Project Review Comments

Back to List


File Number
CC262
Project Name
SR Land Commercial Rezoning
Description
Rezoning from RR-5 and CC to Commercial
Parcels
5232400001 5232400001 5232400003 5232400003
Applicant
N.E.S. Inc.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
EA Number
EA25137
File Number
CC262
Project Manager
Kylie Bagley
Status
Active
Created
1/14/2026 8:59:26 AM

View: Project Documents | Submit/View Public Comment



Review Comments (13)

Link Agency Review # Comment
FAWWA (Falcon Area Water Wastewater Authority)
11/24/2026 2:15:30 PM
1 No comments 11/24/2026 2:15:30 PM
View PCD Project Manager
11/23/2026 10:35:41 AM
1 Traffic Impact Study redlines 11/23/2026 10:35:41 AM
View PCD Project Manager
11/23/2026 10:35:14 AM
1 Letter of Intent redlines 11/23/2026 10:35:14 AM
View PCD Project Manager
11/23/2026 10:34:49 AM
1 Planning comments on Zoning Map 11/23/2026 10:34:49 AM
EPC DPW Development Services - Engineering
11/20/2026 3:02:36 PM
1 Review 1: EPC Engineering comments have been provided on the following documents (to be uploaded by project manager):

- Letter of Intent
- Rezone Map
- Traffic Impact Study

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
11/20/2026 3:02:36 PM
EPC DPW Stormwater
11/19/2026 7:18:15 PM
1 Review 1: EPC DPW Stormwater does not have comments on any of the submitted documents.

- Glenn Reese
11/19/2026 7:18:15 PM
Mountain View Electric Association, Inc.
11/19/2026 3:18:21 PM
1 MVEA has no comment. 11/19/2026 3:18:21 PM
Black Forest Fire Protection District
11/18/2026 6:10:33 PM
1 Black Forest Fire Rescue has no objection to the requested rezoning of the 8.871-acre site at the southeast corner of Vollmer Road and Marksheffel Road from RR-5 to CC (Commercial Community), retaining the Commercial Airport Overlay. The application and Letter of Intent identify parcels 5232400001 and 5232400003. Please reconcile the EDARP parcel list with the submitted zoning exhibit and legal description, including whether parcel 5305104001 is within the rezoning boundary.

Refer the future site development plan to BFFR when the proposed uses and building layout are established. The Letter of Intent identifies two conceptual access points on Vollmer Road and one right-in/right-out access on Marksheffel Road. Show which entrances fire apparatus will use, how apparatus will reach each building, and how required fire lanes will remain clear of parking, deliveries, and vehicle queues under the adopted 2021 IFC § 503 and applicable local amendments.

Coordinate firefighting water supply with the Falcon Area Water and Wastewater Authority. Submit the hydrant layout and supporting fire-flow data to BFFR before hydrant installation under 2021 IFC § 507. At site and building review, BFFR will evaluate the applicable wildfire requirements and the fire-protection systems required for the proposed occupancies. If motor-fuel dispensing advances beyond the traffic-study concept, include the fuel layout for review under 2021 IFC Chapter 23.
11/18/2026 6:10:33 PM
Academy School District 20 Building Fund
11/11/2026 3:12:12 PM
1 Academy District 20 is in receipt of File #CC262 for approval of the SR Land Commercial Rezoning. The District does not object to the project. The District is requesting fees in lieu of land dedication per the existing County Code, if applicable.

If you need additional information, please contact me.

Peter Ristig
Executive Director for Operations
Academy School District
Peter.ristig@asd20.org
11/11/2026 3:12:12 PM
View EPC Environmental Services
11/9/2026 11:33:32 AM
1 11/9/2026 11:33:32 AM
EPC Parks Department
11/9/2026 11:26:22 AM
1 El Paso County Parks Department. The 2022 El Paso County Parks Master Plan shows no impacts by this proposed commercial project to either existing or proposed parks, trails, or open space. An extension of the Sand Creek Primary Regional Trail exists as a concrete sidewalk on the northern side of Marksheffel Road, and the Marksheffel Road Bicycle Route will be located within right-of-way, so no parkland or trail easement dedications will be necessary as this project moves forward. Regional Park Fees will be assessed on a per-commercial lot basis, with those fees being due at time of the recording of the final plat(s). EPC Parks is submitting these comments administratively and has no objections to the rezoning application. Thank you! 11/9/2026 11:26:22 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/6/2026 7:55:46 AM
1 Add a note if 20' electric easement is public or private 11/6/2026 7:55:46 AM
Falcon Fire Protection District
11/5/2026 7:13:34 AM
1 This project is not within the Falcon Fire Protection District. This project lies within the Black Forest Fire Rescue District.

Curtis L. Kauffman
Fire Prevention Division
Lieutenant/Fire Marshal
11/5/2026 7:13:34 AM