Project Review Comments

Back to List


File Number
SF2624
Project Name
Blue Springs Meadow Minor Final Plat
Description
Blue Springs Meadow subdivision. Platting 38-acre parcel into 7 lots. Water sufficiency required. Subject to rezone from A-35 to RR-5. Includes construction drawing review.
Location
19225 Elliott View
Parcels
3208000002 3208000002
Applicant
Scott Building
Michael Andon ( michael@scottbuilding.com )
(602) 615-9749
Michael Andon ( michael@scottbuilding.com )
(602) 615-9749
EA Number
EA242
File Number
SF2624
Project Manager
Jen Uhler
Status
Active
Created
10/23/2025 11:22:17 AM

View: Project Documents | Submit/View Public Comment



Review Comments (28)

Link Agency Review # Comment
View EPC DPW Stormwater
10/9/2026 3:42:22 PM
1 CDs comments 10/9/2026 3:42:22 PM
View EPC DPW Stormwater
10/9/2026 3:40:50 PM
1 GEC Checklist 10/9/2026 3:40:50 PM
View EPC DPW Stormwater
10/9/2026 3:33:16 PM
1 Final Plat Page 2 Comments 10/9/2026 3:33:16 PM
View EPC DPW Stormwater
10/9/2026 3:32:55 PM
1 Final Plat comments 10/9/2026 3:32:55 PM
View EPC DPW Stormwater
10/9/2026 10:15:24 AM
1 SWMP Checklist Comments 10/9/2026 10:15:24 AM
View EPC DPW Stormwater
10/9/2026 10:13:29 AM
1 SWMP Comments 10/9/2026 10:13:29 AM
View EPC DPW Stormwater
10/9/2026 10:12:29 AM
1 PCM Applicability Form Comments 10/9/2026 10:12:29 AM
View EPC DPW Stormwater
10/9/2026 10:11:56 AM
1 GEC Comments 10/9/2026 10:11:56 AM
View EPC DPW Stormwater
10/9/2026 10:11:05 AM
1 ESQCP Comments 10/9/2026 10:11:05 AM
View EPC DPW Stormwater
10/9/2026 10:10:16 AM
1 Drainage Report Comments 10/9/2026 10:10:16 AM
View PCD Project Manager
10/8/2026 9:32:07 AM
1 Subdivision Improvement Agreement (PDF version) comments 10/8/2026 9:32:07 AM
View PCD Project Manager
10/8/2026 9:30:34 AM
1 Water Resources Report comments 10/8/2026 9:30:34 AM
View PCD Project Manager
10/8/2026 9:30:12 AM
1 Soils & Geology Report comments 10/8/2026 9:30:12 AM
View PCD Project Manager
10/8/2026 9:28:58 AM
1 Natural Features Report comments 10/8/2026 9:28:58 AM
View PCD Project Manager
10/8/2026 9:28:36 AM
1 Letter of Intent comments 10/8/2026 9:28:36 AM
View PCD Project Manager
10/8/2026 9:27:54 AM
1 Legal Description (MS WORD Version required) comments 10/8/2026 9:27:54 AM
View PCD Project Manager
10/8/2026 9:26:58 AM
1 Fire Protection Report comments 10/8/2026 9:26:58 AM
PCD Project Manager
10/8/2026 9:26:21 AM
1 PCD Planning has reviewed the proposal and provided comments on the following documents:
- Letter of Intent
- Final Plat Drawings (to be uploaded by Stormwater Engineer)
- Fire Protection Report
- Legal description
- Natural features report
- Soils and geology report
- Water Resources Report

Also uploaded here are Engineering Department's markups, on the following documents:
Subdivision Improvement Agreement (PDF version)
Missing: Traffic Impact Study
Missing: Financial Assurance Estimate (FAE) Form
Missing: Provide the RECORDED Shared Access easement for the private road and indicate the reception number on the Plat.

Please note that Stormwater Engineering Department will upload documents that may contain Planning, Engineering, and Stormwater Engineering comments. This is to provide you with one consolidated copy of our markups.

Jen Uhler
PCD Planner
719-520-7952
jenuhler@elpasoco.com
10/8/2026 9:26:21 AM
EPC DPW Stormwater
10/9/2026 3:42:40 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs
- Drainage Report
- ESQCP
- Final Plat
- GEC Plan
- GEC Checklist
- PCM Applicability Form
- SWMP
- SWMP Checklist

Upon the next submittal please provide:
- DMA
- FAE
- O&M

Note: If the GEC Plan is within the CDs you do not need to submit the document twice and can just submit the CDs. If that is the plan moving forward, please reach out to the planner and they can remove the GEC Plan slot.

Reviewed by:
Mikayla Hartford, P.E.
Senior Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
10/9/2026 3:42:40 PM
County Attorney - Water
10/5/2026 1:25:17 PM
1 Please upload all water documentation required in the El Paso County Land Development Code 8.4.7, to include at a minimum, Water Supply Information Summary, Water Resources Report and letter from the Colorado Division of Water agreeing that this project has adequate water. 10/5/2026 1:25:17 PM
View Colorado Geological Survey
10/5/2026 12:11:23 PM
1 10/5/2026 12:11:23 PM
EPC DPW Development Services - Engineering
10/7/2026 2:37:49 PM
1 SF2624 Blue Springs Meadow Minor Final Plat
EA242
EPC DPW DS- Engineering
Review 1


Engineering Comments have been provided on the following documents (to be uploaded by the Project Manager):

V1_Construction Drawings (Plans-Profiles)
V1_Drainage Report - Final
V1_Final Plat Drawings
V1_Final Plat Page 2
V1_Grading & Erosion Control (GEC) Plan
V1_Subdivision Improvement Agreement (PDF version)

Please consider completing a response letter / plans with your next submittal explaining how each comment was addressed (please copy and paste all comments to your response letter and respond below each comment). Please do not use the words done, fixed, etc. instead explain how you addressed each comment and indicate the sheet number.

Please email me at the email address indicated below for a TEAM’S RCR “Review Comment Resolution” meeting prior to resubmittal to make sure all comments are addressed, so that we can move this project forward to approval.

The applicant must upload the revised and missing items indicated below with his/her resubmittal:


V2_Construction Drawings (Plans-Profiles)
V2_Drainage Report - Final
V2_Final Plat Drawings
V2_Final Plat Page 2
V2_ Grading & Erosion Control (GEC) Plan
V2_Subdivision Improvement Agreement (PDF version)
V2_(Missing) No Traffic Impact Study
V2_(Missing) Financial Assurance Estimate (FAE) Form
V2_(Missing) Provide the RECORDED Shared Access easement for the private road and indicate the reception number on the Plat.

FYI:
1. The LOI was reviewed under EDARP number P2613.
2. County Access Permit is required.
3. The ECM Administrator will sign and date the plans, reports, and documents after you make your final submittal (make sure ALL comments are addressed before you make your final submittal and the plans, reports, and documents have no additional comments).

Reviewed by:

Jalal Saleh, PE, MBA, Senior Engineer
EPC DPW DS-Engineering
jalalsaleh@elpasoco.com
10/7/2026 2:37:49 PM
View County Attorney - Development Review
10/2/2026 11:00:27 AM
1 See attached edits to Subdivision Improvements Agreement.

Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
10/2/2026 11:00:27 AM
View Colorado Parks and Wildlife
9/30/2026 3:55:54 PM
1 9/30/2026 3:55:54 PM
View EPC Environmental Services
9/25/2026 1:09:08 PM
1 9/25/2026 1:09:08 PM
El Paso County Conservation Dist
9/23/2026 11:58:39 PM
1 The El Paso County Conservation District has reviewed this and we have the following comments:

1) Erosion controls

Looking at the plans, it appears that there is an existing stock pond that will be removed or filled in during the road construction period. They have mulching as a practice in their plans but no application rates. So we recommend the following added to the plans:

Disturbed areas be mulched after seeding with weed-free hay or straw mulch at approximately 5,000 lbs per acre due to the exposed site and its proneness to wind erosion and the drainage that leads across the adjacent property to the east of the site.



If this measure is added to the project's plan, then the El Paso County Conservation District will be content with the applicant's commitment to soil conservation, watershed protection, and protection of the surrounding community.

For any questions, please feel free to contact the EPCCD at 719-600-4706 or Will Vogl - Board VP at Will@EPCCD.org
9/23/2026 11:58:39 PM
Pikes Peak Regional Building Department
9/23/2026 7:39:46 AM
1 1. The existing address of 19225 Elliot View will not be used for this project.

2. An email from Justin Annan jannan@eptc911.org; or Glenn West gwest@eptc911.org;, with El Paso-Teller County E-9-1-1 Authority, reserving the street names is required to be emailed to the Enumerations department. Amy Vanderbeek Amy@pprbd.org; Brent Johnson Brent@pprbd.org; or Becky Allen BeckyA@pprbd.org

3. Provide a site plan showing all existing residences, out buildings, etc.. Enumerations will need to see these structures to know where they will be located for future lot development. The El Paso County Assessor’s database shows this lot as vacant.

4. Addressing will need to be assigned to each lot. Contact me directly, when you are ready to have the addressing assigned. Amy@pprbd.org
Once received the addressing will need to on the plat. Each address should be running parallel to the street they are being addressed from. Addressing should be as close to the edge of the lot as possible. This indicates and is made clear to anyone looking at the plat, which street the lot is addressed from.

5. Standard Final Plat comments:
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.

b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department.

c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt

d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
9/23/2026 7:39:46 AM
US Army Corps of Engineers
9/22/2026 8:51:08 AM
1 USACE has no comments. 9/22/2026 8:51:08 AM