Project Review Comments

Back to List


File Number
ASB2552
Project Name
Retreat at TimberRidge Fil No. 3
Description
33 single-family detached lots total; 30 to be served by Central water & sewer, 6 lots to be served by Well and OWTS; 6 tracts and public ROW. 6 rural lots and 27 urban lots. 3 of the rural lots are on central water and the other three are on well.
Parcels
5221400001 5221400001 5227200006 5227200006 5227200007 5227200007 5227200008 5227200008 5228000039 5228000039
Applicant
Classic Consulting Engineers & Surveyors, LLC
PE Marc Whorton ( MWhorton@classicconsulting.net )
(719) 492-1220
PE Marc Whorton ( MWhorton@classicconsulting.net )
(719) 492-1220
File Number
ASB2552
Project Manager
Stormwater Mikayla Hartford
Status
Closed
Created
7/28/2025 1:18:18 PM

View: Project Documents



Review Comments (12)

Link Agency Review # Comment
EPC DPW Development Services - Inspections
3/19/2026 9:28:54 AM
2 No Comments from Inspections. 3/19/2026 9:28:54 AM
EPC DPW Development Services - Engineering
3/12/2026 11:37:30 AM
2 DPW Engineering review 2; comments have been addressed on the following documents

- Engineering Record Drawings (As-Builts)
- Public Improvement Certification Letter

Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
3/12/2026 11:37:30 AM
EPC DPW Stormwater
3/10/2026 4:24:38 PM
2 Review 2: EPC DPW Stormwater has no further comments. No re-review necessary.

Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
3/10/2026 4:24:38 PM
EPC DPW Asset Management
3/10/2026 7:05:07 AM
2 CAD passes inspection.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
3/10/2026 7:05:07 AM
View EPC DPW Stormwater
2/10/2026 5:05:23 PM
1 Utility Letter Comments 2/10/2026 5:05:23 PM
View EPC DPW Stormwater
2/10/2026 5:04:56 PM
1 Public Improvement Certification Letter Comments 2/10/2026 5:04:56 PM
EPC DPW Development Services - Inspections
2/10/2026 4:56:26 PM
1 DPW Inspections review 1 has comments on the following document

- Engineering Record Drawings (As-Builts)
- Public Improvement Certification Letter

Review by
Brad Walters
bradwalters@elpasoco.com
719-520-6819
2/10/2026 4:56:26 PM
EPC DPW Development Services - Engineering
2/9/2026 10:30:23 AM
1 DPW Engineering review 1 has comments on the following document

- Engineering Record Drawings (As-Builts)
- Public Improvement Certification Letter

Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
2/9/2026 10:30:23 AM
View EPC DPW Stormwater
2/10/2026 5:05:44 PM
1 PCM Certification Letter Comments 2/10/2026 5:05:44 PM
View EPC DPW Stormwater
2/10/2026 5:05:59 PM
1 As-built Comments 2/10/2026 5:05:59 PM
EPC DPW Stormwater
2/9/2026 9:09:01 AM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As-builts
- PCM Certification Letter

Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
2/9/2026 9:09:01 AM
EPC DPW Asset Management
1/20/2026 7:43:58 AM
1 CAD does not contain subdivision model linework. Please resubmit.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
1/20/2026 7:43:58 AM