Project Details

Search


File Number
SP17007
Project Name
Abert Ranch Preliminary Plan
Description
Applicant requests approval for a preliminary plan to include 10 single-family residential lots. Parcel No. 61000-00-464
Location
southwest of the Steppler Road and Silver Nell Drive intersection
Parcels
6100000464 6100000464
Applicant
Jerome W. Hannigan and Associates, Inc.
Jerry Hannigan ( hannigan.and.assoc@gmail.com )
(719) 481-8292
Jerry Hannigan ( hannigan.and.assoc@gmail.com )
(719) 481-8292
EA Number
EA1642
File Prefix
SP - Preliminary Plan
Year
2017
Project Manager
Kari Parsons
Status
Closed
Created
5/1/2017 1:23:33 PM

View: Review Comments


Approved Documents (2)

Link Document
View Drainage Report - Preliminary
View Traffic Impact Study


Additional Documents (11)

Link Document Comment
View Neighborhood concerns
View Page 1 Applicants letter to adjacent property
View Page 2 Applicants letter to adjacent property
View West East Cherry Creek Basin Map
View Hank Worley Water letter to Cole, CAO
View SEO Updated Letter
View Deviation Approved
View PC Staff Report
View Adjacent Property Opposition Letter
View PC Approval Letter
View BoCC Resolution


Review Documents (38)

Link Document Date
View Adjacent Property Owner Notification 7/22/2017 2:57:21 PM
View Application/Petition Form 5/29/2017 9:49:56 AM
View Legal Description 5/16/2017 3:42:14 PM
View Letter of Intent 8/5/2019 4:23:11 PM
View Vicinity/Location Map 5/16/2017 3:42:15 PM
View Additional Exhibits 7/25/2017 8:59:49 AM
View Applicant Comment Response Letter 12/29/2017 10:36:37 AM
View Colorado Geological Survey Receipt 6/12/2017 7:31:04 PM
View Mineral Rights Certification 8/2/2017 12:28:16 PM
View Wildland Fire Risk and Hazard Severity Analysis 7/25/2017 8:57:14 AM
View Grading & Erosion Control Plan (24 x 36) 8/29/2019 9:08:07 AM
View Predevelopment (Early) Grading Request 12/28/2017 4:10:17 PM
View Preliminary Plan Drawings (24" x 36") 8/5/2019 4:10:43 PM
View Storm Water Management Plan (SWMP) 5/16/2017 2:35:01 PM
View Electric Provider Commitment Letter 5/16/2017 2:03:01 PM
View Fire Commitment Letter 5/17/2017 12:03:46 PM
View Natural Gas Commitment Letter 5/25/2017 12:03:10 PM
View Drainage Report - Preliminary 7/12/2019 5:21:35 PM
View Fire Protection Report 7/20/2017 5:38:27 PM
View Natural Landforms, Vegetation, Riparian Analysis 5/16/2017 2:27:46 PM
View Soils & Geology Report 5/16/2017 2:27:43 PM
View Subdivision Summary Sheet 5/18/2017 2:35:52 PM
View Traffic Impact Study 2/26/2019 9:23:41 AM
View Wastewater Disposal Report 5/16/2017 2:27:44 PM
View Wetland Impact Letter 5/16/2017 2:27:45 PM
View Colorado Ground Water Determination of Water Rights (signed) 5/16/2017 2:03:01 PM
View Signed court decrees, including augmentation plans 5/16/2017 2:03:02 PM
View Water Quality Report 7/30/2019 8:22:07 PM
View Water Resources Report 7/17/2017 12:23:56 PM
View Water Supply Information Summary 8/3/2017 7:00:48 AM
View Well Permits (if water source is wells) 8/3/2017 7:31:33 AM
View Deviation Request 7/30/2019 8:41:11 PM
View Erosion & Sediment Quality Control Plan (ESQCP) 4/6/2019 10:08:30 AM
View Financial Assurance Forms 2/19/2019 1:39:44 PM
View GEC Plan 7/12/2019 8:55:17 PM
View LSC Commnts 2/26/2019 9:23:43 AM
View Response Letter 7/9/2019 2:00:13 PM
View Title Commitment 7/22/2017 2:36:12 PM



Events (181)

Date Comment
11/14/2019 8:56:08 AM Project Closed
11/14/2019 8:56:08 AM Project Approved: 11/14/2019
9/4/2019 5:14:55 PM Request for Review Comments returned by PCD Project Manager
9/4/2019 5:05:06 PM Request for Review Comments returned by PCD Engineering Division
8/29/2019 10:19:07 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
8/29/2019 10:19:05 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/29/2019 10:18:18 AM Submission Triaged
8/29/2019 9:08:19 AM Submission received from Applicant
8/29/2019 7:44:16 AM Request for Review Comments returned by EPC Health Department
8/26/2019 9:59:59 AM Submission request sent to Applicant
8/26/2019 9:44:43 AM Request for Review Comments returned by PCD Engineering Division
8/21/2019 5:14:15 PM Request for Review Comments returned by PCD Project Manager
8/19/2019 12:33:03 PM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Health Department
8/12/2019 7:50:54 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
8/12/2019 7:50:52 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/12/2019 7:47:31 AM Submission Triaged
8/5/2019 4:23:34 PM Submission received from Applicant
7/30/2019 8:05:36 AM Submission request sent to Applicant
7/30/2019 8:04:23 AM Request for Review Comments returned by PCD Project Manager
7/30/2019 8:02:33 AM Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
7/30/2019 7:52:35 AM Submission request sent to Applicant
7/30/2019 7:50:38 AM Request for Review Comments returned by PCD Project Manager
7/29/2019 10:22:34 AM Request for Review Comments returned by PCD Engineering Division
7/15/2019 8:21:25 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
7/15/2019 8:21:23 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/15/2019 8:20:43 AM Submission Triaged
7/12/2019 8:55:57 PM Submission received from Applicant
5/27/2019 7:59:58 AM Request for Review Comments returned by EPC Health Department
5/20/2019 3:14:06 PM Submission request sent to Applicant
5/9/2019 7:17:13 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
5/3/2019 11:34:03 AM Request for Review Comments returned by Parks Advisory Board
5/3/2019 11:32:27 AM Request for Review Comments returned by EPC Parks Department
5/3/2019 10:41:14 AM Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
4/29/2019 11:59:48 PM Request for Review Comments returned by Black Forest Trails Association
4/29/2019 11:13:05 AM Request for Review Comments returned by Colorado Geological Survey
4/25/2019 11:13:58 AM Request for Review Comments returned by Pikes Peak Regional Building Department
4/25/2019 11:04:58 AM Request for Review Comments returned by El Paso County Conservation Dist
4/24/2019 4:35:05 PM Submission request sent to Applicant
4/24/2019 4:32:33 PM Request for Review Comments returned by PCD Project Manager
4/24/2019 4:20:07 PM Request for Review Comments returned by PCD Engineering Division
4/24/2019 3:44:17 PM Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/24/2019 1:32:39 PM Request for Review Comments returned by PCD Engineering Division
4/18/2019 2:02:01 PM Request for Review Comments returned by EPC Environmental Services
4/16/2019 2:24:11 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
4/11/2019 11:00:38 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
4/11/2019 10:37:28 AM Request for Review Comments returned by Colorado State Forest Service
4/11/2019 10:17:54 AM Request for Review Comments returned by Black Forest Land Use Committee
4/8/2019 12:24:24 PM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
4/8/2019 10:22:13 AM Request for Review Comments returned by Lewis Palmer 38
4/8/2019 9:36:21 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
4/8/2019 9:36:20 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
4/8/2019 9:36:19 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
4/8/2019 9:36:17 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Wangeman on behalf of Lewis Palmer 38
4/8/2019 9:36:16 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Pamela Davison on behalf of El Paso County Conservation Dist
4/8/2019 9:36:15 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
4/8/2019 9:36:13 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
4/8/2019 9:36:12 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
4/8/2019 9:36:11 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
4/8/2019 9:36:09 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
4/8/2019 9:36:08 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
4/8/2019 9:36:07 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of Parks Advisory Board
4/8/2019 9:36:06 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Parks Department
4/8/2019 9:36:03 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Health Department
4/8/2019 9:36:02 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
4/8/2019 9:36:01 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
4/8/2019 9:35:59 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/8/2019 9:27:09 AM Submission Triaged
4/6/2019 10:08:57 AM Submission received from Applicant
2/15/2019 2:14:51 PM Request for Review Comments returned by Lewis Palmer 38
9/24/2018 10:21:00 AM Submission request sent to Applicant
7/25/2018 4:51:41 PM Request for Review Comments returned by EPC County Attorney's Office
4/24/2018 9:50:48 AM Request for Review Comments returned by Colorado Division of Water Resources
3/27/2018 4:57:53 PM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Ioana Comaniciu on behalf of Colorado Division of Water Resources
3/27/2018 4:57:51 PM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/15/2018 6:37:42 AM Request for Review Comments returned by Colorado Division of Water Resources
2/12/2018 4:38:40 AM Request for Review Comments returned by Black Forest Land Use Committee
2/7/2018 3:12:56 PM Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
2/6/2018 8:33:54 AM Request for Review Comments returned by EPC Health Department
2/5/2018 10:09:38 AM Request for Review Comments returned by Pikes Peak Regional Building Department
2/1/2018 10:08:16 AM Request for Review Comments returned by Colorado Geological Survey
1/31/2018 1:38:46 PM Submission request sent to Applicant
1/31/2018 1:23:04 PM Request for Review Comments returned by PCD Project Manager
1/31/2018 1:21:32 PM Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
1/31/2018 1:20:10 PM Request for Review Comments returned by PCD Project Manager
1/31/2018 1:18:27 PM Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
1/31/2018 1:17:55 PM Request for Review Comments returned by PCD Project Manager
1/31/2018 1:15:18 PM Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
1/31/2018 1:14:27 PM Request for Review Comments returned by PCD Project Manager
1/31/2018 1:00:33 PM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
1/30/2018 2:04:27 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
1/30/2018 12:15:53 PM Submission request sent to Applicant
1/30/2018 12:12:03 PM Request for Review Comments returned by PCD Project Manager
1/24/2018 11:08:17 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
1/23/2018 5:12:14 PM Request for Review Comments returned by PCD Engineering Division
1/23/2018 4:56:10 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
1/22/2018 11:55:39 AM Request for Review Comments returned by EPC Parks Department
1/19/2018 10:20:01 AM Request for Review Comments returned by EPC Environmental Services
1/16/2018 6:42:59 PM Request for Review Comments returned by Black Forest Trails Association
1/16/2018 3:02:38 PM Request for Review Comments returned by El Paso County Conservation Dist
1/16/2018 9:29:47 AM Request for Review Comments returned by Colorado State Forest Service
1/16/2018 9:02:48 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
1/16/2018 9:02:48 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
1/16/2018 9:02:47 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
1/16/2018 9:02:45 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Wangeman on behalf of Lewis Palmer 38
1/16/2018 9:02:44 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Pamela Davidson on behalf of El Paso County Conservation Dist
1/16/2018 9:02:43 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
1/16/2018 9:02:42 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
1/16/2018 9:02:41 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
1/16/2018 9:02:39 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
1/16/2018 9:02:38 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
1/16/2018 9:02:37 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
1/16/2018 9:02:36 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Ioana Comaniciu on behalf of Colorado Division of Water Resources
1/16/2018 9:02:35 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Parks Department
1/16/2018 9:02:32 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Health Department
1/16/2018 9:02:31 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
1/16/2018 9:02:30 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
1/16/2018 9:02:28 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/16/2018 8:57:50 AM Submission Triaged
1/11/2018 8:46:00 PM Submission received from Applicant
1/4/2018 9:57:30 AM Request for Review Comments returned by Lewis Palmer 38
10/2/2017 4:06:55 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
9/20/2017 3:09:55 PM Request for Review Comments returned by EPC Health Department
9/15/2017 4:01:26 PM Request for Review Comments returned by EPC Parks Department
9/14/2017 8:49:23 AM Request for Review Comments returned by Colorado Division of Water Resources
9/12/2017 12:41:41 PM Request for Review Comments returned by Colorado Geological Survey
9/8/2017 3:58:18 PM Request for Review Comments returned by Pikes Peak Regional Building Department
9/7/2017 8:31:13 AM Submission request sent to Applicant
9/7/2017 8:25:59 AM Request for Review Comments returned by PCD Project Manager
9/6/2017 8:52:47 AM Request for Review Comments returned by EPC Parks Department
8/29/2017 2:46:58 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
8/29/2017 1:34:54 PM Request for Review Comments returned by Colorado State Forest Service
8/28/2017 2:29:05 PM Request for Review Comments returned by PCD Engineering Division
8/25/2017 10:40:35 AM Request for Review Comments returned by Colorado Parks and Wildlife
8/24/2017 3:04:44 PM Request for Review Comments returned by El Paso County Conservation Dist
8/23/2017 10:08:37 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
8/23/2017 9:11:31 AM Request for Review Comments returned by EPC Environmental Services
8/22/2017 8:48:40 AM Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
8/21/2017 7:17:19 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
8/21/2017 7:17:18 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
8/21/2017 7:17:17 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
8/21/2017 7:17:16 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Wangeman on behalf of Lewis Palmer 38
8/21/2017 7:17:15 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Pamela Davidson on behalf of El Paso County Conservation Dist
8/21/2017 7:17:14 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
8/21/2017 7:17:13 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Sebastian Schwender on behalf of Black Hills Energy-Aquila
8/21/2017 7:17:12 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
8/21/2017 7:17:11 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
8/21/2017 7:17:10 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
8/21/2017 7:17:09 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
8/21/2017 7:17:08 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
8/21/2017 7:17:07 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
8/21/2017 7:17:06 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
8/21/2017 7:17:05 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
8/21/2017 7:17:04 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
8/21/2017 7:17:03 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Melissa Peterson on behalf of Colorado Division of Water Resources
8/21/2017 7:17:02 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Parks Department
8/21/2017 7:17:01 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Administration Christine Juarez on behalf of EPC Health Department
8/21/2017 7:17:00 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Program Supervisor Joe Lomeli on behalf of EPC Health Department
8/21/2017 7:16:59 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Health Department
8/21/2017 7:16:58 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
8/21/2017 7:16:57 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
8/21/2017 7:16:54 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
8/21/2017 7:16:53 AM Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/17/2017 4:50:45 PM Fees paid: 8/17/2017 (Receipt: 1000179)
8/3/2017 10:15:34 AM File # Assigned: SP17007
8/3/2017 10:02:04 AM Submission Triaged
8/3/2017 7:57:41 AM Submission received from Applicant
8/3/2017 7:50:32 AM Submission request sent to Applicant
8/2/2017 2:23:33 PM Submission request sent to Applicant
8/2/2017 2:21:55 PM Submission Triaged
8/2/2017 12:33:48 PM Submission received from Applicant
7/25/2017 10:15:49 AM Submission request sent to Applicant
7/25/2017 10:15:16 AM Submission Triaged
7/25/2017 9:01:46 AM Submission received from Applicant
7/24/2017 7:57:20 AM Submission request sent to Applicant
5/11/2017 1:00:11 PM Submission request sent to Applicant
5/11/2017 12:59:43 PM Submission request sent to Applicant
5/11/2017 12:59:12 PM Submission request sent to Applicant
5/1/2017 1:46:49 PM Submission request sent to Applicant
5/1/2017 1:23:46 PM Project Manager Assigned: Kari Parsons
5/1/2017 1:23:46 PM EA Assigned: EA1642
5/1/2017 1:23:46 PM Project Created