Project Review Comments

Back to List


File Number
BOA255
Project Name
10890 Salbeck Ln - Size of accessory structure in RR-5
Description
Applicant is requesting to build a 29250 sq ft agricultural accessory structure in the RR-5 where the principal structure is only 2100 sq ft. An agricultural accessory structure cannot exceed twice the sq footage of the principal structure.
Parcels
5223004001 5223004001
Applicant
Tobin Allen
Tobin Allen ( tobin@allen-builders.com )
(214) 263-4276
Tobin Allen ( tobin@allen-builders.com )
(214) 263-4276
File Number
BOA255
Project Manager
Maria Lancto
Status
Active
Created
11/20/2025 11:43:54 AM

View: Project Documents



Review Comments (9)

Link Agency Review # Comment
View PCD Project Manager
12/10/2025 3:38:49 PM
1 Site Plan 12/10/2025 3:38:49 PM
View PCD Project Manager
12/10/2025 3:38:21 PM
1 Letter of Intent 12/10/2025 3:38:21 PM
PCD Project Manager
12/10/2025 3:37:43 PM
1 EPC Planning Review 1: Please see comments on the following documents:
- Site Plan
- Letter of Intent

Maria Lancto, AICP
Senior Planner
719-520-6447
marialancto@elpasoco.com
12/10/2025 3:37:43 PM
EPC DPW Development Services - Engineering
12/8/2025 5:16:15 PM
1 Review 1.

Engineering comments in blue on the following documents (to be uploaded by the project manager):
- Site Plan
- Letter of Intent

Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
12/8/2025 5:16:15 PM
EPC DPW Stormwater
12/8/2025 4:07:37 PM
1 Review 1: EPC DPW Stormwater has no comments. EPC Project Manager: no re-review necessary.

Note: The proposed area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction.

Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
12/8/2025 4:07:37 PM
Pikes Peak Regional Building Department
12/8/2025 2:41:26 PM
1 Enumerations has no comment or objection to this variance request

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
12/8/2025 2:41:26 PM
View Falcon Fire Protection District
12/4/2025 12:21:53 PM
1 12/4/2025 12:21:53 PM
PCD Administrative Notice
12/2/2025 9:19:41 AM
1 On 12/02/2025, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (17 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $12.58. TC 12/2/2025 9:19:41 AM
View Mountain View Electric Association, Inc.
11/26/2025 4:11:29 PM
1 see attached comment letter 11/26/2025 4:11:29 PM