5/13/2022 10:38:40 AM
|
Project Closed
|
5/13/2022 10:38:40 AM
|
Project Approved: 5/13/2022
|
10/16/2020 7:59:59 AM
|
Submission request sent to Applicant
|
10/14/2020 4:45:31 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/23/2020 3:35:40 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/23/2020 3:33:34 PM
|
Submission Triaged
|
9/23/2020 10:30:23 AM
|
Submission received from Applicant
|
9/22/2020 8:30:58 PM
|
Submission request sent to Applicant
|
9/22/2020 4:28:05 PM
|
Project reopened for Review Comments
|
6/26/2020 6:45:27 AM
|
Project Closed
|
6/26/2020 6:45:27 AM
|
Project Approved: 6/26/2020
|
6/2/2020 10:38:51 AM
|
Submission Triaged
|
6/2/2020 8:06:06 AM
|
Submission received from Applicant
|
6/1/2020 9:50:21 PM
|
Submission request sent to Applicant
|
4/11/2020 6:36:28 AM
|
Submission Triaged
|
4/10/2020 2:53:20 PM
|
Submission received from Applicant
|
4/10/2020 1:59:34 PM
|
Submission request sent to Applicant
|
4/10/2020 1:59:14 PM
|
Submission Triaged
|
4/10/2020 1:13:48 PM
|
Submission received from Applicant
|
4/7/2020 8:04:00 PM
|
Submission request sent to Applicant
|
3/30/2020 2:31:49 PM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
3/29/2020 11:08:18 AM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
3/28/2020 12:57:10 PM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
3/25/2020 4:48:12 PM
|
Submission request sent to Applicant
|
3/25/2020 4:45:53 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/24/2020 11:17:23 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/2/2020 5:31:13 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
3/2/2020 5:31:12 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
3/2/2020 5:31:11 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
3/2/2020 5:31:10 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
3/2/2020 5:31:07 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/2/2020 5:26:06 AM
|
Submission Triaged
|
2/26/2020 7:50:48 AM
|
Submission received from Applicant
|
2/26/2020 7:27:31 AM
|
Submission request sent to Applicant
|
2/26/2020 7:26:44 AM
|
Submission Triaged
|
2/25/2020 1:18:57 PM
|
Submission received from Applicant
|
2/19/2020 11:57:34 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
2/1/2020 6:22:21 PM
|
Request for Review Comments returned by EPC Health Department
|
1/15/2020 5:16:36 PM
|
Submission request sent to Applicant
|
1/15/2020 5:14:06 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/15/2020 5:12:21 PM
|
Request for Review Comments email resent for Project Northbay at Lake Woodmoor Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
1/14/2020 6:37:01 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/13/2020 3:31:39 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/23/2019 9:16:31 AM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
12/19/2019 11:59:25 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
12/18/2019 3:02:52 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
12/18/2019 2:35:07 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/18/2019 1:10:13 PM
|
Request for Review Comments returned by Lewis Palmer 38
|
12/18/2019 10:27:07 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/11/2019 10:35:31 AM
|
Request for Review Comments returned by Parks Advisory Board
|
12/11/2019 10:28:42 AM
|
Request for Review Comments returned by EPC Parks Department
|
12/3/2019 3:38:37 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
12/3/2019 10:49:38 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/2/2019 5:18:11 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
12/2/2019 5:18:09 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/2/2019 10:55:02 AM
|
Request for Review Comments returned by EPC Environmental Services
|
11/25/2019 11:35:22 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
11/25/2019 4:57:41 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
11/25/2019 4:57:37 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
11/25/2019 4:57:33 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
11/25/2019 4:57:30 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
11/25/2019 4:57:26 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Christoph Zurcher on behalf of Mountain Metro Transit (City of COS)
|
11/25/2019 4:57:19 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Cheryl Wangeman on behalf of Lewis Palmer 38
|
11/25/2019 4:57:15 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
11/25/2019 4:57:11 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
11/25/2019 4:57:08 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
11/25/2019 4:57:04 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
11/25/2019 4:56:57 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by on behalf of Parks Advisory Board
|
11/25/2019 4:56:53 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by on behalf of EPC Parks Department
|
11/25/2019 4:56:37 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by on behalf of EPC Health Department
|
11/25/2019 4:56:34 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
11/25/2019 4:56:30 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
11/25/2019 4:56:26 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
11/25/2019 4:56:19 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/25/2019 4:51:10 AM
|
Submission Triaged
|
11/22/2019 1:09:44 PM
|
Submission received from Applicant
|
11/20/2019 10:28:29 AM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
11/5/2018 10:43:16 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
11/3/2018 11:18:32 AM
|
Request for Review Comments returned by EPC Health Department
|
10/29/2018 3:20:47 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
10/29/2018 2:16:51 PM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
10/23/2018 9:37:06 AM
|
Request for Review Comments email resent for Project Northbay at Lake Woodmoor Final Plat for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
10/22/2018 1:12:46 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/19/2018 11:21:56 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
10/17/2018 4:50:21 PM
|
Submission request sent to Applicant
|
10/17/2018 4:48:59 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/16/2018 4:08:54 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/16/2018 2:08:57 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/10/2018 8:17:06 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
10/9/2018 8:52:51 AM
|
Request for Review Comments returned by Parks Advisory Board
|
10/9/2018 8:47:38 AM
|
Request for Review Comments returned by EPC Parks Department
|
9/25/2018 5:11:56 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
9/25/2018 5:11:55 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
9/25/2018 5:11:54 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
9/25/2018 5:11:52 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/25/2018 5:11:51 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Ross Williams on behalf of Parks Advisory Board
|
9/25/2018 5:11:50 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by on behalf of EPC Parks Department
|
9/25/2018 5:11:47 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by on behalf of EPC Health Department
|
9/25/2018 5:11:46 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Nina Ruiz on behalf of PCD Project Manager
|
9/25/2018 5:11:44 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/25/2018 5:08:56 PM
|
Submission Triaged
|
9/24/2018 5:49:17 PM
|
Submission received from Applicant
|
2/23/2018 3:43:37 PM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
2/22/2018 11:21:17 AM
|
Request for Review Comments email resent for Project Northbay at Lake Woodmoor Final Plat for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
2/21/2018 4:05:47 PM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
2/15/2018 9:35:16 AM
|
Submission request sent to Applicant
|
2/15/2018 9:30:06 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
2/14/2018 3:39:58 PM
|
Submission request canceled
|
1/8/2018 10:20:03 AM
|
Request for Review Comments returned by EPC Health Department
|
1/5/2018 1:43:51 PM
|
Request for Review Comments returned by EPC Environmental Services
|
1/4/2018 9:46:00 AM
|
Request for Review Comments returned by Lewis Palmer 38
|
1/4/2018 8:32:21 AM
|
Submission request sent to Applicant
|
1/4/2018 7:24:22 AM
|
Submission request sent to Applicant
|
1/3/2018 9:12:32 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/28/2017 12:42:06 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/28/2017 8:59:32 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/28/2017 8:31:32 AM
|
Submission request sent to Applicant
|
12/27/2017 3:59:12 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
12/27/2017 2:04:24 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/27/2017 10:42:52 AM
|
Request for Review Comments returned by EPC Parks Department
|
12/26/2017 11:42:02 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
12/26/2017 11:49:39 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/19/2017 1:44:12 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/18/2017 11:00:16 AM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/18/2017 10:59:33 AM
|
Submission Triaged
|
12/18/2017 10:54:20 AM
|
Submission received from Applicant
|
12/18/2017 9:15:43 AM
|
Submission request sent to Applicant
|
12/13/2017 10:29:20 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
12/11/2017 4:27:44 PM
|
Submission request sent to Applicant
|
12/11/2017 3:27:32 PM
|
Request for Review Comments returned by EPC Environmental Services
|
12/8/2017 11:33:40 AM
|
Request for Review Comments returned by Mountain Metro Transit (City of COS)
|
12/8/2017 10:14:43 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/7/2017 4:56:08 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Administrator/Mgr on behalf of Woodmoor Improvement Association
|
12/7/2017 4:56:07 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
12/7/2017 4:56:06 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Paul Pirog on behalf of Tri Lakes Land Use Committee
|
12/7/2017 4:56:05 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Jackie Burhans on behalf of Tri Lakes Land Use Committee
|
12/7/2017 4:56:04 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Donna Wood on behalf of Tri Lakes Land Use Committee
|
12/7/2017 4:56:03 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Tom Vierzba on behalf of Tri Lakes Land Use Committee
|
12/7/2017 4:56:02 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Jerry Hannigan on behalf of Tri Lakes Land Use Committee
|
12/7/2017 4:56:01 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by John Bender on behalf of Tri Lakes Land Use Committee
|
12/7/2017 4:56:00 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
12/7/2017 4:55:59 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Greg Langer on behalf of Natural Resources Conservation Service (Federal Agency)
|
12/7/2017 4:55:58 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
12/7/2017 4:55:57 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Christoph Zurcher on behalf of Mountain Metro Transit (City of COS)
|
12/7/2017 4:55:56 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Jennifer Jones on behalf of Monument
|
12/7/2017 4:55:55 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Cheryl Wangeman on behalf of Lewis Palmer 38
|
12/7/2017 4:55:54 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Kip Petersen on behalf of Donala Water and San Dist
|
12/7/2017 4:55:53 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Sebastian Schwender on behalf of Black Hills Energy-Aquila
|
12/7/2017 4:55:52 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
12/7/2017 4:55:51 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
12/7/2017 4:55:50 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/7/2017 4:55:49 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/7/2017 4:55:48 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
12/7/2017 4:55:47 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
12/7/2017 4:55:46 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/7/2017 4:55:45 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
12/7/2017 4:55:44 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by on behalf of EPC Parks Department
|
12/7/2017 4:55:42 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Administration Christine Juarez on behalf of EPC Health Department
|
12/7/2017 4:55:42 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Program Supervisor Joe Lomeli on behalf of EPC Health Department
|
12/7/2017 4:55:41 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by on behalf of EPC Health Department
|
12/7/2017 4:55:40 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/7/2017 4:55:39 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Edi Anderson on behalf of EPC County Attorney's Office
|
12/7/2017 4:55:38 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Nina Ruiz on behalf of PCD Project Manager
|
12/7/2017 4:55:37 PM
|
Request for Review Comments email sent for Project Northbay at Lake Woodmoor for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/7/2017 4:54:50 PM
|
Submission Triaged
|
12/7/2017 4:54:18 PM
|
Submission received from Applicant
|
12/7/2017 4:48:33 PM
|
Submission request sent to Applicant
|
12/7/2017 4:45:46 PM
|
Submission Triaged
|
12/7/2017 3:11:27 PM
|
Submission received from Applicant
|
11/28/2017 4:22:43 PM
|
Submission request sent to Applicant
|
10/26/2017 5:32:10 PM
|
Submission request sent to Applicant
|
10/26/2017 4:52:49 PM
|
Project Manager Assigned: Nina Ruiz
|
10/26/2017 4:52:48 PM
|
File # Assigned: SF-16-021
|
10/26/2017 4:52:48 PM
|
Project Created
|