Project Name
Windermere Final Plat
Description
Location
Parcels
5329416011 5329416011
Applicant
Kimley-Horn
Kelly ( kelly@theequitygroup.net )
(719) 425-7088
Kelly ( kelly@theequitygroup.net )
(719) 425-7088
EA Number
EA21172
File Number
SF2530
Project Manager
Kylie Bagley
Status
Active
Created
9/15/2025 10:17:53 AM

View: Project Documents



Review Comments (24)

Link Agency Comment
Colorado Springs Airport Advisory Commission
11/20/2025 9:20:12 AM
This was reviewed and the notes approved by the Airport Advisory Commission on 11/19/2025.

• Avigation Easement: An avigation easement is requested or provide proof of previous recording (book/page or reception number).

• Airport Acknowledgment: Upon accepting residency within Windermere, all adult residents and occupants shall be required to sign a notice in which the tenant acknowledges that Windermere lies within an Airport Overlay Zone and is located less than 5 miles from Colorado Springs Municipal Airport and may, at times (24 hours per day), experience noise and other activities and operations associated with aircraft and the Airport. This is noted on Plat.

• FAA Form 7460-1: If use of temporary construction equipment will exceed 100 feet above ground level in height at this site, the applicant is to file an airspace evaluation case with the Federal Aviation Administration (FAA) and provide the results to the Airport before the commencement of construction activities; FAA’s website (https://oeaaa.faa.gov/oeaaa/external/portal.jsp).
11/20/2025 9:20:12 AM
View EPC DPW Development Services - Engineering
11/18/2025 9:27:22 AM
Final Plat comments 11/18/2025 9:27:22 AM
EPC DPW Development Services - Engineering
11/18/2025 9:27:04 AM
Review 1.

Engineering comments are PPR2442 Windermere Site Development Plan still remain to be addressed.

Engineering, Planning and Fire comments on the following documents:
- Final Plat

Additional Documents required on the next submittal:
- Construction Drawings.

Construction Drawings are required for all public improvements. Please include with the next submittal. This was made as a comment on the first review of associated PPR project.

Reviewed by:

Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
11/18/2025 9:27:04 AM
View PCD Project Manager
11/13/2025 2:23:40 PM
Fire protection report comments 11/13/2025 2:23:40 PM
View PCD Project Manager
11/13/2025 2:23:14 PM
Letter of Intent comments 11/13/2025 2:23:14 PM
View PCD Project Manager
11/13/2025 2:22:23 PM
Landscape Plan Comments 11/13/2025 2:22:23 PM
View Parks Advisory Board
11/13/2025 12:06:01 PM
El Paso County Parks Department, Final Comments - Please See Attached Documentation (Endorsed by the El Paso County Park Advisory Board on November 12, 2025) 11/13/2025 12:06:01 PM
View EPC Health Department
11/13/2025 8:39:31 AM
11/13/2025 8:39:31 AM
EPC Fire and Wildfire Program Manager
11/13/2025 7:32:09 AM
Fire Safety and Wildland Fire Mitigation Program comments added to the following documents:
-Final Plat
-Fire Protection Report
-Letter of Intent
-Landscape Plan

Roland Peterson
Fire Safety and Wildfire Mitigation Program Manager
Planning & Community Development
719.520.6075
rolandpeteson@elpasoco.com
11/13/2025 7:32:09 AM
PCD Project Manager
11/12/2025 3:37:04 PM
Final plat comments to be uploaded by engineering. 11/12/2025 3:37:04 PM
Colorado Geological Survey
11/12/2025 12:46:39 PM
The final plat now creates 104 single-family attached residential lots and two (2) tracts (Tracts A-B) for public improvements and utilities, private roads, parking and pedestrian facilities (sidewalks), drainage, landscaping, and open space uses. A preliminary subsurface soil investigation (RMG Engineers (RMG), dated October 8, 2024) was provided with this submittal. We previously reviewed the original soils and geology study (RMG, Revised January 18, 2021). The Soil & Geology Conditions note on the final plat (Drexel, Barrell & CO., September 5, 2025) should be updated to include RMG’s revised report.

Provided RMG’s recommendations are strictly adhered to, CGS has no objections to the approval of the final plat.

Submitted 11/12/2025 by Amy Crandall, P.E., Engineering Geologist, Colorado Geological Survey
acrandall@mines.edu
11/12/2025 12:46:39 PM
EPC DPW Stormwater
11/12/2025 10:52:32 AM
Review 1: See my PPR2442 comments from 10/28/2025 on the following documents, as edits to these documents have not yet been made per those October comments:
- Drainage Report
- GEC Plan
- PBMP Applicability Form

Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- ESQCP
- FAE

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
11/12/2025 10:52:32 AM
Colorado Springs Public Works
11/10/2025 1:40:34 PM
EDRD requests that the sidewalk and curb & gutter along N. Carefree be constructed to City standards, as this roadway is expected to be transferred to the City in the near future.

If this site is selected for pre-annexation, EDRD will require improvements along Antelope Ridge Drive to be constructed to full City standards.

A construction drawing must be submitted to EDRD for review and approval.

Reviewed by:
Hao Vo, P.E.
hao.vo@coloradosprings.gov
11/10/2025 1:40:34 PM
County Attorney - Development Review
11/10/2025 11:21:22 AM
No Comments from County Attorney – Development Review at this time.

Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com.
11/10/2025 11:21:22 AM
View Falcon Fire Protection District
11/7/2025 9:40:32 AM
11/7/2025 9:40:32 AM
County Attorney - Water
11/5/2025 4:35:58 PM
The Preliminary Plan Minor Amendment Phase 2 was reviewed in SP-22-3 and uploaded May 22, 2025. Let us know if anything else is needed. 11/5/2025 4:35:58 PM
View EPC Parks Department
11/3/2025 2:11:41 PM
El Paso County Parks Department, Preliminary Comments - Please See Attached Documentation (To be presented to the El Paso County Parks Advisory Board for consideration and endorsement on Wednesday, November 12th, 2025) 11/3/2025 2:11:41 PM
Colorado Springs Planning & Community Development
10/29/2025 10:56:29 AM
City Planning has no comment. 10/29/2025 10:56:29 AM
View EPC Environmental Services
10/29/2025 9:17:32 AM
10/29/2025 9:17:32 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/29/2025 8:19:25 AM
1. Please include utility easement per Rec. No. 224034825.
2. Please include CSU's Terms and Conditions per Rec. No. 224026331.
10/29/2025 8:19:25 AM
Colorado Springs Public Works
10/28/2025 8:49:00 AM
The developer is required to remit the amount of $150,000 for the future anticipated traffic signal at Antelope Ridge/North Carefree intersection.


Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
10/28/2025 8:49:00 AM
911 Authority - El Paso/Teller County
10/28/2025 7:41:52 AM
Comments for E911 as follows:

As private streets, the suffixes should be adjusted. Please use Grove, Heights, Point, or View.

Lake Windemere Ct – Available
Mereview Ln – Available
Winand Ct – Available

Lakemere Ct – Available. If desired, this loop can instead be a continuation of Mereview.

Thank you.
Justin
10/28/2025 7:41:52 AM
Pikes Peak Regional Building Department
10/24/2025 1:43:30 PM
1. Contact Enumerations when you are ready to addresses assigned to the area. If tract addressing is needed mark the exact locations where the addresss will be utilized using a addressing marker (xxx).
2. If underground service is needed prior to plat, submit a Utilities Addressing Plan (UAP), to Colorado Springs Utilities via the related link at https://www.csu.org/Pages/GISMapping.aspx For more information contact: Jade Swan jswan@csu.org
3. Standard Final Plat comments:
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.

b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department.

c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt

d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
10/24/2025 1:43:30 PM
Colorado Parks and Wildlife
10/23/2025 12:27:23 PM
No comment

Thank you
10/23/2025 12:27:23 PM