Project Review Comments
- File Number
- PPR2626
- Project Name
- Warehouse commercial on CS
- Description
- Site Development Plan for warehouse on commercial property
- Parcels
- 6514401005 6514401005
- Applicant
-
Mag Missiha
Mag Missiha ( mmissiha@gmail.com )
(303) 596-9070 Mag Missiha ( mmissiha@gmail.com )
(303) 596-9070 - File Number
- PPR2626
- Project Manager
- Tim Chambers
- Status
- Active
- Created
- 3/25/2026 12:56:19 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
|
Security Sanitation District
10/1/2026 12:01:36 PM |
1 |
1. The drawings need to include Security Sanitation District's 'General Notes' for sanitary sewer services. This can be procured by emailing b.bernard@securitywsd.com. 2. The sanitary sewer service design will need to include Security Sanitation District's Dual Cleanout Specification. This can be procured by emailing b.bernard@securitywsd.com. 3. Profile drawings of the sanitary sewer service crossing the district's 21-inch trunk line will need to be added and reviewed by the district to ensure they meet specifications. |
10/1/2026 12:01:36 PM | |
| View |
PCD Project Manager
9/30/2026 2:19:39 PM |
1 | V1_Site Development Plan | 9/30/2026 2:19:39 PM |
| View |
PCD Project Manager
9/30/2026 2:19:17 PM |
1 | V1_RIF | 9/30/2026 2:19:17 PM |
| View |
PCD Project Manager
9/30/2026 2:18:47 PM |
1 | V1_PCM Applicability PDF | 9/30/2026 2:18:47 PM |
| View |
PCD Project Manager
9/30/2026 2:18:06 PM |
1 | V1_Letter of Intent | 9/30/2026 2:18:06 PM |
| View |
PCD Project Manager
9/30/2026 2:16:24 PM |
1 | V1_Landscaping Plan | 9/30/2026 2:16:24 PM |
| View |
PCD Project Manager
9/30/2026 2:16:05 PM |
1 | V1_GEC Plan | 9/30/2026 2:16:05 PM |
| View |
PCD Project Manager
9/30/2026 2:15:49 PM |
1 | V1_Drainage Report | 9/30/2026 2:15:49 PM |
|
PCD Project Manager
9/30/2026 2:13:33 PM |
1 |
Planning has reviewed the application and provided comments on the following documents: - Site Development Plan - Letter of Intent - Landscaping Plan Engineering Documents uploaded here with comments and revisions: - Drainage Report - GEC Plan - Letter of Intent - RIF - Site Development Plan Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - GEC Plan - PCM Applicability Form Based on the limited site disturbance and site layout the following will not be required: - FAE - GEC Checklist |
9/30/2026 2:13:33 PM | |
|
Pikes Peak Regional Building Department
9/30/2026 8:34:54 AM |
1 |
Since the address is correct and this appears to be a single tenant building, Enumerations has no comments or objections. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
9/30/2026 8:34:54 AM | |
|
EPC DPW Stormwater
9/29/2026 4:48:15 PM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - Drainage Report - GEC Plan - PCM Applicability Form Based on the limited site disturbance and site layout the following will not be required: - FAE - GEC Checklist Reviewed by: Mikayla Hartford, P.E. Senior Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com |
9/29/2026 4:48:15 PM | |
|
EPC DPW Development Services - Engineering
9/30/2026 11:36:43 AM |
1 |
Review 1: EPC DPW Development Services comments have been provided (in blue) on the following documents (to be uploaded by project manager): - Drainage Report - GEC Plan - Letter of Intent - RIF - Site Development Plan Laura Besler, P.E. Engineer - Development Services Department of Public Works Office: (719) 520-6868 Mobile: (719) 482-0977 laurabesler@elpasoco.com |
9/30/2026 11:36:43 AM | |
|
RBD Floodplain
9/29/2026 1:44:21 PM |
1 | no comment | 9/29/2026 1:44:21 PM | |
| View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/28/2026 11:45:46 AM |
1 | see file - Sub 1_PPR2626_6140 Southmoor Dr_PPR_20260928 for CSU comments. | 9/28/2026 11:45:46 AM |
|
El Paso County Conservation Dist
9/23/2026 11:20:14 PM |
1 |
The El Paso County Conservation District has reviewed this and we have the following comments: 1) Erosion controls/Revegetation plans The application has GEC and Landscape plans that are mostly sufficient, but we would like to see a few additions to one or both, however the applicant most sees fit. A) In both plans, they have a "native seed" mix being used around the site for their revegetation. We would like to see the native seed mix name and species composition in their plans as well to ensure they are a seed mix that is native and naturalized plant species to El Paso County, particularly due to the proximity to Fountain Creek, which had a lot of current issues with non-native invasive plants within its watershed. B) Disturbed areas need to be mulched after seeding with weed-free hay or straw mulch at approximately 5,000 lbs per acre due to the proximity to Fountain Creek in order to improve germination rates of the grass seed and prevent soil erosion until grasses are established. C) If the applicant is in need of a natural grass source, consider using the El Paso County Conservation District’s Native Shotgun Mix (available at EPCCD.org) for reseeding, which is well suited to soils present on this site and is comprised of 100% native and naturalized grass species. If these measures are added to the project's plan, then the El Paso County Conservation District will be content with the applicant's commitment to soil conservation, watershed protection, and protection of the surrounding community. For any questions, please feel free to contact the EPCCD at 719-600-4706 or Will Vogl - Board VP at Will@EPCCD.org |
9/23/2026 11:20:14 PM | |
| View |
EPC Environmental Services
9/23/2026 1:44:59 PM |
1 | 9/23/2026 1:44:59 PM |
EDARP