2:53:57 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
11/10/2020 2:53:55 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Melissa Andrews on behalf of Falcon 49
11/10/2020 2:53:52 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/10/2020 2:53:48 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Terry Johns on behalf of Colorado Springs SD 11
11/10/2020 2:53:36 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Shirley Applegate on behalf of Colorado Springs Public Works
11/10/2020 2:53:30 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
11/10/2020 2:53:28 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
11/10/2020 2:53:26 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Water & Wastewater Collections Manager Jonathon Smith on behalf of Cherokee Metro Dist
11/10/2020 2:53:24 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Autumn Mason on behalf of Central Marksheffel Metro
11/10/2020 2:53:22 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joe Valdez on behalf of Black Hills Energy-Aquila
11/10/2020 2:53:19 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
11/10/2020 2:53:17 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
11/10/2020 2:53:13 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
11/10/2020 2:53:10 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
11/10/2020 2:53:06 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Colorado Geological Survey on behalf of Colorado Geological Survey
11/10/2020 2:53:00 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joanna Williams on behalf of Colorado Division of Water Resources
11/10/2020 2:52:58 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
11/10/2020 2:52:54 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
11/10/2020 2:52:52 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
11/10/2020 2:52:50 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Parks Department
11/10/2020 2:52:41 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Health Department
11/10/2020 2:52:35 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kathy Andrew on behalf of EPC Environmental Services
11/10/2020 2:52:31 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Edi Anderson on behalf of EPC County Attorney's Office
11/10/2020 2:52:29 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Lori Seago on behalf of County Attorney - Development Review
11/10/2020 2:52:27 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kari Parsons on behalf of PCD Project Manager
11/10/2020 2:52:23 PM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/10/2020 2:50:25 PM Submission Triaged
11/10/2020 2:42:24 PM Submission received from Applicant
11/10/2020 2:36:22 PM Submission request sent to Applicant
11/10/2020 2:34:55 PM Submission Triaged
11/10/2020 2:30:46 PM Submission received from Applicant
11/10/2020 12:24:44 PM Submission request sent to Applicant
10/30/2020 7:32:36 AM Submission request sent to Applicant
8/20/2020 5:29:11 PM Submission request sent to Applicant
8/20/2020 5:27:38 PM Request for Review Comments returned by PCD Project Manager
8/19/2020 8:48:25 AM Request for Review Comments returned by Colorado Parks and Wildlife
8/17/2020 10:11:31 PM Request for Review Comments returned by PCD Engineering Division
8/13/2020 3:11:06 PM Request for Review Comments returned by Parks Advisory Board
8/3/2020 7:50:27 AM Request for Review Comments returned by EPC Stormwater Review
7/31/2020 11:47:55 AM Request for Review Comments returned by Colorado Springs Public Works
7/31/2020 10:05:26 AM Request for Review Comments returned by EPC Stormwater Review
7/29/2020 9:24:49 AM Request for Review Comments returned by Pikes Peak Regional Building Department
7/29/2020 9:21:51 AM Request for Review Comments returned by Pikes Peak Regional Building Department
7/28/2020 4:43:38 PM Request for Review Comments returned by Colorado Geological Survey
7/28/2020 4:40:21 PM Request for Review Comments returned by Colorado Geological Survey
7/28/2020 9:34:18 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
7/24/2020 7:58:38 AM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
7/23/2020 4:39:54 PM Request for Review Comments returned by EPC Parks Department
7/23/2020 4:38:57 PM Request for Review Comments returned by EPC Parks Department
7/17/2020 11:06:24 AM Request for Review Comments returned by EPC Environmental Services
7/17/2020 11:05:39 AM Request for Review Comments returned by EPC Environmental Services
7/14/2020 10:43:13 AM Request for Review Comments returned by Falcon Fire Protection District
7/13/2020 8:04:30 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/12/2020 5:27:03 PM Request for Review Comments returned by County Attorney - Development Review
7/12/2020 5:24:00 PM Request for Review Comments returned by County Attorney - Development Review
7/10/2020 2:57:02 PM Request for Review Comments returned by EPC County Attorney's Office
7/10/2020 2:56:04 PM Request for Review Comments returned by EPC County Attorney's Office
7/9/2020 11:50:33 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
7/9/2020 11:50:03 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
7/9/2020 9:38:16 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Josh Braunschweig on behalf of Mountain View Electric Association, Inc.
7/9/2020 9:38:15 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Christoph Zurcher on behalf of Mountain Metro Transit (City of COS)
7/9/2020 9:38:14 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
7/9/2020 9:38:13 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Melissa Andrews on behalf of Falcon 49
7/9/2020 9:38:12 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Autumn Mason on behalf of Central Marksheffel Metro
7/9/2020 9:38:11 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/9/2020 9:38:11 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joe Valdez on behalf of Black Hills Energy-Aquila
7/9/2020 9:38:10 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Terry Johns on behalf of Colorado Springs SD 11
7/9/2020 9:38:09 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
7/9/2020 9:38:09 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Shirley Applegate on behalf of Colorado Springs Public Works
7/9/2020 9:38:08 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
7/9/2020 9:38:06 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
7/9/2020 9:38:06 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
7/9/2020 9:38:05 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
7/9/2020 9:38:05 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
7/9/2020 9:38:04 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Water & Wastewater Collections Manager Jonathon Smith on behalf of Cherokee Metro Dist
7/9/2020 9:38:04 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Colorado Geological Survey on behalf of Colorado Geological Survey
7/9/2020 9:38:03 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Autumn Mason on behalf of Central Marksheffel Metro
7/9/2020 9:38:02 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joe Valdez on behalf of Black Hills Energy-Aquila
7/9/2020 9:38:02 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joanna Williams on behalf of Colorado Division of Water Resources
7/9/2020 9:38:01 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
7/9/2020 9:38:01 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
7/9/2020 9:38:00 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
7/9/2020 9:38:00 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
7/9/2020 9:37:59 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
7/9/2020 9:37:58 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
7/9/2020 9:37:58 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Parks Department
7/9/2020 9:37:57 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
7/9/2020 9:37:56 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Colorado Geological Survey on behalf of Colorado Geological Survey
7/9/2020 9:37:56 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Health Department
7/9/2020 9:37:54 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joanna Williams on behalf of Colorado Division of Water Resources
7/9/2020 9:37:54 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kathy Andrew on behalf of EPC Environmental Services
7/9/2020 9:37:53 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
7/9/2020 9:37:52 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Edi Anderson on behalf of EPC County Attorney's Office
7/9/2020 9:37:52 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
7/9/2020 9:37:51 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Lori Seago on behalf of County Attorney - Development Review
7/9/2020 9:37:51 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
7/9/2020 9:37:50 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Parks Department
7/9/2020 9:37:50 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kari Parsons on behalf of PCD Project Manager
7/9/2020 9:37:48 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/9/2020 9:37:44 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Health Department
7/9/2020 9:37:42 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kathy Andrew on behalf of EPC Environmental Services
7/9/2020 9:37:40 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Edi Anderson on behalf of EPC County Attorney's Office
7/9/2020 9:37:39 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Lori Seago on behalf of County Attorney - Development Review
7/9/2020 9:37:38 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kari Parsons on behalf of PCD Project Manager
7/9/2020 9:37:36 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/9/2020 9:34:57 AM Fees paid: 7/9/2020 (Receipt: 1002946)
7/7/2020 9:05:04 AM Payment Request sent: 7/7/2020
7/7/2020 9:04:44 AM Submission Triaged
7/2/2020 1:11:02 PM Submission received from Applicant
6/24/2020 8:38:48 AM Submission request sent to Applicant
6/24/2020 8:24:19 AM Submission request sent to Applicant
6/24/2020 8:23:45 AM Submission Triaged
6/22/2020 1:14:01 PM Submission received from Applicant
3/3/2020 4:56:42 PM Request for Review Comments returned by Colorado Springs Planning & Community Development
2/20/2020 12:51:34 PM Submission request sent to Applicant
8/1/2019 8:46:47 AM Submission request sent to Applicant
7/30/2019 11:22:52 AM Submission request sent to Applicant
5/7/2019 2:02:03 PM Request for Review Comments returned by Parks Advisory Board
5/6/2019 11:03:37 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
4/26/2019 9:32:16 AM Request for Review Comments returned by Parks Advisory Board
4/15/2019 1:04:39 PM Request for Review Comments returned by EPC County Attorney's Office
4/3/2019 4:28:23 PM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
4/1/2019 10:54:04 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
3/28/2019 12:33:21 PM Submission request sent to Applicant
3/28/2019 12:31:09 PM Request for Review Comments returned by PCD Project Manager
3/28/2019 11:13:57 AM Request for Review Comments returned by EPC Parks Department
3/27/2019 6:23:02 PM Request for Review Comments returned by EPC Health Department
3/20/2019 11:27:09 PM Request for Review Comments returned by PCD Engineering Division
3/18/2019 3:37:33 PM Request for Review Comments returned by Pikes Peak Regional Building Department
3/18/2019 10:45:05 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/15/2019 10:50:59 AM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
3/6/2019 8:55:58 AM Request for Review Comments returned by Colorado Division of Water Resources
3/5/2019 11:01:39 AM Request for Review Comments returned by Falcon Fire Protection District
3/1/2019 2:53:28 PM Request for Review Comments returned by EPC Environmental Services
2/28/2019 3:18:58 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
2/27/2019 2:24:25 PM Request for Review Comments returned by Mountain Metro Transit (City of COS)
2/26/2019 2:19:16 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
2/25/2019 9:19:28 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Josh Braunschweig on behalf of Mountain View Electric Association, Inc.
2/25/2019 9:19:24 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Christoph Zurcher on behalf of Mountain Metro Transit (City of COS)
2/25/2019 9:19:20 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
2/25/2019 9:19:16 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Melissa Andrews on behalf of Falcon 49
2/25/2019 9:19:08 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/25/2019 9:19:04 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
2/25/2019 9:19:00 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
2/25/2019 9:18:55 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Water & Wastewater Collections Manager Jonathon Smith on behalf of Cherokee Metro Dist
2/25/2019 9:18:50 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Autumn Mason on behalf of Central Marksheffel Metro
2/25/2019 9:18:45 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joe Valdez on behalf of Black Hills Energy-Aquila
2/25/2019 9:18:40 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
2/25/2019 9:18:35 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
2/25/2019 9:18:30 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
2/25/2019 9:18:25 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joanna Williams on behalf of Colorado Division of Water Resources
2/25/2019 9:18:20 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
2/25/2019 9:18:16 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
2/25/2019 9:18:12 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Parks Department
2/25/2019 9:18:00 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Health Department
2/25/2019 9:17:55 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kathy Andrew on behalf of EPC Environmental Services
2/25/2019 9:17:50 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Edi Anderson on behalf of EPC County Attorney's Office
2/25/2019 9:17:46 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kari Parsons on behalf of PCD Project Manager
2/25/2019 9:17:42 AM Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/25/2019 9:04:41 AM Fees paid: 2/25/2019 (Receipt: 1001248)
2/22/2019 10:14:39 AM Payment Request sent: 2/22/2019
2/22/2019 10:14:29 AM File # Assigned: SP193
2/22/2019 10:13:36 AM Submission Triaged
2/22/2019 10:13:02 AM Submission received from Applicant
2/22/2019 10:06:10 AM Submission request sent to Applicant
2/22/2019 10:05:49 AM Submission Triaged
2/22/2019 7:31:45 AM Submission received from Applicant
6/28/2018 11:13:11 AM Submission request sent to Applicant
6/26/2018 1:15:46 PM Project Manager Assigned: Kari Parsons
6/26/2018 1:15:46 PM EA Assigned: EA18200
6/26/2018 1:15:46 PM Project Created