8/25/2021 1:23:59 PM
|
Project Closed
|
8/25/2021 1:23:59 PM
|
Project Approved: 8/25/2021
|
8/25/2021 1:23:39 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
8/25/2021 12:47:43 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/24/2021 2:32:08 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/24/2021 2:31:07 PM
|
Submission Triaged
|
8/24/2021 2:19:50 PM
|
Submission received from Applicant
|
8/24/2021 2:12:29 PM
|
Submission request sent to Applicant
|
8/3/2021 11:20:47 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/28/2021 12:32:35 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/28/2021 12:31:36 PM
|
Submission Triaged
|
7/28/2021 12:21:14 PM
|
Submission received from Applicant
|
7/28/2021 9:19:57 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/28/2021 9:19:20 AM
|
Submission request sent to Applicant
|
7/28/2021 8:53:48 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/16/2021 11:17:47 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
7/16/2021 11:17:45 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/16/2021 11:16:02 AM
|
Submission Triaged
|
7/16/2021 10:58:14 AM
|
Submission received from Applicant
|
7/9/2021 3:01:18 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
7/7/2021 2:51:50 PM
|
Submission request sent to Applicant
|
7/7/2021 2:14:58 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/30/2021 2:36:49 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
6/30/2021 10:20:30 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/25/2021 11:53:47 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/25/2021 11:52:12 AM
|
Request for Review Comments email resent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
6/25/2021 11:51:01 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/23/2021 10:05:30 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/17/2021 8:57:21 AM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
6/15/2021 12:28:38 PM
|
Fees paid: 6/15/2021 (Receipt: 1004577)
|
6/15/2021 12:23:31 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/15/2021 12:23:25 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
6/15/2021 12:23:14 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
6/15/2021 12:23:11 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Jeff Munger on behalf of Cherokee Metro Dist
|
6/15/2021 12:23:07 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
6/15/2021 12:23:04 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
6/15/2021 12:23:00 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/15/2021 12:20:18 PM
|
Payment Request sent: 6/15/2021
|
6/15/2021 12:18:47 PM
|
Submission Triaged
|
6/15/2021 12:14:58 PM
|
Submission received from Applicant
|
6/15/2021 12:11:41 PM
|
Submission request sent to Applicant
|
6/3/2021 9:27:43 AM
|
Submission request sent to Applicant
|
6/3/2021 9:27:15 AM
|
Project reopened for Review Comments
|
4/14/2021 12:17:04 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
4/2/2021 3:55:49 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/25/2021 7:24:47 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/23/2021 4:04:50 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
3/23/2021 4:04:46 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/23/2021 4:04:05 PM
|
Submission Triaged
|
3/23/2021 4:01:58 PM
|
Submission received from Applicant
|
3/23/2021 7:24:12 AM
|
Submission request sent to Applicant
|
3/22/2021 5:03:25 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/19/2021 2:45:22 PM
|
Submission Triaged
|
3/19/2021 2:33:40 PM
|
Submission received from Applicant
|
3/19/2021 11:48:55 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/19/2021 11:34:46 AM
|
Submission request sent to Applicant
|
3/11/2021 4:18:23 PM
|
Submission Triaged
|
3/11/2021 2:16:22 PM
|
Submission received from Applicant
|
3/11/2021 7:08:12 AM
|
Submission request sent to Applicant
|
3/9/2021 9:36:33 AM
|
Submission Triaged
|
3/9/2021 8:11:52 AM
|
Submission received from Applicant
|
3/9/2021 7:45:16 AM
|
Submission request sent to Applicant
|
3/9/2021 7:05:53 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
3/9/2021 7:05:50 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/9/2021 7:04:47 AM
|
Submission Triaged
|
3/8/2021 2:05:09 PM
|
Submission received from Applicant
|
2/26/2021 8:26:49 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
2/23/2021 4:39:10 PM
|
Submission request sent to Applicant
|
2/23/2021 4:38:46 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
2/23/2021 4:37:53 PM
|
Submission Triaged
|
2/23/2021 4:35:49 PM
|
Submission received from Applicant
|
2/23/2021 9:50:30 AM
|
Submission request sent to Applicant
|
2/23/2021 8:22:08 AM
|
Submission request sent to Applicant
|
2/22/2021 12:29:00 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
2/17/2021 3:26:18 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
2/17/2021 11:33:24 AM
|
Submission request sent to Applicant
|
2/15/2021 10:46:02 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
2/12/2021 1:35:13 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/11/2021 5:08:37 PM
|
Submission request sent to Applicant
|
2/11/2021 10:39:47 AM
|
Submission request sent to Applicant
|
2/10/2021 7:20:30 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/10/2021 11:56:53 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/10/2021 11:56:49 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
2/10/2021 11:55:43 AM
|
Submission Triaged
|
2/10/2021 10:16:45 AM
|
Submission received from Applicant
|
2/10/2021 7:17:24 AM
|
Submission request sent to Applicant
|
2/9/2021 8:36:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/9/2021 4:43:17 PM
|
Submission request sent to Applicant
|
2/9/2021 1:37:52 PM
|
Submission request canceled
|
2/9/2021 12:12:42 PM
|
Submission request sent to Applicant
|
2/5/2021 2:39:00 PM
|
Submission Triaged
|
2/5/2021 2:09:45 PM
|
Submission received from Applicant
|
2/5/2021 12:54:55 PM
|
Submission request sent to Applicant
|
2/5/2021 12:53:49 PM
|
Submission request sent to Applicant
|
2/4/2021 5:27:22 PM
|
Submission Triaged
|
2/4/2021 4:56:17 PM
|
Submission received from Applicant
|
2/4/2021 1:56:55 PM
|
Submission request sent to Applicant
|
2/4/2021 8:49:17 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
2/4/2021 8:12:14 AM
|
Submission request sent to Applicant
|
2/4/2021 8:11:26 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/4/2021 7:43:15 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
2/4/2021 7:41:45 AM
|
Submission request canceled
|
2/3/2021 10:50:53 AM
|
Submission request sent to Applicant
|
2/3/2021 10:36:24 AM
|
Submission request sent to Applicant
|
2/3/2021 10:17:37 AM
|
Submission Triaged
|
2/3/2021 10:14:19 AM
|
Submission received from Applicant
|
2/3/2021 10:06:38 AM
|
Submission request sent to Applicant
|
1/20/2021 9:28:23 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Jeff Munger on behalf of Cherokee Metro Dist
|
1/20/2021 9:26:39 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
1/20/2021 9:26:33 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/20/2021 9:26:27 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/20/2021 9:10:02 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
1/20/2021 9:10:00 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/20/2021 9:09:56 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/20/2021 8:56:52 AM
|
Submission Triaged
|
1/20/2021 7:55:45 AM
|
Submission received from Applicant
|
1/9/2021 2:01:09 PM
|
Request for Review Comments returned by EPC Health Department
|
12/31/2020 9:04:57 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
12/28/2020 9:46:41 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/10/2020 8:28:38 AM
|
Submission request sent to Applicant
|
12/10/2020 8:27:04 AM
|
Submission request sent to Applicant
|
12/10/2020 8:25:12 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/9/2020 4:52:26 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/8/2020 12:47:45 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
12/8/2020 9:37:54 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/4/2020 4:44:57 PM
|
Request for Review Comments returned by EPC Parks Department
|
12/4/2020 4:42:30 PM
|
Request for Review Comments returned by Parks Advisory Board
|
12/1/2020 6:15:13 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
12/1/2020 10:47:39 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/30/2020 5:02:22 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/18/2020 11:15:39 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/18/2020 8:55:34 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
11/13/2020 1:39:02 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
11/12/2020 4:47:52 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/12/2020 3:44:21 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
11/12/2020 2:07:03 PM
|
Request for Review Comments returned by EPC Environmental Services
|
11/12/2020 9:48:43 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/10/2020 2:54:01 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Josh Braunschweig on behalf of Mountain View Electric Association, Inc.
|
11/10/2020 2:53:59 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Christoph Zurcher on behalf of Mountain Metro Transit (City of COS)
|
11/10/2020 2:53:57 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
|
11/10/2020 2:53:55 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Melissa Andrews on behalf of Falcon 49
|
11/10/2020 2:53:52 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/10/2020 2:53:48 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Terry Johns on behalf of Colorado Springs SD 11
|
11/10/2020 2:53:36 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
11/10/2020 2:53:30 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
11/10/2020 2:53:28 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
11/10/2020 2:53:26 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Water & Wastewater Collections Manager Jonathon Smith on behalf of Cherokee Metro Dist
|
11/10/2020 2:53:24 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Autumn Mason on behalf of Central Marksheffel Metro
|
11/10/2020 2:53:22 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
11/10/2020 2:53:19 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
11/10/2020 2:53:17 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
11/10/2020 2:53:13 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
11/10/2020 2:53:10 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
11/10/2020 2:53:06 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
11/10/2020 2:53:00 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/10/2020 2:52:58 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
|
11/10/2020 2:52:54 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/10/2020 2:52:52 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
11/10/2020 2:52:50 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Parks Department
|
11/10/2020 2:52:41 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Health Department
|
11/10/2020 2:52:35 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kathy Andrew on behalf of EPC Environmental Services
|
11/10/2020 2:52:31 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Edi Anderson on behalf of EPC County Attorney's Office
|
11/10/2020 2:52:29 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Lori Seago on behalf of County Attorney - Development Review
|
11/10/2020 2:52:27 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kari Parsons on behalf of PCD Project Manager
|
11/10/2020 2:52:23 PM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/10/2020 2:50:25 PM
|
Submission Triaged
|
11/10/2020 2:42:24 PM
|
Submission received from Applicant
|
11/10/2020 2:36:22 PM
|
Submission request sent to Applicant
|
11/10/2020 2:34:55 PM
|
Submission Triaged
|
11/10/2020 2:30:46 PM
|
Submission received from Applicant
|
11/10/2020 12:24:44 PM
|
Submission request sent to Applicant
|
10/30/2020 7:32:36 AM
|
Submission request sent to Applicant
|
8/20/2020 5:29:11 PM
|
Submission request sent to Applicant
|
8/20/2020 5:27:38 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/19/2020 8:48:25 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
8/17/2020 10:11:31 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/13/2020 3:11:06 PM
|
Request for Review Comments returned by Parks Advisory Board
|
8/3/2020 7:50:27 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/31/2020 11:47:55 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
7/31/2020 10:05:26 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/29/2020 9:24:49 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
7/29/2020 9:21:51 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
7/28/2020 4:43:38 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
7/28/2020 4:40:21 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
7/28/2020 9:34:18 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
7/24/2020 7:58:38 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
7/23/2020 4:39:54 PM
|
Request for Review Comments returned by EPC Parks Department
|
7/23/2020 4:38:57 PM
|
Request for Review Comments returned by EPC Parks Department
|
7/17/2020 11:06:24 AM
|
Request for Review Comments returned by EPC Environmental Services
|
7/17/2020 11:05:39 AM
|
Request for Review Comments returned by EPC Environmental Services
|
7/14/2020 10:43:13 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
7/13/2020 8:04:30 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/12/2020 5:27:03 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/12/2020 5:24:00 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/10/2020 2:57:02 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
7/10/2020 2:56:04 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
7/9/2020 11:50:33 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
7/9/2020 11:50:03 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
7/9/2020 9:38:16 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Josh Braunschweig on behalf of Mountain View Electric Association, Inc.
|
7/9/2020 9:38:15 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Christoph Zurcher on behalf of Mountain Metro Transit (City of COS)
|
7/9/2020 9:38:14 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
|
7/9/2020 9:38:13 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Melissa Andrews on behalf of Falcon 49
|
7/9/2020 9:38:12 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Autumn Mason on behalf of Central Marksheffel Metro
|
7/9/2020 9:38:11 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/9/2020 9:38:11 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
7/9/2020 9:38:10 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Terry Johns on behalf of Colorado Springs SD 11
|
7/9/2020 9:38:09 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
7/9/2020 9:38:09 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
7/9/2020 9:38:08 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
7/9/2020 9:38:06 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
7/9/2020 9:38:06 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
7/9/2020 9:38:05 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
7/9/2020 9:38:05 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
7/9/2020 9:38:04 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Water & Wastewater Collections Manager Jonathon Smith on behalf of Cherokee Metro Dist
|
7/9/2020 9:38:04 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
7/9/2020 9:38:03 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Autumn Mason on behalf of Central Marksheffel Metro
|
7/9/2020 9:38:02 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
7/9/2020 9:38:02 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
7/9/2020 9:38:01 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
7/9/2020 9:38:01 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
|
7/9/2020 9:38:00 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
7/9/2020 9:38:00 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
7/9/2020 9:37:59 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
7/9/2020 9:37:58 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
7/9/2020 9:37:58 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Parks Department
|
7/9/2020 9:37:57 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
7/9/2020 9:37:56 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
7/9/2020 9:37:56 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Health Department
|
7/9/2020 9:37:54 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
7/9/2020 9:37:54 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kathy Andrew on behalf of EPC Environmental Services
|
7/9/2020 9:37:53 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
|
7/9/2020 9:37:52 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Edi Anderson on behalf of EPC County Attorney's Office
|
7/9/2020 9:37:52 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
7/9/2020 9:37:51 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Lori Seago on behalf of County Attorney - Development Review
|
7/9/2020 9:37:51 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
7/9/2020 9:37:50 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Parks Department
|
7/9/2020 9:37:50 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kari Parsons on behalf of PCD Project Manager
|
7/9/2020 9:37:48 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/9/2020 9:37:44 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Health Department
|
7/9/2020 9:37:42 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kathy Andrew on behalf of EPC Environmental Services
|
7/9/2020 9:37:40 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Edi Anderson on behalf of EPC County Attorney's Office
|
7/9/2020 9:37:39 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Lori Seago on behalf of County Attorney - Development Review
|
7/9/2020 9:37:38 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kari Parsons on behalf of PCD Project Manager
|
7/9/2020 9:37:36 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/9/2020 9:34:57 AM
|
Fees paid: 7/9/2020 (Receipt: 1002946)
|
7/7/2020 9:05:04 AM
|
Payment Request sent: 7/7/2020
|
7/7/2020 9:04:44 AM
|
Submission Triaged
|
7/2/2020 1:11:02 PM
|
Submission received from Applicant
|
6/24/2020 8:38:48 AM
|
Submission request sent to Applicant
|
6/24/2020 8:24:19 AM
|
Submission request sent to Applicant
|
6/24/2020 8:23:45 AM
|
Submission Triaged
|
6/22/2020 1:14:01 PM
|
Submission received from Applicant
|
3/3/2020 4:56:42 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
2/20/2020 12:51:34 PM
|
Submission request sent to Applicant
|
8/1/2019 8:46:47 AM
|
Submission request sent to Applicant
|
7/30/2019 11:22:52 AM
|
Submission request sent to Applicant
|
5/7/2019 2:02:03 PM
|
Request for Review Comments returned by Parks Advisory Board
|
5/6/2019 11:03:37 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
|
4/26/2019 9:32:16 AM
|
Request for Review Comments returned by Parks Advisory Board
|
4/15/2019 1:04:39 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
4/3/2019 4:28:23 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
4/1/2019 10:54:04 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
3/28/2019 12:33:21 PM
|
Submission request sent to Applicant
|
3/28/2019 12:31:09 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/28/2019 11:13:57 AM
|
Request for Review Comments returned by EPC Parks Department
|
3/27/2019 6:23:02 PM
|
Request for Review Comments returned by EPC Health Department
|
3/20/2019 11:27:09 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/18/2019 3:37:33 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/18/2019 10:45:05 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
3/15/2019 10:50:59 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
3/6/2019 8:55:58 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/5/2019 11:01:39 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
3/1/2019 2:53:28 PM
|
Request for Review Comments returned by EPC Environmental Services
|
2/28/2019 3:18:58 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/27/2019 2:24:25 PM
|
Request for Review Comments returned by Mountain Metro Transit (City of COS)
|
2/26/2019 2:19:16 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
2/25/2019 9:19:28 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Josh Braunschweig on behalf of Mountain View Electric Association, Inc.
|
2/25/2019 9:19:24 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Christoph Zurcher on behalf of Mountain Metro Transit (City of COS)
|
2/25/2019 9:19:20 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
|
2/25/2019 9:19:16 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Melissa Andrews on behalf of Falcon 49
|
2/25/2019 9:19:08 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/25/2019 9:19:04 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
2/25/2019 9:19:00 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
2/25/2019 9:18:55 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Water & Wastewater Collections Manager Jonathon Smith on behalf of Cherokee Metro Dist
|
2/25/2019 9:18:50 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Autumn Mason on behalf of Central Marksheffel Metro
|
2/25/2019 9:18:45 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
2/25/2019 9:18:40 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
2/25/2019 9:18:35 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
2/25/2019 9:18:30 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
2/25/2019 9:18:25 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/25/2019 9:18:20 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of Parks Advisory Board
|
2/25/2019 9:18:16 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
2/25/2019 9:18:12 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Parks Department
|
2/25/2019 9:18:00 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by on behalf of EPC Health Department
|
2/25/2019 9:17:55 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/25/2019 9:17:50 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Edi Anderson on behalf of EPC County Attorney's Office
|
2/25/2019 9:17:46 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Kari Parsons on behalf of PCD Project Manager
|
2/25/2019 9:17:42 AM
|
Request for Review Comments email sent for Project Windermere Preliminary Plan Amendment for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/25/2019 9:04:41 AM
|
Fees paid: 2/25/2019 (Receipt: 1001248)
|
2/22/2019 10:14:39 AM
|
Payment Request sent: 2/22/2019
|
2/22/2019 10:14:29 AM
|
File # Assigned: SP193
|
2/22/2019 10:13:36 AM
|
Submission Triaged
|
2/22/2019 10:13:02 AM
|
Submission received from Applicant
|
2/22/2019 10:06:10 AM
|
Submission request sent to Applicant
|
2/22/2019 10:05:49 AM
|
Submission Triaged
|
2/22/2019 7:31:45 AM
|
Submission received from Applicant
|
6/28/2018 11:13:11 AM
|
Submission request sent to Applicant
|
6/26/2018 1:15:46 PM
|
Project Manager Assigned: Kari Parsons
|
6/26/2018 1:15:46 PM
|
EA Assigned: EA18200
|
6/26/2018 1:15:46 PM
|
Project Created
|