Project Review Comments
- File Number
- ADR268
- Project Name
- 11770 Ada Ln - Rear setback relief
- Description
- Requesting 20 feet where 25 is required on the rear setback in the RR-5 zoning district.
- Parcels
- 5218000025 5218000025
- Applicant
-
Great Day Improvement LLC
Doug Krehbiel ( dkrehbiel@championwindow.com )
(719) 452-8941 Doug Krehbiel ( dkrehbiel@championwindow.com )
(719) 452-8941 - File Number
- ADR268
- Project Manager
- Lacey Dean
- Status
- Active
- Created
- 7/22/2026 11:25:36 AM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
| View |
PCD Project Manager
9/17/2026 3:54:00 PM |
2 | V2_Site Plan Drawing_comments | 9/17/2026 3:54:00 PM |
|
PCD Project Manager
9/17/2026 3:34:22 PM |
2 |
Review 2: EPC Planning Division has comments in green text boxes on the following documents: - Site Plan Drawing Reviewed by: Lacey Dean, Planner laceydean2@elpasoco.com |
9/17/2026 3:34:22 PM | |
|
EPC DPW Development Services - Engineering
9/17/2026 2:23:52 PM |
2 |
Review 2. Engineering comments on the following documents (to be uploaded by the Project Manager): - Site Plan Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516 josephsandstrom@elpasoco.com |
9/17/2026 2:23:52 PM | |
|
Mountain View Electric Association, Inc.
9/17/2026 10:46:02 AM |
2 | Mountain View Electric Association does not object to this request, provided that unobstructed access to MVEA's existing facilities are maintained. MVEA has existing electric and/or broadband facilities within and adjacent to the subject parcel and reserves the right to access its facilities as necessary for inspection, maintenance, repair, replacement, upgrades, and emergency operations, which may require the use of trucks and other utility equipment. Any damage to, removal of, or relocation of MVEA facilities resulting from the applicant's activities shall be at the applicant's sole expense. | 9/17/2026 10:46:02 AM | |
|
Black Forest Fire Protection District
8/21/2026 10:22:50 PM |
1 |
Black Forest Fire Rescue Protection District (BFFRPD) has reviewed the submitted request for administrative relief at 11770 Ada Lane. BFFRPD has no objection to the proposed patio enclosure as shown on the submitted plans. The proposed improvement does not appear to negatively impact existing fire apparatus access or emergency response access to the property. All construction shall comply with applicable adopted fire code requirements and Colorado Wildfire Resiliency Code (CWRC) requirements if triggered by the scope of work. BFFRPD has no additional comments at this time. |
8/21/2026 10:22:50 PM | |
|
Mountain View Electric Association, Inc.
8/19/2026 1:02:42 PM |
1 | Mountain View Electric Association does not approve this request. MVEA has overhead facilities within the proposed site location and does not allow permanent structures within 10' either side of our facilities. Please contact me with any questions at 719-494-2685. Laura Hutson, Right of Way Specialist | 8/19/2026 1:02:42 PM | |
| View |
PCD Project Manager
8/10/2026 3:07:09 PM |
1 | V1_Site Plan Drawing_comments | 8/10/2026 3:07:09 PM |
| View |
PCD Project Manager
8/10/2026 3:06:56 PM |
1 | V1_Letter of Intent_comments | 8/10/2026 3:06:56 PM |
| View |
PCD Project Manager
8/10/2026 3:06:36 PM |
1 | V1_Application-Petition Form_comments | 8/10/2026 3:06:36 PM |
|
PCD Project Manager
8/10/2026 3:06:08 PM |
1 |
Review 1: EPC Planning Division has comments in green text boxes on the following documents. - Letter of Intent - Site Plan Drawing - Application/Petition Form Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com |
8/10/2026 3:06:08 PM | |
|
EPC DPW Development Services - Engineering
8/10/2026 10:05:09 AM |
1 |
Review 1. Engineering comments in blue on the following documents (to be uploaded by the project manager): - Letter of Intent - Site Plan Feel free to contact me directly if you have any questions regarding engineering comments. Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516 josephsandstrom@elpasoco.com |
8/10/2026 10:05:09 AM | |
| View |
EPC Environmental Services
8/4/2026 11:39:37 AM |
1 | 8/4/2026 11:39:37 AM | |
|
Academy School District 20 Building Fund
8/4/2026 10:43:32 AM |
1 |
Academy District 20 is in receipt of File #ADR268 for approval of the 11770 Ada Ln - Rear setback relief. The District has neither comments regarding this submission nor does it object to the submission. If you need additional information, please contact me. Peter Ristig Executive Director for Operations Academy School District Peter.ristig@asd20.org |
8/4/2026 10:43:32 AM | |
|
EPC DPW Stormwater
8/3/2026 12:39:33 PM |
1 |
EPC DPW Stormwater has no comments. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com |
8/3/2026 12:39:33 PM | |
|
PCD Administrative Notice
7/30/2026 1:32:59 PM |
1 | On 07/30/2026, PCD mailed "Notice of Administrative Determination" letters for ADR268 to surrounding property owners within a 500-foot range (21 addresses). The potential date an administrative decision can be made is 08/13/2026. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $16.38. JM | 7/30/2026 1:32:59 PM |