Project Review Comments
- File Number
- CDR263
- Project Name
- Rhetoric Sanitary & Water Plan Update
- Description
- Update to CDRs Previous subdivision approved under SF2325 with original CDs. Additional sanitary sewer lines being added
- Location
- 7689 STERLING RANCH RD
- Parcels
- 5305105001 5305105001
- Applicant
-
All Terrain Engineering
Nicholas Jokerst ( njokerst@allterraineng.com )
(530) 391-7635 Nicholas Jokerst ( njokerst@allterraineng.com )
(530) 391-7635 - File Number
- CDR263
- Project Manager
- Edward Schoenheit
- Status
- Active
- Created
- 3/2/2026 5:26:14 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
| View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/26/2026 8:28:41 AM |
3 |
All CSU comments have been addressed for CDR263 There are no CSU gas infrastructure within the project scope of work. |
8/26/2026 8:28:41 AM |
|
EPC DPW Development Services - Engineering
8/26/2026 8:16:49 AM |
3 |
Engineering Review Ver.3 Pending CSU closeout No further EPC DPW engineer comments. Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/ |
8/26/2026 8:16:49 AM | |
|
Black Forest Fire Protection District
8/21/2026 11:32:26 PM |
3 |
Black Forest Fire Rescue Protection District (BFFRPD) has reviewed the submitted utility plans for the Rhetoric Storage Facility. BFFRPD has no objection to the proposed sanitary sewer improvements. The proposed fire hydrant and water service shall be installed in accordance with the approved Falcon Area Water & Wastewater Authority (FAWWA) plans and applicable BFFRPD fire protection requirements. The fire hydrant shall be installed, accessible, operational, and capable of providing the required fire flow prior to combustible construction and/or occupancy, as applicable. |
8/21/2026 11:32:26 PM | |
| View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/11/2026 11:34:01 AM |
2 |
Not addressed. Ensure horizontal separation is maintained from any gas infrastructure. Call out and Provide dimension from existing Gas Distribution Main #R19M353 to proposed manhole/wastewater main. |
8/11/2026 11:34:01 AM |
|
EPC DPW Development Services - Engineering
8/11/2026 8:56:21 AM |
2 |
Engineering Review Ver.2 No further engineer comments. CDs sent for approval and will be uploaded once signed. Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/ |
8/11/2026 8:56:21 AM | |
|
Colorado Springs Public Works
8/10/2026 7:33:38 AM |
2 |
Traffic Engineering has no comments on this item. Brian Shevock Public Works/Traffic Engineering Traffic Engineer II City of Colorado Springs brian.shevock@coloradosprings.gov (719) 385-7620 |
8/10/2026 7:33:38 AM | |
|
Colorado Springs Public Works
8/7/2026 12:52:05 PM |
2 |
If there are no new public accesses or public improvements are planned to be constructed along Marksheffel, the City will not need to review/approve construction drawings. Removal and replacement of deficient curb, gutter, sidewalk, pedestrian ramps, etc. adjacent to site developing along Marksheffel will still be required, however. Thank you. Joel Dagnillo, P.E. Engineer III Engineering Development Review City of Colorado Springs (719)385-5412 Joel.dagnillo@coloradosprings.gov |
8/7/2026 12:52:05 PM | |
|
Black Hills Energy-Aquila
4/16/2026 11:28:19 AM |
1 | This project is not in our certificated area. No comment | 4/16/2026 11:28:19 AM | |
|
EPC DPW Stormwater
3/25/2026 6:35:04 AM |
1 |
Review 1: EPC DPW Stormwater does not have comments on any of the submitted documents. The limits of disturbance for this proposed utility work is already covered under the active ESQCP that was approved with SF2325, which has the same owner as this utility project. Therefore an ESQCP and all accompanying documents are not required with this utility project. For SW permitting purposes, this utility project is more seen as an add-on to the scope of SF2325. Thanks. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
3/25/2026 6:35:04 AM | |
|
PCD Project Manager
3/24/2026 3:44:39 PM |
1 |
Engineering Review Ver.1 No engineer comments. FAE and Surety may not be needed pending SW Dept final review comments. Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/ |
3/24/2026 3:44:39 PM | |
|
EPC DPW Development Services - Engineering
3/24/2026 3:44:08 PM |
1 |
Engineering Review Ver.1 No engineer comments. FAE and Surety may not be needed pending SW Dept final review comments. Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/ |
3/24/2026 3:44:08 PM | |
| View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/16/2026 9:58:21 AM |
1 | Ensure horizontal separation is maintained from any gas infrastructure | 3/16/2026 9:58:21 AM |
|
Colorado Springs Public Works
3/13/2026 2:49:08 PM |
1 |
- All existing curb, gutter, sidewalk and pedestrian ramps along Marksheffel Rd. in poor condition or not meeting City Standard must be removed and replaced prior to Certificate of Occupancy issuance. - Submit construction plans to the City of Colorado Springs Engineering Development Review and Traffic Engineering for all proposed public accesses to Marksheffel Rd. Joel Dagnillo, P.E. Engineer III Engineering Development Review City of Colorado Springs (719)385-5412 Joel.dagnillo@coloradosprings.gov |
3/13/2026 2:49:08 PM | |
|
Colorado Springs Public Works
3/11/2026 6:23:26 PM |
1 |
Traffic Engineering has no comments on this item. Brian Shevock Public Works/Traffic Engineering Traffic Engineer II City of Colorado Springs brian.shevock@coloradosprings.gov (719) 385-7620 |
3/11/2026 6:23:26 PM | |
|
Mountain View Electric Association, Inc.
3/11/2026 2:47:13 PM |
1 | MVEA has no objection | 3/11/2026 2:47:13 PM |