Project Review Comments

Back to List


File Number
PPR2539
Project Name
Waterbury Lift Station
Description
Lift station for Waterbury - to be owned by 4-way Ranch Metro District.
Parcels
4200000366 4200000366 4200000368 4200000368 4200000417 4200000417
Applicant
William Guman & Associates, Ltd.
Bill Guman ( bill@guman.net )
(719) 633-9700
Bill Guman ( bill@guman.net )
(719) 633-9700
File Number
PPR2539
Project Manager
Maria Lancto
Status
Active
Created
12/12/2025 8:05:03 AM

View: Project Documents



Review Comments (11)

Link Agency Review # Comment
View PCD Project Manager
1/12/2026 10:22:29 AM
1 V1_Site Development Plan 1/12/2026 10:22:29 AM
View PCD Project Manager
1/12/2026 10:22:17 AM
1 V1_PCM Applicability Form 1/12/2026 10:22:17 AM
View PCD Project Manager
1/12/2026 10:22:04 AM
1 V1_Letter of Intent 1/12/2026 10:22:04 AM
View PCD Project Manager
1/12/2026 10:21:53 AM
1 V1_Construction Drawings (Plans-Profiles) 1/12/2026 10:21:53 AM
PCD Project Manager
1/12/2026 10:21:32 AM
1 EPC Planning Comment: Please see comments on the following items:
- V1_Construction Drawings (Plans-Profiles)
- V1_Letter of Intent
- V1_PCM Applicability Form
- V1_Site Development Plan
1/12/2026 10:21:32 AM
EPC DPW Development Services - Engineering
1/9/2026 9:34:25 AM
1 DPW Engineering review 1 has comments on the following documents

- Letter of Intent
- Construction Drawings

Please submit a drainage report/letter with the next submittal.

Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
1/9/2026 9:34:25 AM
Pikes Peak Regional Building Department
1/8/2026 10:48:58 AM
1 Enumerations has the following comments:

1. The access to this lift station is shown as coming from a new subdivision which is not platted at this time, and will not be platted for a considerable time. Where is the access going to be prior to plat recording? An address will need to be assigned from that access in order to submit plans for permit. Prior to submitting plans, submit a site plan to Enumerations showing the location of the scope of work and the access so that an address can be established.
2. Once the proposed Waterbury subdivisions are platted, an address change which reflects the new access location for the proposed lift station will need to be completed. When submitting a site plan to establish an address for the initial build, it must be accompanied by an address change request which will be executed when the subdivision plat is recorded, thereby changing the access to the lift station. The form to submit an address change request can be found here: https://www.pprbd.org/File/Resources/Downloads/Addressing/Request%20for%20change%20of%20address%20ACCESS.pdf

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
1/8/2026 10:48:58 AM
View EPC Health Department
1/6/2026 9:07:08 AM
1 1/6/2026 9:07:08 AM
EPC DPW Stormwater
1/8/2026 2:24:08 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- CDs
- PCM Applicability Form
- Site Development Plan

Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- ESQCP
- FAE (Use 2026 FAE form attached in my PCM Applicability Form comment)
- GEC Plan (can be included in CDs)
- GEC Checklist
- SWMP
- SWMP Checklist

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
1/8/2026 2:24:08 PM
RBD Floodplain
1/5/2026 8:09:47 AM
1 site not in SFHA, no comment 1/5/2026 8:09:47 AM
View Falcon Fire Protection District
12/31/2025 12:04:17 PM
1 12/31/2025 12:04:17 PM