Project Review Comments
- File Number
- PUDSP265
- Project Name
- Sterling Ranch East Filing No 8 PUDSP 2cd Amendment Change in Water Supply
- Description
- This includes: Amendment to the Sterling Ranch East Filing No. 8 PUD Development Plan/Preliminary Plan (PUDSP256); This amendment will modify the site layout to accommodate a different lot type on 76 of the 154 lots. The Amendment will revise the configuration of the residential lots, internal roadways, tracts, and reduce the open-space acreage from 5.93 acres to 5.19 acres. 2. Change in water supply for an increase in water needed for the reduced lot count. The water demand increases by 11.1% from the original approval
- Parcels
- 5233000021 5233000021 5233108005 5233108005 5234200001 5234200001
- Applicant
-
N.E.S. Inc.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073 Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073 - EA Number
- EA21117
- File Number
- PUDSP265
- Project Manager
- Kari Parsons
- Status
- Active
- Created
- 4/15/2026 1:29:57 PM
View: Project Documents | Submit/View Public Comment
| Agency | Review # | Comment | ||
|---|---|---|---|---|
| View |
EPC DPW Development Services - Engineering
11/19/2026 2:26:48 PM |
1 | Drainage Report Redlines | 11/19/2026 2:26:48 PM |
|
EPC DPW Development Services - Engineering
11/19/2026 2:26:07 PM |
1 |
Review 1: EPC Engineering comments have been provided on the following documents: - Drainage Report - Preliminary Plan - Soils Report - Letter of Intent Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com |
11/19/2026 2:26:07 PM | |
|
County Attorney - Water
11/19/2026 12:23:03 PM |
1 | County Attorney’s Office will review for water sufficiency following receipt of findings from the Colorado Division of Water Resources. Thank you. | 11/19/2026 12:23:03 PM | |
|
PCD Project Manager
11/19/2026 12:19:41 PM |
1 | Please contact the State Water Engineer directly to answer any questions, as comments have not come in to date. If water amounts change, a new review would be required by the State. | 11/19/2026 12:19:41 PM | |
|
PCD Project Manager
11/19/2026 12:17:38 PM |
1 | I will request a line item for a Fire Protection Report. As requested by the Fire District, please combine all docs as one pdf. | 11/19/2026 12:17:38 PM | |
| View |
PCD Project Manager
11/19/2026 12:15:57 PM |
1 | Letter of Intent comments | 11/19/2026 12:15:57 PM |
| View |
PCD Project Manager
11/19/2026 12:15:22 PM |
1 | Soils and Geology Summary sheet | 11/19/2026 12:15:22 PM |
| View |
PCD Project Manager
11/19/2026 12:14:56 PM |
1 | Soils and Geology Report Comments. Please note summary is separate; pdf would not allow BlueBeam to append summary. | 11/19/2026 12:14:56 PM |
| View |
PCD Project Manager
11/19/2026 12:13:45 PM |
1 | PUDSP Plan comments | 11/19/2026 12:13:45 PM |
| View |
PCD Project Manager
11/19/2026 12:12:27 PM |
1 | Landscape plan comments | 11/19/2026 12:12:27 PM |
| View |
PCD Project Manager
11/19/2026 12:11:47 PM |
1 | Application Comments | 11/19/2026 12:11:47 PM |
|
Colorado Geological Survey
11/19/2026 10:01:23 AM |
1 |
The available referral documents include a Soils and Geology Study, Sterling Ranch East – Filing No. 8 (Entech Engineering, Job No. 220572, revised September 4, 2026); PUD Development Plan and Preliminary Plan (Classic Consulting, July 17, 2026); Letter of Intent (N.E.S., Inc., October 2026); and other documents. CGS offers the following comments and recommendations. 1. Groundwater and basement construction: The PUD Development Plan (Note 11) and Letter of Intent (p. 7) indicate that no basements are proposed and that all structures will have crawlspaces. However, Entech's revised September 4, 2026 soils and geology study introduces basement construction and indicates that site grading will raise ground elevations to accommodate basements (pp. 10–11). Basement construction was not identified in Entech's original August 27, 2025 study. Groundwater was encountered at depths of 7 to 13 feet below existing grade. Additionally, groundwater was measured approximately 2 to 3.5 feet below grade in piezometer P-3, located within the detention pond in Filing No. 6, east of Filing No. 8 (p. 7). Entech also observed standing water south of the site. Given the discrepancy between the development plans and Entech's revised study, along with the shallow groundwater conditions, CGS recommends that basements not be permitted within Filing No. 8. Entech should revise its report to reflect crawlspace-only construction and provide appropriate foundation and drainage recommendations based on final grading conditions. Additionally, CGS recommends that shallow groundwater conditions be evaluated and appropriately addressed during construction of the detention pond in Filing No. 6. 2. Potentially unstable slopes: Entech identified potentially unstable slopes along the former borrow area in the central portion of the site and recommends that construction be avoided in these areas unless appropriate mitigation is provided (pp. 9–11). Entech indicates that these areas will likely be regraded and that fill placed along the slopes should be properly benched to avoid creating unstable conditions. Note 10 of the PUD Development Plan confirms that the entire site will be regraded and slopes will be properly benched to avoid unstable conditions. CGS recommends that Entech review the proposed grading plans and confirm that the identified potentially unstable slopes will be adequately mitigated through the proposed grading and benching. Any additional stabilization measures should be identified and incorporated into the final grading plans. Reviewed on 11/19/2026 by Amy Crandall, Engineering Geologist (acrandall@mines.edu, 303-384-2632) |
11/19/2026 10:01:23 AM | |
|
Black Forest Fire Protection District
11/18/2026 5:33:38 PM |
1 |
1. **Ground-truthing.** Submit the completed Black Forest Fire Rescue Ground-Truthing Form, the wildfire professional’s report, and supporting maps for Filing 8 to BFFR in one PDF. Revise Fire Protection Report § 6.3.3.D.1.a to identify BFFR as the reviewing fire district for a site-specific determination under 2025 CWRC § 304. The report identifies the site as mapped Moderate. That classification applies unless BFFR approves a change in writing. 2. **Wildfire construction and site requirements.** Identify the mapped Moderate/Class 2 classification in the PUD and final plat notes. Apply the full Class 2 requirements of CWRC §§ 404 and 503, including Class A roof assemblies and applicable protection for vents, eaves, soffits, gutters, exterior walls, windows, doors, decks, and underfloor areas. Address defensible space, landscaping, and fencing on the revised layout. Identify the party responsible for ongoing vegetation maintenance where the revised common open-space tracts adjoin residential lots. 3. **Fire flow and hydrants.** Submit the final hydrant layout and fire-flow data to BFFR **before installing the hydrants**. For the proposed looped municipal system, show the required fire flow in gallons per minute, the required duration, and the available flow at a minimum residual pressure of 20 psi under the revised design-demand conditions. Show hydrant coverage along approved apparatus access routes. Update Fire Protection Report § 6.3.3.C.1.c.ix to identify when testing will occur and when firefighting water will be available during construction under the adopted 2021 IFC § 507 and Chapter 33. 4. **Fire apparatus access.** Design, construct, and maintain the revised roads in accordance with the adopted 2021 IFC § 503 and applicable local amendments. With the construction drawings due at final plat resubmittal, identify which connections to Idaho Falls Drive and Boulder City Drive will be available to fire apparatus during each phase of construction. |
11/18/2026 5:33:38 PM | |
|
PCD Project Manager
11/18/2026 9:38:22 AM |
1 |
Foursquare at Sterling Ranch PUDSP Amendment (Sterling Ranch East Fil 8) 1st amendment File Number PUDSP256 must be recorded to continue processing the 2nd amendment. Please obtain the Mylar with signatures for recording before next submittal and end of year. |
11/18/2026 9:38:22 AM | |
|
EPC DPW Stormwater
11/17/2026 8:45:31 AM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following document(s), to be uploaded by the PM: - Drainage Report Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
11/17/2026 8:45:31 AM | |
|
Mountain View Electric Association, Inc.
11/16/2026 8:10:56 AM |
1 | MVEA has no comment at this time. | 11/16/2026 8:10:56 AM | |
|
E911 Authority - El Paso/Teller County
11/12/2026 7:37:18 AM |
1 |
Streetnames previously approved. No action for E911 on this submittal. Thank you. Justin |
11/12/2026 7:37:18 AM | |
|
Pikes Peak Regional Building Department
11/11/2026 7:38:38 AM |
1 |
1. Foursquare at Sterling Ranch was already assigned addressing. A re-addressing fee will apply at the time of the review of the mylar. 2. Contact Enumerations when your are ready to have addressing assigned. Please provide a new overall map of the area filings for addressing purposed. 3. Will Sterling Ranch East Fil No. 2 be reconfigured as well? If so, please advise so that addressing does not get affected for both filings, since two of the streets are a logical continuation for filing No. 2 to this filing. 4. The 8 foot screen wall located behind lot 73, on tract D, will have an address assigned based on height. A separate permit will be issued. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
11/11/2026 7:38:38 AM | |
|
FAWWA (Falcon Area Water Wastewater Authority)
11/10/2026 3:41:22 PM |
1 | We have reviewed the project. This submittal contains water & wastewater reports generated by us for the project. No further comments/concerns. | 11/10/2026 3:41:22 PM | |
|
Falcon Fire Protection District
11/3/2026 1:11:49 PM |
1 |
These parcels are not within the Falcon Fire Protection District; these parcels are within the Black Forest Fire Rescue area. None of Sterling Ranch is within our fire district. Curtis L. Kauffman Fire Prevention Division Lieutenant/Fire Marshal |
11/3/2026 1:11:49 PM | |
|
Colorado Parks and Wildlife
11/3/2026 12:25:28 PM |
1 |
Please refer to Colorado Parks and Wildlife's previous comment. Please reach out to District Wildlife Manager Demetria Wright at demetria.wright@state.co.us or 719-439-9601 with any questions. Thank you. |
11/3/2026 12:25:28 PM | |
| View |
EPC Environmental Services
11/2/2026 10:28:13 AM |
1 | 11/2/2026 10:28:13 AM | |
| View |
Parks Advisory Board
10/30/2026 3:38:41 PM |
1 | El Paso County Parks Department - Final Administrative Comments, 5th Submittal - Please See Attached Documentation for Updated Comments (Originally endorsed by the El Paso County Parks Advisory Board on August 10, 2022) | 10/30/2026 3:38:41 PM |
| View |
EPC Parks Department
10/30/2026 3:37:09 PM |
1 | El Paso County Parks Department - Final Administrative Comments, 5th Submittal - Please See Attached Documentation for Updated Comments (Originally endorsed by the El Paso County Parks Advisory Board on August 10, 2022) | 10/30/2026 3:37:09 PM |
|
Academy SD 20 Building Fund
10/30/2026 9:19:30 AM |
1 |
Academy District 20 is in receipt of File #PUDSP265 for approval of the Sterling Ranch East Filing No 8 PUDSP 2cd Amendment Change in Water Supply. The District does not object to the plan amendment. The District is requesting fees in lieu of land dedication per the existing County Code, if applicable. The District is able to serve each student who is a resident of District 20. If you need additional information, please contact me. Peter Ristig Executive Director for Operations Academy School District Peter.ristig@asd20.org |
10/30/2026 9:19:30 AM | |
|
Upper Black Squirrel Creek GWMD
10/29/2026 3:04:43 PM |
1 | The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. Thank you. | 10/29/2026 3:04:43 PM |
EDARP