1/2/2024 10:41:13 AM
|
Submission request canceled
|
1/2/2024 10:38:14 AM
|
Submission request sent to Applicant
|
4/4/2022 10:15:33 AM
|
Project Closed
|
4/4/2022 10:15:33 AM
|
Project Approved: 4/4/2022
|
4/4/2022 8:40:06 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/31/2022 12:11:08 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/31/2022 10:52:25 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/31/2022 10:51:28 AM
|
Submission Triaged
|
3/31/2022 9:37:24 AM
|
Submission received from Applicant
|
3/31/2022 7:05:21 AM
|
Submission request sent to Applicant
|
3/29/2022 3:49:32 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/23/2022 8:50:31 AM
|
Project reopened for Review Comments
|
3/22/2022 4:37:34 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/22/2022 4:37:32 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kari Parsons on behalf of PCD Project Manager
|
3/22/2022 4:36:04 PM
|
Submission Triaged
|
3/22/2022 3:27:01 PM
|
Submission received from Applicant
|
3/9/2022 4:55:34 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/1/2022 11:45:18 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/1/2022 11:12:48 AM
|
Submission request sent to Applicant
|
3/1/2022 11:11:19 AM
|
Submission request sent to Applicant
|
3/1/2022 11:09:44 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/22/2022 3:16:30 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/22/2022 11:06:53 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
2/22/2022 11:05:44 AM
|
Submission Triaged
|
2/22/2022 10:41:31 AM
|
Submission received from Applicant
|
2/22/2022 9:59:03 AM
|
Submission request sent to Applicant
|
2/19/2022 10:48:18 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/14/2022 12:55:52 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
2/14/2022 12:55:50 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kari Parsons on behalf of PCD Project Manager
|
2/14/2022 12:53:52 PM
|
Submission Triaged
|
2/14/2022 12:03:55 PM
|
Submission received from Applicant
|
2/14/2022 9:59:08 AM
|
Submission request sent to Applicant
|
2/14/2022 9:58:27 AM
|
Project reopened for Approval requests
|
9/22/2021 6:58:41 AM
|
Project Closed
|
9/22/2021 6:58:41 AM
|
Project Approved: 9/22/2021
|
9/21/2021 6:50:02 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/21/2021 12:35:27 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by on behalf of Parks Advisory Board
|
9/21/2021 7:59:43 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
9/21/2021 7:59:40 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kari Parsons on behalf of PCD Project Manager
|
9/21/2021 7:59:38 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/21/2021 7:58:33 AM
|
Submission Triaged
|
9/21/2021 7:58:04 AM
|
Submission received from Applicant
|
9/21/2021 7:41:11 AM
|
Submission request sent to Applicant
|
9/15/2021 10:28:41 AM
|
Request for Review Comments returned by PCD Engineering Division
|
9/2/2021 1:21:52 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/22/2021 4:25:50 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
8/17/2021 5:11:34 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
8/17/2021 5:10:56 PM
|
Submission Triaged
|
8/17/2021 2:55:02 PM
|
Submission received from Applicant
|
8/17/2021 7:06:13 AM
|
Submission request sent to Applicant
|
8/10/2021 3:56:03 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/3/2021 3:34:46 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/3/2021 11:50:28 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
8/3/2021 11:49:39 AM
|
Submission Triaged
|
8/3/2021 11:49:05 AM
|
Submission received from Applicant
|
8/3/2021 10:22:02 AM
|
Submission request sent to Applicant
|
7/29/2021 1:53:23 PM
|
Submission Triaged
|
7/29/2021 1:50:40 PM
|
Submission received from Applicant
|
7/29/2021 12:16:29 PM
|
Submission request sent to Applicant
|
7/28/2021 1:51:38 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
7/28/2021 1:51:35 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kari Parsons on behalf of PCD Project Manager
|
7/28/2021 1:51:33 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/28/2021 1:50:14 PM
|
Submission Triaged
|
7/28/2021 1:22:29 PM
|
Submission received from Applicant
|
7/27/2021 4:53:23 PM
|
Submission request sent to Applicant
|
7/12/2021 11:21:19 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/12/2021 1:15:25 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/8/2021 8:31:51 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/21/2021 3:15:25 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
6/21/2021 3:15:23 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kari Parsons on behalf of PCD Project Manager
|
6/21/2021 3:15:19 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/21/2021 3:14:01 PM
|
Submission Triaged
|
6/17/2021 4:10:07 PM
|
Submission received from Applicant
|
6/10/2021 4:39:36 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/4/2021 3:28:48 PM
|
Submission request sent to Applicant
|
6/4/2021 3:27:05 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/27/2021 8:25:09 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/24/2021 9:14:03 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kari Parsons on behalf of PCD Project Manager
|
5/24/2021 9:12:00 AM
|
Submission Triaged
|
5/23/2021 9:18:44 PM
|
Submission received from Applicant
|
5/18/2021 4:29:00 PM
|
Submission request sent to Applicant
|
5/18/2021 4:28:18 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/13/2021 1:59:21 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
5/13/2021 1:59:19 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kari Parsons on behalf of PCD Project Manager
|
5/13/2021 1:59:15 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/13/2021 1:57:37 PM
|
Submission Triaged
|
5/13/2021 1:51:55 PM
|
Submission received from Applicant
|
5/12/2021 4:24:44 PM
|
Request for Review Comments returned by Woodmen Road Metro
|
4/27/2021 10:03:26 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/20/2021 4:56:43 PM
|
Submission request sent to Applicant
|
4/20/2021 4:53:48 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Rebecca Hardekopf on behalf of Woodmen Road Metro
|
4/20/2021 4:51:08 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/20/2021 4:00:19 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/14/2021 9:21:25 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/6/2021 9:26:47 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/24/2021 5:00:15 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/24/2021 4:56:37 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/24/2021 4:56:35 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
3/24/2021 4:55:40 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/24/2021 4:55:38 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kari Parsons on behalf of PCD Project Manager
|
3/24/2021 4:55:34 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/24/2021 4:53:11 PM
|
Submission Triaged
|
3/24/2021 1:37:21 PM
|
Submission received from Applicant
|
2/26/2021 1:32:16 PM
|
Submission request sent to Applicant
|
2/26/2021 1:28:16 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/26/2021 8:17:04 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/23/2021 2:05:49 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/22/2021 3:38:53 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/16/2021 5:15:05 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/8/2021 7:21:55 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/27/2021 4:55:56 PM
|
Project Manager Assigned: Kari Parsons
|
1/26/2021 3:02:50 PM
|
Request for Review Comments returned by EPC Environmental Services
|
1/26/2021 11:35:11 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
1/26/2021 11:35:07 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/26/2021 11:35:05 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by on behalf of EPC Parks Department
|
1/26/2021 11:35:03 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/26/2021 11:35:01 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
1/26/2021 11:34:57 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Ryan Howser on behalf of PCD Project Manager
|
1/26/2021 11:34:53 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/26/2021 11:32:14 AM
|
Submission Triaged
|
1/24/2021 7:30:38 AM
|
Submission received from Applicant
|
12/27/2020 2:04:10 PM
|
Project Manager Assigned: Ryan Howser
|
11/25/2020 3:57:20 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
11/23/2020 1:17:15 AM
|
Submission request sent to Applicant
|
11/23/2020 1:14:35 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/23/2020 12:50:47 AM
|
Request for Review Comments email resent for Project Paint Brush Hills Filing No. 14 for review by Lindsay Darden on behalf of PCD Project Manager
|
11/16/2020 8:10:06 AM
|
Request for Review Comments returned by Parks Advisory Board
|
11/14/2020 5:37:17 PM
|
Request for Review Comments returned by EPC Health Department
|
11/12/2020 1:46:45 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/12/2020 11:14:01 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/10/2020 3:28:53 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
11/9/2020 5:11:13 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/6/2020 12:10:12 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/5/2020 4:48:43 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/4/2020 2:27:41 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
11/3/2020 2:27:55 PM
|
Submission request sent to Applicant
|
11/3/2020 2:00:14 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
10/30/2020 2:38:26 PM
|
Request for Review Comments returned by EPC Parks Department
|
10/29/2020 4:34:39 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/29/2020 4:34:37 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by on behalf of EPC Parks Department
|
10/29/2020 4:34:35 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
10/29/2020 4:34:31 PM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/29/2020 4:13:02 PM
|
Submission Triaged
|
10/29/2020 4:08:14 PM
|
Submission received from Applicant
|
10/29/2020 3:59:17 PM
|
Submission request sent to Applicant
|
10/29/2020 8:33:17 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/27/2020 10:53:02 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/23/2020 8:40:36 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
10/22/2020 7:53:48 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Leon Gomes on behalf of Paint Brush Hills Metro
|
10/22/2020 7:53:46 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Greg Langer on behalf of Natural Resources Conservation Service (Federal Agency)
|
10/22/2020 7:53:44 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
10/22/2020 7:53:42 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Christoph Zurcher on behalf of Mountain Metro Transit (City of COS)
|
10/22/2020 7:53:40 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
|
10/22/2020 7:53:38 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Melissa Andrews on behalf of Falcon 49
|
10/22/2020 7:53:36 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Sebastian Schwender on behalf of Black Hills Energy-Aquila
|
10/22/2020 7:53:33 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
10/22/2020 7:53:31 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
10/22/2020 7:53:29 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/22/2020 7:53:27 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Larry Long on behalf of Colorado State Forest Service
|
10/22/2020 7:53:25 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
10/22/2020 7:53:21 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/22/2020 7:53:19 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by on behalf of Parks Advisory Board
|
10/22/2020 7:53:17 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/22/2020 7:53:15 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
10/22/2020 7:53:13 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by on behalf of EPC Parks Department
|
10/22/2020 7:53:11 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by on behalf of EPC Health Department
|
10/22/2020 7:53:05 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/22/2020 7:53:03 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lori Seago on behalf of County Attorney - Development Review
|
10/22/2020 7:53:01 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Lindsay Darden on behalf of PCD Project Manager
|
10/22/2020 7:52:57 AM
|
Request for Review Comments email sent for Project Paint Brush Hills Filing No. 14 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/21/2020 4:43:36 PM
|
Fees paid: 10/21/2020 (Receipt: 1003440)
|
10/21/2020 3:32:09 PM
|
Payment Request sent: 10/21/2020
|
10/21/2020 3:32:00 PM
|
File # Assigned: SF2024
|
10/21/2020 3:31:35 PM
|
Submission Triaged
|
10/20/2020 10:11:54 AM
|
Submission received from Applicant
|
9/2/2020 3:58:53 PM
|
Submission request sent to Applicant
|
9/2/2020 3:56:18 PM
|
Submission Triaged
|
8/31/2020 5:18:11 PM
|
Submission received from Applicant
|
7/15/2020 8:27:03 AM
|
Submission request sent to Applicant
|
7/10/2020 2:07:49 PM
|
Project reopened for Review Comments
|
4/16/2020 3:15:07 PM
|
Project Manager Assigned: Lindsay Darden
|
5/7/2019 12:00:00 AM
|
Project Closed
|
5/7/2019 12:00:00 AM
|
Project Expired one year after 05/07/2018 Submission Request 05/07/2019
|
5/7/2018 4:56:56 PM
|
Submission request sent to Applicant
|
1/4/2018 11:00:16 AM
|
Submission request sent to Applicant
|
1/4/2018 10:52:23 AM
|
Project Manager Assigned: Kari Parsons
|
1/4/2018 10:52:23 AM
|
EA Assigned: 17-149
|
1/4/2018 10:52:23 AM
|
Project Created
|