Project Review Comments

Back to List


File Number
PPR2619
Project Name
Rolling Meadows Substation
Description
Substation within Antelope Ridge and Bull Hill PUD Formerly (Substation Bull Hill)
Parcels
5500000324 5500000324
Applicant
Ulteig
Derek Holscher ( derek.holscher@ulteig.com )
(720) 873-5876
Derek Holscher ( derek.holscher@ulteig.com )
(720) 873-5876
EA Number
EA24102
File Number
PPR2619
Project Manager
Jen Uhler
Status
Active
Created
12/19/2025 11:05:49 AM

View: Project Documents



Review Comments (20)

Link Agency Review # Comment
View Widefield School District 3
8/6/2026 7:03:51 AM
1 8/6/2026 7:03:51 AM
View PCD Project Manager
8/3/2026 1:48:40 PM
1 Site Dev Plan comments 8/3/2026 1:48:40 PM
View PCD Project Manager
8/3/2026 1:47:43 PM
1 Letter of intent comments 8/3/2026 1:47:43 PM
View PCD Project Manager
8/3/2026 1:47:08 PM
1 GEC Plan comments 8/3/2026 1:47:08 PM
View PCD Project Manager
8/3/2026 1:45:55 PM
1 FAE comments 8/3/2026 1:45:55 PM
View PCD Project Manager
8/3/2026 1:45:24 PM
1 Drainage Report comments 8/3/2026 1:45:24 PM
PCD Project Manager
8/3/2026 1:43:29 PM
1 Planning has reviewed the submittal and has comments on the following documents:
- Letter of Intent
- Site Development Plan

Engineering Documents are uploaded here as well.

Jen Uhler
PCD Planner
719-520-7952
jenuhler@elpasoco.com
8/3/2026 1:43:29 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/31/2026 11:39:52 AM
1 Proposed development is outside of Colorado Springs Utilities Water, Watsewater, and Electric service areas, and currently has no gas infrastructure. CSU has no action item comments for this project.

Information only: Please reach out to Colorado Springs Utilities Gas Field Engineering regarding future extension of gas to the site. Contact Justin Hedberg at juhedberg@csu.org
7/31/2026 11:39:52 AM
View EPC DPW Stormwater
7/30/2026 12:35:02 PM
1 SWMP Comments 7/30/2026 12:35:02 PM
View EPC DPW Stormwater
7/30/2026 12:34:34 PM
1 PCM O&M Manual Comments 7/30/2026 12:34:34 PM
View EPC DPW Stormwater
7/30/2026 12:34:18 PM
1 PCM - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal) Comments 7/30/2026 12:34:18 PM
View EPC DPW Stormwater
7/30/2026 12:34:00 PM
1 PCM Applicability Form Comments 7/30/2026 12:34:00 PM
View EPC DPW Stormwater
7/30/2026 12:33:11 PM
1 GEC Checklist Comments 7/30/2026 12:33:11 PM
View EPC DPW Stormwater
7/30/2026 12:32:49 PM
1 GEC Comments 7/30/2026 12:32:49 PM
View EPC DPW Stormwater
7/30/2026 12:30:53 PM
1 ESQCP Comments 7/30/2026 12:30:53 PM
View EPC DPW Stormwater
7/30/2026 12:28:22 PM
1 Drainage Report Comments 7/30/2026 12:28:22 PM
EPC DPW Stormwater
7/30/2026 11:47:31 AM
1 Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report
- ESQCP
- GEC Plan
- GEC Checklist
- PCM Applicability Form
- PCM - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal)
- PCM O&M Manual
- SWMP

Please provide the following document upon resubmittal (the planner will need to send an upload request):
- PCM - MHFD Detention Calcs or SDI Form

Reviewed by:
Mikayla Hartford, P.E.
Senior Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
7/30/2026 11:47:31 AM
EPC DPW Development Services - Engineering
7/24/2026 1:19:17 PM
1 Review 1: EPC Engineering has comments on the following documents (to be uploaded by project manager):

- Final Drainage Report
- Financial Assurance
- Grading & Erosion Control Plan
- Letter of Intent
- Site Development Plan

Due to the types of comments provided, additional comments may be generated on the next review.

Reviewed by:

Charlene Durham, PE
charlenedurham@elpasoco.com
7/24/2026 1:19:17 PM
Pikes Peak Regional Building Department
7/17/2026 1:54:57 PM
1 1. How tall is the perimeter fencing. If the fencing exceeds 7’, a separate address will need to be assigned along with a separate permit.
2. Is the proposed roadway that this lot will access Rolling Meadows Parkway? Please clarify if this roadway will be in place when this substation is built or will it be later. Please clarity so that an address can be assigned from this street or Bradley Road. If it will be addressed from Bradley Road, it will be required that the address of the substation be changed once the access road is built.
See link here for future address change if need be. https://www.pprbd.org/File/Resources/Downloads/Addressing/Request%20for%20change%20of%20address%20ACCESS.pdf
3. Address 11295 Bradley Road is the preliminary address to the substation.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
7/17/2026 1:54:57 PM
Mountain View Electric Association, Inc.
7/16/2026 9:29:36 AM
1 MVEA is working with Tri State on this project. 7/16/2026 9:29:36 AM