11/14/2019 8:56:08 AM
|
Project Closed
|
11/14/2019 8:56:08 AM
|
Project Approved: 11/14/2019
|
9/4/2019 5:14:55 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/4/2019 5:05:06 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/29/2019 10:19:07 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
8/29/2019 10:19:05 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/29/2019 10:18:18 AM
|
Submission Triaged
|
8/29/2019 9:08:19 AM
|
Submission received from Applicant
|
8/29/2019 7:44:16 AM
|
Request for Review Comments returned by EPC Health Department
|
8/26/2019 9:59:59 AM
|
Submission request sent to Applicant
|
8/26/2019 9:44:43 AM
|
Request for Review Comments returned by PCD Engineering Division
|
8/21/2019 5:14:15 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/19/2019 12:33:03 PM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Health Department
|
8/12/2019 7:50:54 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
8/12/2019 7:50:52 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/12/2019 7:47:31 AM
|
Submission Triaged
|
8/5/2019 4:23:34 PM
|
Submission received from Applicant
|
7/30/2019 8:05:36 AM
|
Submission request sent to Applicant
|
7/30/2019 8:04:23 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/30/2019 8:02:33 AM
|
Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
7/30/2019 7:52:35 AM
|
Submission request sent to Applicant
|
7/30/2019 7:50:38 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/29/2019 10:22:34 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/15/2019 8:21:25 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
7/15/2019 8:21:23 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/15/2019 8:20:43 AM
|
Submission Triaged
|
7/12/2019 8:55:57 PM
|
Submission received from Applicant
|
5/27/2019 7:59:58 AM
|
Request for Review Comments returned by EPC Health Department
|
5/20/2019 3:14:06 PM
|
Submission request sent to Applicant
|
5/9/2019 7:17:13 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
5/3/2019 11:34:03 AM
|
Request for Review Comments returned by Parks Advisory Board
|
5/3/2019 11:32:27 AM
|
Request for Review Comments returned by EPC Parks Department
|
5/3/2019 10:41:14 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
4/29/2019 11:59:48 PM
|
Request for Review Comments returned by Black Forest Trails Association
|
4/29/2019 11:13:05 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/25/2019 11:13:58 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/25/2019 11:04:58 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
4/24/2019 4:35:05 PM
|
Submission request sent to Applicant
|
4/24/2019 4:32:33 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/24/2019 4:20:07 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/24/2019 3:44:17 PM
|
Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/24/2019 1:32:39 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/18/2019 2:02:01 PM
|
Request for Review Comments returned by EPC Environmental Services
|
4/16/2019 2:24:11 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
4/11/2019 11:00:38 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/11/2019 10:37:28 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
4/11/2019 10:17:54 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
4/8/2019 12:24:24 PM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
4/8/2019 10:22:13 AM
|
Request for Review Comments returned by Lewis Palmer 38
|
4/8/2019 9:36:21 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
4/8/2019 9:36:20 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
4/8/2019 9:36:19 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
4/8/2019 9:36:17 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Wangeman on behalf of Lewis Palmer 38
|
4/8/2019 9:36:16 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Pamela Davison on behalf of El Paso County Conservation Dist
|
4/8/2019 9:36:15 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
4/8/2019 9:36:13 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
4/8/2019 9:36:12 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
4/8/2019 9:36:11 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
4/8/2019 9:36:09 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
|
4/8/2019 9:36:08 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
4/8/2019 9:36:07 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of Parks Advisory Board
|
4/8/2019 9:36:06 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Parks Department
|
4/8/2019 9:36:03 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Health Department
|
4/8/2019 9:36:02 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
4/8/2019 9:36:01 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
4/8/2019 9:35:59 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/8/2019 9:27:09 AM
|
Submission Triaged
|
4/6/2019 10:08:57 AM
|
Submission received from Applicant
|
2/15/2019 2:14:51 PM
|
Request for Review Comments returned by Lewis Palmer 38
|
9/24/2018 10:21:00 AM
|
Submission request sent to Applicant
|
7/25/2018 4:51:41 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
4/24/2018 9:50:48 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/27/2018 4:57:53 PM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Ioana Comaniciu on behalf of Colorado Division of Water Resources
|
3/27/2018 4:57:51 PM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/15/2018 6:37:42 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/12/2018 4:38:40 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
2/7/2018 3:12:56 PM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
2/6/2018 8:33:54 AM
|
Request for Review Comments returned by EPC Health Department
|
2/5/2018 10:09:38 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/1/2018 10:08:16 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
1/31/2018 1:38:46 PM
|
Submission request sent to Applicant
|
1/31/2018 1:23:04 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/31/2018 1:21:32 PM
|
Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/31/2018 1:20:10 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/31/2018 1:18:27 PM
|
Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/31/2018 1:17:55 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/31/2018 1:15:18 PM
|
Request for Review Comments email resent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/31/2018 1:14:27 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/31/2018 1:00:33 PM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/30/2018 2:04:27 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
1/30/2018 12:15:53 PM
|
Submission request sent to Applicant
|
1/30/2018 12:12:03 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/24/2018 11:08:17 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/23/2018 5:12:14 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/23/2018 4:56:10 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/22/2018 11:55:39 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/19/2018 10:20:01 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/16/2018 6:42:59 PM
|
Request for Review Comments returned by Black Forest Trails Association
|
1/16/2018 3:02:38 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
1/16/2018 9:29:47 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
1/16/2018 9:02:48 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
1/16/2018 9:02:48 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
1/16/2018 9:02:47 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
1/16/2018 9:02:45 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Wangeman on behalf of Lewis Palmer 38
|
1/16/2018 9:02:44 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Pamela Davidson on behalf of El Paso County Conservation Dist
|
1/16/2018 9:02:43 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
1/16/2018 9:02:42 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
1/16/2018 9:02:41 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/16/2018 9:02:39 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
|
1/16/2018 9:02:38 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
1/16/2018 9:02:37 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
1/16/2018 9:02:36 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Ioana Comaniciu on behalf of Colorado Division of Water Resources
|
1/16/2018 9:02:35 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Parks Department
|
1/16/2018 9:02:32 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Health Department
|
1/16/2018 9:02:31 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/16/2018 9:02:30 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/16/2018 9:02:28 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/16/2018 8:57:50 AM
|
Submission Triaged
|
1/11/2018 8:46:00 PM
|
Submission received from Applicant
|
1/4/2018 9:57:30 AM
|
Request for Review Comments returned by Lewis Palmer 38
|
10/2/2017 4:06:55 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
9/20/2017 3:09:55 PM
|
Request for Review Comments returned by EPC Health Department
|
9/15/2017 4:01:26 PM
|
Request for Review Comments returned by EPC Parks Department
|
9/14/2017 8:49:23 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
9/12/2017 12:41:41 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
9/8/2017 3:58:18 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/7/2017 8:31:13 AM
|
Submission request sent to Applicant
|
9/7/2017 8:25:59 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/6/2017 8:52:47 AM
|
Request for Review Comments returned by EPC Parks Department
|
8/29/2017 2:46:58 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
8/29/2017 1:34:54 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
8/28/2017 2:29:05 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/25/2017 10:40:35 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
8/24/2017 3:04:44 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
8/23/2017 10:08:37 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
8/23/2017 9:11:31 AM
|
Request for Review Comments returned by EPC Environmental Services
|
8/22/2017 8:48:40 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
8/21/2017 7:17:19 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
8/21/2017 7:17:18 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
8/21/2017 7:17:17 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
8/21/2017 7:17:16 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Wangeman on behalf of Lewis Palmer 38
|
8/21/2017 7:17:15 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Pamela Davidson on behalf of El Paso County Conservation Dist
|
8/21/2017 7:17:14 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
|
8/21/2017 7:17:13 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Sebastian Schwender on behalf of Black Hills Energy-Aquila
|
8/21/2017 7:17:12 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
8/21/2017 7:17:11 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
8/21/2017 7:17:10 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
8/21/2017 7:17:09 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
8/21/2017 7:17:08 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
8/21/2017 7:17:07 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
8/21/2017 7:17:06 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Larry Long on behalf of Colorado State Forest Service
|
8/21/2017 7:17:05 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
|
8/21/2017 7:17:04 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
8/21/2017 7:17:03 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Melissa Peterson on behalf of Colorado Division of Water Resources
|
8/21/2017 7:17:02 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Parks Department
|
8/21/2017 7:17:01 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Administration Christine Juarez on behalf of EPC Health Department
|
8/21/2017 7:17:00 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Program Supervisor Joe Lomeli on behalf of EPC Health Department
|
8/21/2017 7:16:59 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by on behalf of EPC Health Department
|
8/21/2017 7:16:58 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
8/21/2017 7:16:57 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Edi Anderson on behalf of EPC County Attorney's Office
|
8/21/2017 7:16:54 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
8/21/2017 7:16:53 AM
|
Request for Review Comments email sent for Project Abert Ranch Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/17/2017 4:50:45 PM
|
Fees paid: 8/17/2017 (Receipt: 1000179)
|
8/3/2017 10:15:34 AM
|
File # Assigned: SP17007
|
8/3/2017 10:02:04 AM
|
Submission Triaged
|
8/3/2017 7:57:41 AM
|
Submission received from Applicant
|
8/3/2017 7:50:32 AM
|
Submission request sent to Applicant
|
8/2/2017 2:23:33 PM
|
Submission request sent to Applicant
|
8/2/2017 2:21:55 PM
|
Submission Triaged
|
8/2/2017 12:33:48 PM
|
Submission received from Applicant
|
7/25/2017 10:15:49 AM
|
Submission request sent to Applicant
|
7/25/2017 10:15:16 AM
|
Submission Triaged
|
7/25/2017 9:01:46 AM
|
Submission received from Applicant
|
7/24/2017 7:57:20 AM
|
Submission request sent to Applicant
|
5/11/2017 1:00:11 PM
|
Submission request sent to Applicant
|
5/11/2017 12:59:43 PM
|
Submission request sent to Applicant
|
5/11/2017 12:59:12 PM
|
Submission request sent to Applicant
|
5/1/2017 1:46:49 PM
|
Submission request sent to Applicant
|
5/1/2017 1:23:46 PM
|
Project Manager Assigned: Kari Parsons
|
5/1/2017 1:23:46 PM
|
EA Assigned: EA1642
|
5/1/2017 1:23:46 PM
|
Project Created
|