Project Review Comments
- Project Name
- Hay Creek Valley
- Description
- o Subdivision: Combine and subdivide six existing parcels into (16) rural large lots of approximately 9-10 acre minimum size. o Zone: The existing zoning is RR-5 which shall remain. o Private road: Due to access constraints a single, centrally located access road will be incorporated as illustrated on the concept plan. This proposed access road is intended to private with a gated entry at Hay Creek and Snow Mountain Hts.
- Location
- 2855 HAY CREEK RD
- Parcels
- 7100000267 7100000267 7100000268 7100000268 7100000269 7100000269 7100000270 7100000270 7133000001 7133000001 7133007014 7133007014
- Applicant
- 
            Matrix Design Group, Inc.
                
 Drew Defendorf ( drew.defendorf@matrixdesigngroup.com )
 (325) 518-8579 Drew Defendorf ( drew.defendorf@matrixdesigngroup.com )
 (325) 518-8579
- File Number
- ASB2548
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 7/1/2025 1:50:11 PM
View: Project Documents
| Agency | Comment | ||
|---|---|---|---|
| View | EPC DPW Stormwater 10/21/2025 3:26:11 PM | Public Improvement Certification Letter | 10/21/2025 3:26:11 PM | 
| View | EPC DPW Stormwater 10/21/2025 3:25:56 PM | PCM Certification Letter | 10/21/2025 3:25:56 PM | 
| View | EPC DPW Stormwater 10/21/2025 3:25:24 PM | Engineering Record Drawings (As-Builts) | 10/21/2025 3:25:24 PM | 
| EPC DPW Development Services - Engineering 10/21/2025 3:24:54 PM | Engineering Review Ver.1 No engineering comments Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/ | 10/21/2025 3:24:54 PM | |
| EPC DPW Asset Management 10/21/2025 3:13:12 PM | These CAD plans are acceptable. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com | 10/21/2025 3:13:12 PM | |
| EPC DPW Stormwater 10/21/2025 3:24:30 PM | Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Engineering Record Drawings (As-Builts) - PCM Certification Letter - Public Improvement Certification Letter. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com | 10/21/2025 3:24:30 PM | 
 EDARP
                    EDARP