Project Review Comments

Back to List


File Number
CDR2514
Project Name
Lewis Palmer School District 38 Trail Project - Bridge Component
Description
Construction drawings for bridge - associated with PPR2240
Parcels
7111000028 7111000028 7111304014 7111304014 7111400008 7111400008 7111404032 7111404032 7111405001 7111405001 7114205030 7114205030
Applicant
JR Engineering
Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241
Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241
EA Number
EA2148
File Number
CDR2514
Project Manager
Charlene Durham
Status
Active
Created
11/13/2025 9:04:48 AM

View: Project Documents



Review Comments (12)

Link Agency Review # Comment
PCD Project Manager
1/2/2026 11:48:42 AM
1 Please address agency review comments and resubmit. 1/2/2026 11:48:42 AM
View EPC DPW Development Services - Engineering
1/2/2026 11:46:40 AM
1 FAE Redlines 1/2/2026 11:46:40 AM
View EPC DPW Development Services - Engineering
1/2/2026 11:46:16 AM
1 CDs Redlines 1/2/2026 11:46:16 AM
EPC DPW Development Services - Engineering
1/2/2026 11:47:29 AM
1 DPW Engineering Review 1. Comments have been provided on the following documents:

- Construction Drawings
- FAE

Note: If any of the proposed work falls within El Paso County ROW, a Work in the ROW permit will be required.

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
1/2/2026 11:47:29 AM
View EPC DPW Stormwater
12/30/2025 8:04:07 AM
1 PCM Applicability Form 12/30/2025 8:04:07 AM
EPC DPW Stormwater
12/30/2025 8:17:38 AM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- PCM Applicability Form

Since the soil disturbance will be minimal (0.02 ac) and will occur outside of the spillway, an ESQCP will not be required for this project. The following documents will not be required for resubmittal:
- ESQCP Form
- GEC Checklist
- GEC Plan (Can leave in the CDs, the GEC sheets just won't be reviewed)
- SWMP
- SWMP Checklist

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
12/30/2025 8:17:38 AM
View Woodmoor Water and Sanitation District
12/29/2025 3:56:14 PM
1 Please see the attached document for all WWSD comments. 12/29/2025 3:56:14 PM
View EPC Health Department
12/22/2025 10:51:42 AM
1 12/22/2025 10:51:42 AM
View EPC Environmental Services
12/12/2025 8:44:48 AM
1 12/12/2025 8:44:48 AM
911 Authority - El Paso/Teller County
12/10/2025 2:27:15 PM
1 No action for E911 on this submittal.
Thank you.
Justin.
12/10/2025 2:27:15 PM
EPC Parks Department
12/10/2025 2:14:55 PM
1 El Paso County Parks Comments:

Thank you for including El Paso County Parks staff on the review of this CDR application!

Upon review of this CDR application, staff noticed that the road construction does not impact any existing or proposed parks, trails, or open spaces.

The Parks department will not have comments on this project.

Thank you!

Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6999
12/10/2025 2:14:55 PM
Tri-Lakes-Monument Fire Protection District
12/10/2025 9:54:40 AM
1 Fire code does not apply to this project. The fire department has no objection. 12/10/2025 9:54:40 AM