Project Review Comments
- File Number
- ASB2548
- Project Name
- Hay Creek Valley
- Description
- o Subdivision: Combine and subdivide six existing parcels into (16) rural large lots of approximately 9-10 acre minimum size. o Zone: The existing zoning is RR-5 which shall remain. o Private road: Due to access constraints a single, centrally located access road will be incorporated as illustrated on the concept plan. This proposed access road is intended to private with a gated entry at Hay Creek and Snow Mountain Hts.
- Location
- 2855 HAY CREEK RD
- Parcels
- 7100000267 7100000267 7100000268 7100000268 7100000269 7100000269 7100000270 7100000270 7133000001 7133000001 7133007014 7133007014
- Applicant
-
Matrix Design Group, Inc.
Drew Defendorf ( drew.defendorf@matrixdesigngroup.com )
(325) 518-8579 Drew Defendorf ( drew.defendorf@matrixdesigngroup.com )
(325) 518-8579 - File Number
- ASB2548
- Project Manager
- Stormwater Glenn Reese
- Status
- Closed
- Created
- 7/1/2025 1:50:11 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
|
EPC DPW Stormwater
12/9/2025 5:32:26 PM |
2 |
Review 2: EPC DPW Stormwater comments have been resolved on the following document(s): - Engineering Record Drawings (As-Builts) - PCM Certification Letter - Public Improvement Certification Letter. EPC DPW Stormwater has no further comments. Since all other reviewer’s comments have also been resolved, this ASB review process will be deemed complete. At this time, this ASB file will be marked as Approved/Closed on EDARP and no further action is required by the Applicant. Please finalize all other PA/FA Punchlist items. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
12/9/2025 5:32:26 PM | |
| View |
EPC DPW Stormwater
10/21/2025 3:26:11 PM |
1 | Public Improvement Certification Letter | 10/21/2025 3:26:11 PM |
| View |
EPC DPW Stormwater
10/21/2025 3:25:56 PM |
1 | PCM Certification Letter | 10/21/2025 3:25:56 PM |
| View |
EPC DPW Stormwater
10/21/2025 3:25:24 PM |
1 | Engineering Record Drawings (As-Builts) | 10/21/2025 3:25:24 PM |
|
EPC DPW Development Services - Engineering
10/21/2025 3:24:54 PM |
1 |
Engineering Review Ver.1 No engineering comments Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/ |
10/21/2025 3:24:54 PM | |
|
EPC DPW Asset Management
10/21/2025 3:13:12 PM |
1 |
These CAD plans are acceptable. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
10/21/2025 3:13:12 PM | |
|
EPC DPW Stormwater
10/21/2025 3:24:30 PM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Engineering Record Drawings (As-Builts) - PCM Certification Letter - Public Improvement Certification Letter. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
10/21/2025 3:24:30 PM |
EDARP