Project Review Comments

Back to List


File Number
CDR2516
Project Name
Antelope Ridge - Collector Road Plans
Description
CD's for design of collector road
Parcels
5500000324 5500000324
Applicant
Core Engineering Group
Richard Schindler ( rich@ceg1.com )
(719) 659-7800
Richard Schindler ( rich@ceg1.com )
(719) 659-7800
EA Number
EA24102
File Number
CDR2516
Project Manager
Charlene Durham
Status
Active
Created
11/19/2025 10:51:43 AM

View: Project Documents



Review Comments (21)

Link Agency Review # Comment
PCD Project Manager
1/2/2026 11:21:17 AM
1 Please address comments and resubmit revised documents. 1/2/2026 11:21:17 AM
View EPC DPW Development Services - Engineering
1/2/2026 11:19:39 AM
1 GEC Redlines 1/2/2026 11:19:39 AM
View EPC DPW Development Services - Engineering
1/2/2026 11:07:16 AM
1 FAE Redlines 1/2/2026 11:07:16 AM
View EPC DPW Development Services - Engineering
1/2/2026 11:06:52 AM
1 FDR Redlines 1/2/2026 11:06:52 AM
View EPC DPW Development Services - Engineering
1/2/2026 11:06:28 AM
1 Construction Drawing Redlines 1/2/2026 11:06:28 AM
EPC DPW Development Services - Engineering
12/31/2025 1:25:28 PM
1 CDR2516: Antelope Ridge - Collector Road Plans
Review 1
STORM SEWERS PLANS ONLY
Engineering Comments have been provided on the following documents (to be uploaded by Project Manager):FYI: V2 items below will be uploaded PUDSP255 review.

V1_Construction Drawings
V1_FAE
V2_Letter of Intent (see comments on PUDSP255, these comments are applicable to CDR2516: Antelope Ridge - Collector Road Plans)
V2_Drainage Report – Final (see comments on PUDSP255, these comments are applicable to CDR2516: Antelope Ridge - Collector Road Plans)
V2_Soils & Geology Report (see comments on PUDSP255, these comments are applicable to CDR2516: Antelope Ridge - Collector Road Plans)
V2_Grading & Erosion Control Plan - Early Grading (see comments on PUDSP255, these comments are applicable to CDR2516: Antelope Ridge - Collector Road Plans)
V2_Roundabout Report – Preliminary (see comments on PUDSP255, these comments are applicable to CDR2516: Antelope Ridge - Collector Road Plans)


Applicant Notes:
I am requesting a response letter with your next submittal explaining how each comment was addressed (please copy and paste all comments to your response letter and respond below each comment). Please do not use the words done, fixed, etc. instead explain how you addressed each comment and indicate the sheet number where each comment was addressed.
Please email me at the email address indicated below, a request for a TEAM’S RCR “Review Comment Resolution” meeting prior to resubmittal to make sure all comments are addressed, so we can move this project forward to approval.
Please address all the comments and resubmit.

The applicant must upload the revised plans, reports, documents and missing items indicated below with his/her resubmittal:
V1_Construction Drawings
V1_FAE
Missing ROW and easement documents (where surface ground is changing, Meridian etc.).

Sincerely

Reviewed by:

Jalal
Jalal Saleh, PE
jalalsaleh@elpasoco.com

Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com


Charlene Durham, PE
charlenedurham@elpasoco.com
12/31/2025 1:25:28 PM
Security Fire Protection District
12/31/2025 11:32:48 AM
1 MAS for SFD no comments or objections 12/31/2025 11:32:48 AM
View EPC DPW Stormwater
12/31/2025 11:17:34 AM
1 SWMP 12/31/2025 11:17:34 AM
View EPC DPW Stormwater
12/31/2025 11:09:34 AM
1 PCM Applicability Form 12/31/2025 11:09:34 AM
View EPC DPW Stormwater
12/31/2025 11:08:43 AM
1 ESQCP 12/31/2025 11:08:43 AM
EPC DPW Stormwater
12/31/2025 9:18:55 AM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- CDs.......................(to be uploaded with Development Services comments)
- Drainage Report...(to be uploaded with Development Services comments)
- ESQCP
- FAE.......................(to be uploaded with Development Services comments)
- GEC Plan...............(to be uploaded with Development Services comments)
- PCM Applicability Form
- SWMP

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
12/31/2025 9:18:55 AM
County Attorney - Development Review
12/23/2025 3:30:26 PM
1 Review #1: No comment from County Attorney – Development Review at this time.

Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com.
12/23/2025 3:30:26 PM
View Widefield SD 3
12/18/2025 4:01:11 PM
1 12/18/2025 4:01:11 PM
Colorado Springs Public Works
12/18/2025 12:47:22 PM
1 If this site is selected for pre-annexation, EDRD will require all public improvements to meet full City standards.

Reviewed by Hao Vo, P.E.
hao.vo@coloradosprings.gov
12/18/2025 12:47:22 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/11/2025 1:46:03 PM
1 This project is outside the Colorado Springs Utilities service area for water, wastewater, gas and electric. CSU Staff has no comments. 12/11/2025 1:46:03 PM
Colorado Parks and Wildlife
12/10/2025 10:19:38 AM
1 Please see comments made on the project submitted 9/30/2025. Thanks! 12/10/2025 10:19:38 AM
Colorado Springs Airport Advisory Commission
12/8/2025 8:45:21 AM
1 The Airport has no comments, this property is outside Airport Overlay. 12/8/2025 8:45:21 AM
EPC Parks Department
12/5/2025 12:55:40 PM
1 El Paso County Parks Comments:

Thank you for including El Paso County Parks staff on the review of this CDR application!

Upon review of this CDR application, staff noticed that the road construction does not impact proposed parks, trails, or open spaces in relation to the ongoing Antelope Ridge at Bull Hill Preliminary Plan application.

The Parks department will not have comments on this project.

Thank you!

Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6999
12/5/2025 12:55:40 PM
RBD Floodplain
12/5/2025 11:04:54 AM
1 no work associated with "Antelope Ridge - Collector Road Plan" is located in the SFHA.
no further comment
12/5/2025 11:04:54 AM
Colorado Springs Public Works
12/5/2025 8:58:54 AM
1 Traffic Engineering will require all public improvements to be built to full City Standards if this site is chosen for pre-annexation.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
12/5/2025 8:58:54 AM
Colorado Springs Planning & Community Development
12/4/2025 5:49:29 PM
1 It is understood that these collector roads are proposed to support single family development within El Paso County jurisdiction. If annexation is not to be expected, City Planning has no comments regarding the build out and dedication of these collector streets. 12/4/2025 5:49:29 PM