Project Details

Search


File Number
SF192
Project Name
Trails at Aspen Ridge , Final Plat(Springs East at Waterview)
Description
Final Plat for 181 residential lots.
Location
The property is located at the southeast corner of Powers Boulevard and Bradley Road.
Parcels
5500000135 5500000135 5500000412 5500000412
Applicant
Matrix Design Group, Inc.
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 575-0100
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 575-0100
EA Number
EA-16-105
File Prefix
SF - Final Plat
Year
2019
Project Manager
Nina Ruiz
Status
Closed
Created
5/17/2017 2:11:30 PM

View: Review Comments


Approved Documents (8)

Link Document
View Deviation Request
View Construction Drawings (Plans/ Profiles)
View Grading & Erosion Control Plan (24 x 36)
View Drainage Report - Final
View Traffic Impact Study
View ESQCP
View Estimate of Guaranteed Funds
View Water Plans


Additional Documents (28)

Link Document Comment
View Property Posting
View Adjacent Property Notification
View Updated PC Hearing Notice
View Re posting
View NOTICE OF PUBLIC HEARING
View Planning Commission
View PC Approval Letter
View Notice of Public Hearing
View BoCC SR SF-19-002 with attachments BoCC SR SF-19-002 with attachments
View Recorded Resolution
View PC Resolution
View Recorded BoCC Res 20-158
View Approved Pavement Recommendations
View Recorded Subdivision Improvement Agreement
View Recorded Plat
View Recorded Maintenance Agreement
View Pavement-Addendum Approved
View Adjacent Owner notification and labels
View POND CERTIFICATION LETTER
View CDOT Permit Issuance Letter
View CDOT Executed Access Permit without NTP
View Recorded Final Plat
View Record Drawings Certification Letter - West Pond Sand Filter
View Record Drawings Certification Letter - Geotech
View Record Drawings Certification Letter - Roadway & Storm
View Record Drawings - Road & Storm Plans
View Record Drawings West Pond SF Build
View 24-120 Trails at Aspen Ridge Filing No. 1 Legach Hill Only PA


Review Documents (62)

Link Document Date
View Adjacent Property Owner Notification 1/15/2019 4:23:54 PM
View Application/Petition Form 12/14/2018 1:18:42 PM
View Legal Description 12/20/2018 4:20:19 PM
View Letter of Intent 1/15/2019 4:24:08 PM
View Vicinity/Location Map 12/26/2018 11:56:32 AM
View Erosion and Stormwater Quality Control Permit (ESQCP) 9/30/2019 4:27:57 PM
View Grading & Erosion Control checklist 9/30/2019 4:25:56 PM
View Mineral Rights Certification 12/20/2018 4:20:20 PM
View MS4 Post Construction Form 1/7/2020 4:37:59 PM
View PBMP Applicability Form 1/7/2020 7:09:21 AM
View PDB/BMP Operations & Maintenance Manual 9/30/2019 4:28:26 PM
View State Dam Verification 9/30/2019 4:07:09 PM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 2/20/2020 8:44:22 PM
View SWMP checklist 1/7/2020 7:09:20 AM
View Construction Drawings (Plans/ Profiles) 1/24/2020 10:59:54 AM
View Final Plat Drawings (24" x 36") 2/20/2020 8:44:21 PM
View Grading & Erosion Control Plan (24 x 36) 1/7/2020 5:15:47 PM
View Storm Water Management Plan (SWMP) 7/1/2019 3:54:16 PM
View Electric Provider Commitment Letter 12/14/2018 1:18:44 PM
View Fire Commitment Letter 12/18/2018 3:15:59 PM
View Natural Gas Commitment Letter 12/14/2018 1:18:45 PM
View Drainage Report - Final 1/8/2020 9:54:06 AM
View Fire Protection Report 12/14/2018 1:18:44 PM
View Natural Features Report 12/14/2018 1:18:45 PM
View Noxious Weed Management Plan 12/14/2018 1:18:46 PM
View Soils & Geology Report 10/1/2019 12:58:18 PM
View Subdivision Summary Sheet 12/14/2018 1:18:46 PM
View Traffic Impact Study 1/7/2020 4:43:19 PM
View Wastewater Treatment Report 7/1/2019 10:29:04 AM
View Bradley Road intersection CDs 7/2/2019 2:54:49 PM
View CAD Files 2/21/2020 2:30:19 PM
View Closures Sheet (Survey) 12/26/2018 11:51:28 AM
View Commitment letter from waste water service provider 7/1/2019 10:29:02 AM
View Commitment letter from water service provider 7/1/2019 10:29:01 AM
View Drainage deviation request 1/7/2020 7:09:17 AM
View Drainage Deviation Responses 1/7/2020 5:22:38 PM
View ESQCP 1/15/2019 4:27:46 PM
View ESQCP 1/15/2019 4:24:11 PM
View Estimate of Guaranteed Funds 1/24/2020 2:08:06 PM
View FAE Responses 1/7/2020 5:22:38 PM
View Final Plat 1/7/2020 4:42:13 PM
View GEC Responses 1/7/2020 5:22:37 PM
View Legacy Hill Deviation 1/7/2020 4:39:25 PM
View Legacy Hill Deviation 1/7/2020 4:39:26 PM
View Legal Description 2/20/2020 8:44:22 PM
View Off-Site Grading Permission 10/4/2019 11:41:26 AM
View Pond Agreement Form 3/31/2020 11:50:40 AM
View R&S Responses 1/7/2020 5:22:33 PM
View Security Fire Letter 1/7/2020 4:34:56 PM
View Subdivision Improvement Agreement 5/28/2020 8:13:03 AM
View SWMP Checklist Responses 1/7/2020 5:22:39 PM
View SWMP Report 1/7/2020 4:42:11 PM
View TIA Response to Comments 10/16/2019 8:59:13 AM
View TIS Response to Comments 7/11/2019 8:06:17 AM
View Title Commitment 1/15/2019 4:24:09 PM
View Traffic Design Support 1/8/2020 9:57:00 AM
View Updated Water- Wastewater 9/30/2019 4:07:14 PM
View Wastewater Report 9/30/2019 4:42:26 PM
View Water Plans 9/3/2024 4:37:07 PM
View Water Quality Report 7/1/2019 10:29:42 AM
View Water Supply Summary 9/30/2019 4:42:25 PM
View Word Doc for E911 7/1/2019 3:53:44 PM



Events (207)

Date Comment
5/29/2020 7:45:44 AM Submission Triaged
5/28/2020 8:13:06 AM Submission received from Applicant
4/30/2020 10:41:49 AM Project Closed
4/30/2020 10:41:49 AM Project Approved: 4/30/2020
4/2/2020 3:46:18 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
3/12/2020 12:39:31 PM Submission request sent to Applicant
3/11/2020 2:15:07 PM Request for Review Comments returned by County Attorney - Development Review
3/4/2020 7:10:12 AM Request for Review Comments returned by PCD Engineering Division
3/3/2020 4:55:43 PM Request for Review Comments returned by Colorado Springs Planning & Community Development
2/26/2020 11:26:54 AM Request for Review Comments returned by EPC County Attorney's Office
2/25/2020 9:15:05 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/25/2020 9:14:30 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Edi Anderson on behalf of EPC County Attorney's Office
2/25/2020 9:14:29 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Lori Seago on behalf of County Attorney - Development Review
2/25/2020 9:11:02 AM Submission Triaged
2/21/2020 2:34:59 PM Submission received from Applicant
2/18/2020 4:02:07 PM Submission request sent to Applicant
2/18/2020 10:32:28 AM Request for Review Comments returned by PCD Project Manager
2/18/2020 10:30:18 AM Request for Review Comments email resent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
2/14/2020 3:28:36 PM Request for Review Comments returned by Parks Advisory Board
2/14/2020 3:26:40 PM Request for Review Comments returned by EPC Parks Department
2/13/2020 1:49:47 PM Request for Review Comments returned by PCD Engineering Division
2/11/2020 7:20:50 AM Request for Review Comments returned by PCD Project Manager
2/6/2020 8:51:37 AM Request for Review Comments returned by Pikes Peak Regional Building Department
1/31/2020 6:00:34 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
1/31/2020 6:00:27 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/31/2020 5:59:01 AM Submission Triaged
1/29/2020 11:15:51 AM Submission received from Applicant
1/27/2020 8:51:19 AM Request for Review Comments returned by EPC County Attorney's Office
1/27/2020 8:23:51 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Edi Anderson on behalf of EPC County Attorney's Office
1/23/2020 2:25:14 PM Request for Review Comments returned by EPC Environmental Services
1/23/2020 7:38:02 AM Submission request sent to Applicant
1/23/2020 7:36:26 AM Request for Review Comments returned by PCD Project Manager
1/23/2020 7:33:39 AM Request for Review Comments email resent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
1/22/2020 5:02:11 PM Request for Review Comments returned by PCD Engineering Division
1/22/2020 7:49:10 AM Request for Review Comments returned by Colorado State Forest Service
1/16/2020 11:27:05 AM Request for Review Comments returned by PCD Project Manager
1/11/2020 9:12:49 AM Request for Review Comments returned by EPC County Attorney's Office
1/9/2020 9:26:30 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
1/9/2020 8:03:15 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
1/9/2020 8:03:05 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/8/2020 5:34:37 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
1/8/2020 5:34:35 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
1/8/2020 5:34:33 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Larry Long on behalf of Colorado State Forest Service
1/8/2020 5:34:32 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Melissa Peterson on behalf of Colorado Division of Water Resources
1/8/2020 5:34:31 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of EPC Parks Department
1/8/2020 5:34:30 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Kathy Andrew on behalf of EPC Environmental Services
1/8/2020 5:34:29 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
1/8/2020 5:34:27 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/8/2020 5:30:19 PM Submission Triaged
1/8/2020 3:55:35 PM Submission received from Applicant
1/7/2020 1:01:13 PM Submission request sent to Applicant
1/7/2020 12:49:01 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of Parks Advisory Board
1/4/2020 8:30:39 AM Request for Review Comments returned by EPC Health Department
11/25/2019 12:55:58 PM Submission request sent to Applicant
11/25/2019 12:50:03 PM Request for Review Comments returned by PCD Project Manager
11/25/2019 12:22:40 PM Request for Review Comments email resent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
11/22/2019 2:18:58 PM Request for Review Comments returned by Parks Advisory Board
11/20/2019 5:04:49 PM Request for Review Comments returned by PCD Engineering Division
11/19/2019 7:10:08 AM Request for Review Comments returned by PCD Project Manager
11/18/2019 9:36:33 AM Request for Review Comments returned by Colorado Division of Water Resources
11/18/2019 9:34:40 AM Request for Review Comments returned by Colorado Division of Water Resources
11/15/2019 8:54:42 AM Request for Review Comments returned by Pikes Peak Regional Building Department
11/14/2019 12:23:28 PM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
11/7/2019 9:49:51 AM Request for Review Comments returned by EPC Parks Department
10/22/2019 2:46:24 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/22/2019 12:53:15 PM Request for Review Comments returned by Colorado State Forest Service
10/22/2019 9:35:53 AM Request for Review Comments returned by EPC Environmental Services
10/18/2019 8:09:08 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/17/2019 8:08:45 AM Request for Review Comments returned by Schriever AFB
10/16/2019 6:41:05 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Darren Horstmeier on behalf of Schriever AFB
10/16/2019 6:41:04 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/16/2019 6:41:03 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
10/16/2019 6:41:02 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
10/16/2019 6:41:00 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/16/2019 6:40:59 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Larry Long on behalf of Colorado State Forest Service
10/16/2019 6:40:57 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
10/16/2019 6:40:56 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of Parks Advisory Board
10/16/2019 6:40:55 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of EPC Parks Department
10/16/2019 6:40:51 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of EPC Health Department
10/16/2019 6:40:50 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Kathy Andrew on behalf of EPC Environmental Services
10/16/2019 6:40:49 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Edi Anderson on behalf of EPC County Attorney's Office
10/16/2019 6:40:48 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
10/16/2019 6:40:47 PM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/16/2019 6:37:55 PM Submission Triaged
10/16/2019 8:59:26 AM Submission received from Applicant
10/1/2019 4:25:11 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
9/4/2019 3:10:29 PM Request for Review Comments returned by EPC Health Department
8/8/2019 2:58:47 PM Submission request sent to Applicant
8/8/2019 2:54:05 PM Request for Review Comments returned by PCD Project Manager
8/8/2019 2:46:26 PM Request for Review Comments email resent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
8/7/2019 5:36:26 PM Request for Review Comments returned by PCD Engineering Division
8/5/2019 10:58:05 AM Request for Review Comments returned by Pikes Peak Regional Building Department
8/1/2019 8:42:34 AM Request for Review Comments returned by PCD Project Manager
7/23/2019 9:44:58 AM Submission request sent to Applicant
7/22/2019 10:38:26 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
7/21/2019 12:47:09 PM Request for Review Comments returned by EPC County Attorney's Office
7/21/2019 12:46:21 PM Request for Review Comments returned by EPC County Attorney's Office
7/16/2019 2:46:22 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/15/2019 5:10:03 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
7/15/2019 5:09:59 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of EPC Health Department
7/15/2019 5:08:45 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/15/2019 5:08:44 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
7/15/2019 5:08:42 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
7/15/2019 5:08:41 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
7/15/2019 5:08:39 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/15/2019 5:06:02 AM Submission Triaged
7/11/2019 8:06:24 AM Submission received from Applicant
6/18/2019 7:26:49 AM Submission request sent to Applicant
3/15/2019 9:23:59 AM Request for Review Comments returned by PCD Project Manager
3/15/2019 9:22:55 AM Request for Review Comments email resent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
3/12/2019 1:35:36 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
3/12/2019 1:23:36 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
3/7/2019 9:48:00 AM Request for Review Comments returned by EPC Parks Department
3/7/2019 9:47:34 AM Request for Review Comments returned by EPC Parks Department
2/28/2019 9:15:26 AM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
2/27/2019 5:41:58 PM Request for Review Comments returned by EPC Health Department
2/27/2019 5:38:48 PM Request for Review Comments returned by EPC Health Department
2/27/2019 7:45:13 AM Submission request sent to Applicant
2/27/2019 7:44:18 AM Request for Review Comments returned by PCD Project Manager
2/27/2019 7:38:10 AM Submission request sent to Applicant
2/27/2019 7:34:25 AM Request for Review Comments returned by PCD Project Manager
2/26/2019 6:13:58 PM Request for Review Comments returned by PCD Engineering Division
2/25/2019 3:26:22 PM Request for Review Comments returned by PCD Engineering Division
2/22/2019 2:57:33 PM Request for Review Comments returned by Pikes Peak Regional Building Department
2/22/2019 2:37:40 PM Request for Review Comments returned by Pikes Peak Regional Building Department
2/22/2019 8:46:46 AM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
2/19/2019 2:59:15 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/15/2019 8:52:38 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
2/15/2019 8:51:51 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
2/14/2019 10:25:34 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/8/2019 3:51:44 PM Request for Review Comments returned by Schriever AFB
2/8/2019 3:46:28 PM Request for Review Comments returned by Schriever AFB
2/8/2019 1:19:35 PM Request for Review Comments returned by EPC Environmental Services
2/8/2019 1:18:51 PM Request for Review Comments returned by EPC Environmental Services
2/7/2019 8:05:10 AM Request for Review Comments returned by Colorado State Forest Service
2/7/2019 8:04:38 AM Request for Review Comments returned by Colorado State Forest Service
2/4/2019 11:03:57 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Brandon Bernard on behalf of Widefield Water & San
2/4/2019 11:03:54 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Dennis Neal on behalf of Widefield SD 3
2/4/2019 11:03:51 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Peter Susemihl on behalf of Waterview 1 Metro
2/4/2019 11:03:48 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
2/4/2019 11:03:45 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of Security Fire Protection District
2/4/2019 11:03:42 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Darren Horstmeier on behalf of Schriever AFB
2/4/2019 11:03:39 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Glenn Messke on behalf of Peterson AFB
2/4/2019 11:03:37 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
2/4/2019 11:03:35 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/4/2019 11:03:33 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Planning Dev on behalf of Colorado Springs Planning & Community Development
2/4/2019 11:03:31 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
2/4/2019 11:03:28 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
2/4/2019 11:03:26 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
2/4/2019 11:03:24 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
2/4/2019 11:03:20 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Steve Phillips on behalf of Federal Aviation Administration (FAA)
2/4/2019 11:03:17 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Justin Osborne on behalf of Colorado State Land Board
2/4/2019 11:03:14 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Larry Long on behalf of Colorado State Forest Service
2/4/2019 11:03:14 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Brandon Bernard on behalf of Widefield Water & San
2/4/2019 11:03:11 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
2/4/2019 11:03:11 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Dennis Neal on behalf of Widefield SD 3
2/4/2019 11:03:08 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Peter Susemihl on behalf of Waterview 1 Metro
2/4/2019 11:03:08 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Melissa Peterson on behalf of Colorado Division of Water Resources
2/4/2019 11:03:05 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
2/4/2019 11:03:04 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
2/4/2019 11:03:02 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of Security Fire Protection District
2/4/2019 11:03:02 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Dan Ausec on behalf of EPC Sheriff's Department
2/4/2019 11:03:00 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Darren Horstmeier on behalf of Schriever AFB
2/4/2019 11:02:59 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
2/4/2019 11:02:58 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Glenn Messke on behalf of Peterson AFB
2/4/2019 11:02:57 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of EPC Parks Department
2/4/2019 11:02:56 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
2/4/2019 11:02:53 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/4/2019 11:02:52 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of EPC Health Department
2/4/2019 11:02:51 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Planning Dev on behalf of Colorado Springs Planning & Community Development
2/4/2019 11:02:50 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Kathy Andrew on behalf of EPC Environmental Services
2/4/2019 11:02:49 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
2/4/2019 11:02:47 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Edi Anderson on behalf of EPC County Attorney's Office
2/4/2019 11:02:45 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
2/4/2019 11:02:45 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Steve Schleiker on behalf of Assessor's Office
2/4/2019 11:02:43 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
2/4/2019 11:02:41 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
2/4/2019 11:02:40 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
2/4/2019 11:02:35 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/4/2019 11:02:35 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Steve Phillips on behalf of Federal Aviation Administration (FAA)
2/4/2019 11:02:31 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Justin Osborne on behalf of Colorado State Land Board
2/4/2019 11:02:28 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Larry Long on behalf of Colorado State Forest Service
2/4/2019 11:02:25 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
2/4/2019 11:02:22 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Melissa Peterson on behalf of Colorado Division of Water Resources
2/4/2019 11:02:18 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
2/4/2019 11:02:15 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Dan Ausec on behalf of EPC Sheriff's Department
2/4/2019 11:02:12 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
2/4/2019 11:02:07 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of EPC Parks Department
2/4/2019 11:02:00 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by on behalf of EPC Health Department
2/4/2019 11:01:57 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Kathy Andrew on behalf of EPC Environmental Services
2/4/2019 11:01:55 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Edi Anderson on behalf of EPC County Attorney's Office
2/4/2019 11:01:53 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Steve Schleiker on behalf of Assessor's Office
2/4/2019 11:01:51 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Nina Ruiz on behalf of PCD Project Manager
2/4/2019 11:01:47 AM Request for Review Comments email sent for Project Trails at Aspen Ridge , Final Plat(Springs East at Waterview) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/4/2019 10:28:22 AM Fees paid: 2/4/2019 (Receipt: 1001220)
1/23/2019 5:12:52 PM Payment Request sent: 1/23/2019
1/23/2019 5:12:47 PM File # Assigned: SF192
1/17/2019 3:02:23 PM Submission Triaged
1/17/2019 12:48:18 PM Submission received from Applicant
1/16/2019 10:26:49 AM Submission request sent to Applicant
1/16/2019 10:26:38 AM Submission Triaged
1/15/2019 4:28:03 PM Submission received from Applicant
12/26/2018 3:39:42 PM Submission request sent to Applicant
5/17/2017 2:14:13 PM Submission request sent to Applicant
5/17/2017 2:11:49 PM Project Manager Assigned: Nina Ruiz
5/17/2017 2:11:49 PM EA Assigned: EA-16-105
5/17/2017 2:11:49 PM Project Created