Project Review Comments
- File Number
- COM2519
- Project Name
- Calvary fellowship
- Description
- We propose to add a 1,500 sf addition to the existing Sunday school building. We would propose to add a sidewalk that would wrap around the building on the west side as well.
- Location
- 4945 Cable Lane
- Parcels
- 6501312001 6501312001
- Applicant
-
YOW Architects PC
Brad Nichols ( bnichols@yowarch.com )
(719) 475-8133 Brad Nichols ( bnichols@yowarch.com )
(719) 475-8133 - File Number
- COM2519
- Project Manager
- Maria Lancto
- Status
- Closed
- Created
- 8/17/2025 6:25:09 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
|
PCD Project Manager
12/4/2025 4:05:04 PM |
3 | Site plan is approved. When submitting for building permits with PPRBD please submit the approved and stamped site plan. | 12/4/2025 4:05:04 PM | |
|
EPC DPW Development Services - Engineering
12/3/2025 3:33:50 PM |
3 |
Review 3. Engineering comments have been resolved on the site plan. No further review needed. Applicant Note: Parking striping on the ground within the Right of Way must be covered/removed to come into compliance with what is shown on the site plan. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
12/3/2025 3:33:50 PM | |
| View |
PCD Project Manager
11/5/2025 4:01:53 PM |
2 | V2_Site Plan Drawing | 11/5/2025 4:01:53 PM |
| View |
PCD Project Manager
11/5/2025 3:58:38 PM |
2 | V2_application | 11/5/2025 3:58:38 PM |
|
PCD Project Manager
11/5/2025 3:57:09 PM |
2 |
EPC Planning Review 2: Please see comments on the Site Plan and the Application. Thanks, Maria Lancto, AICP Senior Planner marialancto@elpasoco.com 712-520-6447 |
11/5/2025 3:57:09 PM | |
|
EPC DPW Development Services - Engineering
11/4/2025 12:46:06 PM |
2 |
Engineering Review 2. Engineering comments on the following documents (to be uploaded by project manager): - Site Plan Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
11/4/2025 12:46:06 PM | |
|
EPC DPW Stormwater
11/4/2025 7:17:36 AM |
2 |
Since there will be under 1 acre of soil disturbance during construction, EPC DPW Stormwater does not have any comments. EPC Project Manager: no re-review necessary. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com |
11/4/2025 7:17:36 AM | |
| View |
PCD Project Manager
8/21/2025 4:21:47 PM |
1 | LDC Sec. 5.2.50 Shipping Containers | 8/21/2025 4:21:47 PM |
| View |
PCD Project Manager
8/21/2025 4:20:13 PM |
1 | V1_Site Plan Drawing | 8/21/2025 4:20:13 PM |
| View |
PCD Project Manager
8/21/2025 4:19:50 PM |
1 | V1_Road Impact Fee Acknowledgement | 8/21/2025 4:19:50 PM |
|
PCD Project Manager
8/21/2025 4:18:47 PM |
1 |
Planning Review 1. Planning has comments on the following documents (to be uploaded by project manager): - V1_Site Plan Drawing Per the comments on the the above referenced site plan, I have also provided Section 5.2.50. If you have any question please do not hesitate to reach out. Reviewed by: Maria Lancto, AICP, Senior Planner marialancto@elpasoco.com (719) 520-6447 |
8/21/2025 4:18:47 PM | |
| View |
EPC DPW Development Services - Engineering
8/21/2025 11:35:40 AM |
1 | Driveway Access Permit Instructions | 8/21/2025 11:35:40 AM |
|
EPC DPW Development Services - Engineering
8/21/2025 11:40:20 AM |
1 |
Engineering Review 1. Engineering comments on the following documents (to be uploaded by project manager): - Road Impact Fee Acknowledgement Form A Driveway Access Permit is not on file for this property. Due to the construction year of the building, I believe the fee will be waived, but am confirming that with Inspections, but the application will need to be submitted either way. Please see instructions uploaded as a separate file and initiate this application prior to your next submittal. Feel free to contact me if you have any questions. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
8/21/2025 11:40:20 AM | |
|
EPC DPW Stormwater
8/20/2025 8:45:17 AM |
1 |
Since there will be under 1 acre of soil disturbance during construction, EPC DPW Stormwater does not have any comments. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com |
8/20/2025 8:45:17 AM |
EDARP