Project Review Comments

Back to List


File Number
SF263
Project Name
North Bay at Lake Woodmoor Final Plat (2025)
Description
Updated Final Plat for North Bay at Lake Woodmoor for 6 residential lots. Subject to PUD approval.
Parcels
7111400007 7111400007 7111404111 7111404111
Applicant
HR Green Inc.
Blaine Perkins ( blaine.perkins@hrgreen.com )
(719) 394-2430
Blaine Perkins ( blaine.perkins@hrgreen.com )
(719) 394-2430
EA Number
EA24135
File Number
SF263
Project Manager
Maria Lancto
Status
Active
Created
8/22/2025 1:48:52 PM

View: Project Documents | Submit/View Public Comment



Review Comments (5)

Link Agency Review # Comment
Colorado Geological Survey
2/18/2026 1:31:04 PM
1 Colorado Geological Survey (CGS) Review Comment – Resubmittal (Response #6)
File Number: SF263
Project: North Bay at Lake Woodmoor Final Plat
The January 27, 2026 Letter of Intent states under “Geologic Hazards” that no geologic hazards preclude development of the site and that the 2016 CTL|Thompson Soils and Geologic Hazard Report is being resubmitted with the application.
As stated in CGS resubmittal review comments dated December 16, 2025, and reiterated in CGS Response #5 dated February 2, 2026, the 2016 report was prepared for a materially different development configuration (28-unit layout with different grading, building envelopes, and floodplain interface). The current proposal consists of a revised 6-lot configuration with different building footprints, grading, access drives, and open space layout.
Because the development configuration has materially changed, the 2016 geologic hazards report is not technically applicable to the current PUD Development Plan and Final Plat. Density reduction alone does not establish geologic hazard adequacy under a revised layout.
No updated geologic hazards evaluation addressing the current development configuration has been submitted.
An updated geologic hazards evaluation prepared for the current configuration is required to complete CGS review. The updated report must evaluate site-specific geologic hazards under the current design, including groundwater conditions, slope stability, erosion potential, and any retaining structures.
Because the required updated geologic hazards evaluation has not been submitted, CGS cannot complete its review and cannot support approval of the current application. CGS review may proceed upon submittal and review of an updated geologic hazards evaluation prepared for the current development configuration.
Submitted 2/18/2026 by Jonathan R. Lovekin, Senior Engineering Geologist, Colorado Geological Survey, jlovekin@mines.edu
2/18/2026 1:31:04 PM
View EPC Environmental Services
2/18/2026 10:37:09 AM
1 2/18/2026 10:37:09 AM
Colorado Department of Transportation - Pueblo Office
2/18/2026 9:01:07 AM
1 CDOT has no comments regarding this development. 2/18/2026 9:01:07 AM
Road Impact Fee Administrator
2/18/2026 8:57:35 AM
1 victoriachavez@elpasoco.com
Please change the name of the document listed as "Road Impact Fee Credit Agreement." This is actually a "Road Impact Fee Acknowledgement Form." The credit agreement is a different document.

Thank you for updating the form name. No further comments at this time.
2/18/2026 8:57:35 AM
RBD Floodplain
2/17/2026 11:04:03 AM
1 show floodplain extents and BFE lines on plat.
seal and sign No rise certification form
2/17/2026 11:04:03 AM