Project Review Comments
- Project Name
- 1099 Wakita Dr - Permanent Occupancy of an ALQ
- Description
- 720 square foot detached ALQ.
- Location
- Parcels
- 5407111011 5407111011
- Applicant
-
Kristi Shuton
Kristi Shuton ( kshuton21@gmail.com )
(626) 278-8706 Kristi Shuton ( kshuton21@gmail.com )
(626) 278-8706 - File Number
- AL2526
- Project Manager
- Lisa Elgin
- Status
- Active
- Created
- 10/21/2025 9:14:40 AM
View: Project Documents
| Agency | Comment | ||
|---|---|---|---|
| View |
EPC Health Department
11/18/2025 9:19:43 AM |
11/18/2025 9:19:43 AM | |
| View |
PCD Project Manager
11/17/2025 4:22:38 PM |
See comments on Site Plan Drawing. | 11/17/2025 4:22:38 PM |
| View |
PCD Project Manager
11/17/2025 4:22:18 PM |
See comment on Road Impact Fee Acknowledgement. | 11/17/2025 4:22:18 PM |
| View |
PCD Project Manager
11/17/2025 4:21:53 PM |
See comment on Application. | 11/17/2025 4:21:53 PM |
| View |
PCD Project Manager
11/17/2025 4:21:30 PM |
See comments on Letter of Intent. | 11/17/2025 4:21:30 PM |
|
EPC DPW Stormwater
11/17/2025 12:13:16 PM |
Review 1: EPC DPW Stormwater comments has no comments, this project will not disturb more than an acre. Planner: no re-review necessary. Reviewed by: Mikayla Hartford, P.E. Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com |
11/17/2025 12:13:16 PM | |
| View |
EPC DPW Development Services - Engineering
11/17/2025 8:21:39 AM |
Blank Form - Road Impact Fee Acknowledgement Form | 11/17/2025 8:21:39 AM |
| View |
EPC DPW Development Services - Engineering
11/17/2025 8:09:22 AM |
Driveway access permit instructions | 11/17/2025 8:09:22 AM |
|
EPC DPW Development Services - Engineering
11/17/2025 8:20:42 AM |
Review 1. Engineering comments provided in blue on the following documents (to be uploaded by the project manager at a later date): - Letter of Intent - Site Plan Drawing - Road Impact Fee Acknowledgement Form Please note that a driveway access permit is not on file for the existing driveway. The home was constructed prior to this permit process and therefore the fee will be waived. A permit must be obtained prior to receiving a building permit. Please see the application instructions uploaded as a separate file. Feel free to contact me if you have any questions Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
11/17/2025 8:20:42 AM | |
| View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/10/2025 2:04:09 PM |
Action Item: Gas and electric meter locations on plan view and building elevations must be shown and labeled. If service lines from main dwelling, then show proposed connection. Action Item: Add note " Gas meters must be a minimum of 3-feet from doors, operable windows, or any vents or openings in walls.", if applicable. Action Item: Add note “CSU Field Engineer to determine final gas/electric meter and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions.” |
11/10/2025 2:04:09 PM |
|
Cherokee Metro Dist
11/5/2025 3:27:36 PM |
Service lines for water and wastewater for the new dwelling unit must be tied into your main house's existing service lines. The water service line becomes the residence owner's property after the curb box. The wastewater or sanitary sewer service line is the residence owner's property from the house until it reaches the sewer main or trunk in the middle of the culdesac | 11/5/2025 3:27:36 PM | |
|
PCD Administrative Notice
10/28/2025 9:34:58 AM |
On 10/28/2025, PCD mailed "Notice of Administrative Determination" letters for AL2526 to surrounding property owners within a 500-foot range (94 addresses). The potential date an administrative decision can be made is 11/11/2025. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $69.56. JM | 10/28/2025 9:34:58 AM |
EDARP