11/18/2020 5:09:50 AM
|
Project Closed
|
11/18/2020 5:09:50 AM
|
Project Approved: 11/18/2020
|
11/18/2020 5:09:16 AM
|
Submission request canceled
|
11/16/2020 8:28:26 AM
|
Submission request sent to Applicant
|
11/16/2020 8:03:30 AM
|
Request for Review Comments returned by PCD Engineering Division
|
10/21/2020 6:04:54 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/20/2020 5:15:08 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/5/2020 4:07:54 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
9/29/2020 6:29:25 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
9/29/2020 6:29:23 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Lori Seago on behalf of EPC County Attorney's Office
|
9/29/2020 6:29:17 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/29/2020 6:26:12 AM
|
Submission Triaged
|
9/28/2020 3:24:19 PM
|
Submission received from Applicant
|
5/19/2020 7:53:04 AM
|
Submission request sent to Applicant
|
5/18/2020 5:30:27 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/27/2020 5:19:05 PM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
4/27/2020 5:19:03 PM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/27/2020 5:18:29 PM
|
Project reopened for Review Comments
|
4/27/2020 5:17:18 PM
|
Submission Triaged
|
4/24/2020 8:44:06 AM
|
Submission received from Applicant
|
4/16/2020 6:31:18 AM
|
Project Closed
|
4/16/2020 6:31:18 AM
|
Project Approved: 4/16/2020
|
1/30/2020 5:12:06 PM
|
Submission request sent to Applicant
|
1/30/2020 5:08:08 PM
|
Project reopened for Review Comments
|
11/14/2018 12:00:00 AM
|
Project Closed
|
11/13/2018 1:39:45 PM
|
Project Approved: 11/13/2018
|
10/3/2018 5:16:03 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
9/25/2018 4:51:13 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/24/2018 2:54:26 PM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
9/24/2018 2:53:32 PM
|
Submission Triaged
|
9/24/2018 8:26:45 AM
|
Submission received from Applicant
|
9/20/2018 2:29:18 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
9/19/2018 11:22:03 AM
|
Submission request sent to Applicant
|
9/18/2018 10:46:33 AM
|
Submission request sent to Applicant
|
9/18/2018 10:11:32 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/18/2018 10:10:58 AM
|
Submission Triaged
|
9/18/2018 9:30:40 AM
|
Submission received from Applicant
|
9/13/2018 12:38:59 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/13/2018 9:44:36 AM
|
Submission request sent to Applicant
|
8/27/2018 10:04:30 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/27/2018 10:03:38 AM
|
Submission Triaged
|
8/24/2018 5:21:57 PM
|
Submission received from Applicant
|
8/23/2018 9:11:52 AM
|
Request for Review Comments returned by EPC Health Department
|
8/20/2018 3:05:48 PM
|
Submission request sent to Applicant
|
8/20/2018 3:03:20 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/16/2018 5:33:13 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/6/2018 9:29:46 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
8/6/2018 9:29:45 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/6/2018 9:29:12 AM
|
Submission Triaged
|
8/6/2018 7:59:23 AM
|
Submission received from Applicant
|
7/30/2018 11:35:30 AM
|
Submission request sent to Applicant
|
7/26/2018 9:03:13 AM
|
Submission request sent to Applicant
|
7/26/2018 8:54:35 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/26/2018 8:49:59 AM
|
Request for Review Comments email resent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
7/25/2018 5:11:27 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/24/2018 12:47:42 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/24/2018 9:52:51 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by on behalf of EPC Health Department
|
7/23/2018 11:29:18 AM
|
Submission request sent to Applicant
|
7/19/2018 2:39:33 PM
|
Submission Triaged
|
7/19/2018 1:01:35 PM
|
Submission received from Applicant
|
7/19/2018 12:05:19 PM
|
Submission request sent to Applicant
|
7/11/2018 4:13:14 PM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
7/11/2018 4:13:12 PM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/11/2018 4:12:50 PM
|
Submission Triaged
|
7/10/2018 6:13:07 PM
|
Submission received from Applicant
|
7/5/2018 1:29:26 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/5/2018 1:28:24 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/5/2018 1:19:49 PM
|
Request for Review Comments email resent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
7/3/2018 2:13:48 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/3/2018 2:05:40 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
7/3/2018 8:17:20 AM
|
Submission request sent to Applicant
|
6/26/2018 2:27:47 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/26/2018 12:38:09 PM
|
Submission request sent to Applicant
|
6/16/2018 7:05:39 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
6/16/2018 7:05:38 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
6/16/2018 7:05:36 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/16/2018 7:04:38 AM
|
Submission Triaged
|
6/15/2018 1:08:12 PM
|
Submission received from Applicant
|
6/11/2018 11:44:59 AM
|
Submission request sent to Applicant
|
6/4/2018 10:54:48 AM
|
Submission request sent to Applicant
|
6/4/2018 10:41:10 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/4/2018 10:40:09 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/4/2018 10:31:49 AM
|
Request for Review Comments email resent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
5/31/2018 3:54:51 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/18/2018 9:54:28 AM
|
Submission Triaged
|
5/18/2018 9:53:22 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/18/2018 9:02:33 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/17/2018 3:29:55 PM
|
Submission received from Applicant
|
5/17/2018 11:25:40 AM
|
Request for Review Comments returned by Parks Advisory Board
|
5/17/2018 11:24:22 AM
|
Request for Review Comments returned by EPC Parks Department
|
5/17/2018 7:33:12 AM
|
Submission request sent to Applicant
|
5/16/2018 10:58:20 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
5/15/2018 9:42:16 PM
|
Request for Review Comments returned by EPC Health Department
|
5/8/2018 12:46:54 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
5/1/2018 3:17:38 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/26/2018 10:49:01 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
4/26/2018 10:49:00 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
4/26/2018 10:48:59 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
4/26/2018 10:48:58 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
4/26/2018 10:48:56 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
4/26/2018 10:48:55 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Ross Williams on behalf of Parks Advisory Board
|
4/26/2018 10:48:54 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by on behalf of EPC Parks Department
|
4/26/2018 10:48:51 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by on behalf of EPC Health Department
|
4/26/2018 10:48:50 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Lori Seago on behalf of EPC County Attorney's Office
|
4/26/2018 10:48:48 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
4/26/2018 10:48:46 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/23/2018 4:10:00 PM
|
Submission Triaged
|
4/6/2018 4:27:04 PM
|
Submission received from Applicant
|
4/3/2018 5:13:11 PM
|
Submission request sent to Applicant
|
3/1/2018 1:59:22 PM
|
Submission request sent to Applicant
|
2/19/2018 1:07:26 PM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
2/13/2018 4:11:14 PM
|
Request for Review Comments email resent for Project Flying Horse North Final Plat, Filing 1 for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
2/12/2018 4:36:53 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
2/11/2018 3:49:22 PM
|
Request for Review Comments returned by Black Forest Trails Association
|
2/8/2018 2:53:23 PM
|
Submission request sent to Applicant
|
2/8/2018 2:45:25 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/8/2018 2:44:10 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/8/2018 2:43:09 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/8/2018 2:39:44 PM
|
Request for Review Comments email resent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
2/8/2018 11:36:02 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/8/2018 11:35:00 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/8/2018 11:04:22 AM
|
Request for Review Comments email resent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
2/7/2018 6:07:12 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/6/2018 2:42:46 PM
|
Request for Review Comments returned by EPC Parks Department
|
2/2/2018 10:56:40 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
1/31/2018 5:44:25 PM
|
Request for Review Comments returned by EPC Health Department
|
1/31/2018 4:21:57 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
1/30/2018 2:55:22 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/30/2018 2:08:41 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
1/30/2018 10:27:17 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/25/2018 3:37:18 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/18/2018 10:23:09 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/17/2018 12:58:07 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
1/16/2018 2:50:44 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
1/12/2018 2:16:31 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
1/11/2018 11:32:30 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/10/2018 7:50:57 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
1/10/2018 7:50:56 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
1/10/2018 7:50:55 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Cheryl Wangeman on behalf of Lewis Palmer 38
|
1/10/2018 7:50:54 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Daren Z. on behalf of High Forest Ranch
|
1/10/2018 7:50:53 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Pamela Davidson on behalf of El Paso County Conservation Dist
|
1/10/2018 7:50:52 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
|
1/10/2018 7:50:51 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Planning Dev on behalf of Colorado Springs Planning & Community Development
|
1/10/2018 7:50:50 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
|
1/10/2018 7:50:49 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Linda Warren on behalf of Cathedral Pines
|
1/10/2018 7:50:47 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Sebastian Schwender on behalf of Black Hills Energy-Aquila
|
1/10/2018 7:50:45 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
1/10/2018 7:50:43 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
1/10/2018 7:50:40 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Bryan Jack on behalf of Black Forest Fire Protection District
|
1/10/2018 7:50:38 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Dr. Mark Hatchell on behalf of Academy SD 20 Building Fund
|
1/10/2018 7:50:36 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
1/10/2018 7:50:35 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/10/2018 7:50:34 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
1/10/2018 7:50:33 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
1/10/2018 7:50:32 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Larry Long on behalf of Colorado State Forest Service
|
1/10/2018 7:50:31 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
1/10/2018 7:50:30 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
1/10/2018 7:50:29 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/10/2018 7:50:27 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
1/10/2018 7:50:26 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by John Hunyadi on behalf of Colorado Dam Safety Engineer
|
1/10/2018 7:50:25 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
1/10/2018 7:50:24 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
1/10/2018 7:50:23 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by on behalf of EPC Parks Department
|
1/10/2018 7:50:20 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by on behalf of EPC Health Department
|
1/10/2018 7:50:19 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/10/2018 7:50:18 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Edi Anderson on behalf of EPC County Attorney's Office
|
1/10/2018 7:50:17 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Nina Ruiz on behalf of PCD Project Manager
|
1/10/2018 7:50:15 AM
|
Request for Review Comments email sent for Project Flying Horse North Final Plat, Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/10/2018 7:38:35 AM
|
Fees paid: 1/10/2018 (Receipt: 1000396)
|
1/4/2018 5:19:53 PM
|
Payment Request sent: 1/4/2018
|
1/4/2018 5:19:49 PM
|
File # Assigned: SF181
|
1/4/2018 4:25:54 PM
|
Submission Triaged
|
1/4/2018 2:36:56 PM
|
Submission received from Applicant
|
1/4/2018 7:48:19 AM
|
Submission request sent to Applicant
|
12/15/2017 9:56:46 AM
|
Submission request sent to Applicant
|
12/15/2017 9:56:15 AM
|
Submission Triaged
|
12/15/2017 8:56:56 AM
|
Submission received from Applicant
|
11/7/2017 9:35:36 AM
|
Submission request sent to Applicant
|
7/24/2017 10:35:00 AM
|
Submission request sent to Applicant
|
7/24/2017 10:23:48 AM
|
Project Manager Assigned: Nina Ruiz
|
7/24/2017 10:23:47 AM
|
EA Assigned: EA-17-019
|
7/24/2017 10:23:47 AM
|
Project Created
|