Project Review Comments

Back to List


Project Name
17050 S Peyton Hwy Hanover School District Bus Barn
Description
New bus barn and site improvements for Hanover School District No. 28.
Location
Parcels
3700000051 3700000051
Applicant
Kiowa Engineering Corporation
Todd Cartwright ( tcartwright@kiowaengineering.com )
(303) 692-0369
Todd Cartwright ( tcartwright@kiowaengineering.com )
(303) 692-0369
File Number
PPR2535
Project Manager
Maria Lancto
Status
Active
Created
6/27/2025 2:24:33 PM

View: Project Documents



Review Comments (14)

Link Agency Comment
View EPC Health Department
11/17/2025 2:53:55 PM
11/17/2025 2:53:55 PM
View PCD Project Manager
11/14/2025 4:00:55 PM
V1_Site Development Plan 11/14/2025 4:00:55 PM
View PCD Project Manager
11/14/2025 4:00:42 PM
V1_PCM Applicability Form 11/14/2025 4:00:42 PM
View PCD Project Manager
11/14/2025 4:00:28 PM
V1_Lighting Plan 11/14/2025 4:00:28 PM
View PCD Project Manager
11/14/2025 4:00:17 PM
V1_Letter of Intent 11/14/2025 4:00:17 PM
View PCD Project Manager
11/14/2025 4:00:07 PM
V1_Driveway Permit 11/14/2025 4:00:07 PM
View PCD Project Manager
11/14/2025 3:59:55 PM
V1_Drainage Letter 11/14/2025 3:59:55 PM
PCD Project Manager
11/14/2025 3:59:38 PM
Review 1: Please see the following documents for comments.
- V1_Drainage Letter
- V1_Driveway Permit
- V1_Letter of Intent
- V1_Lighting Plan
- V1_PCM Applicability Form
- V1_Site Development Plan

Maria Lancto, AICP
Senior Planner
marialancto@elpasoco.com
719-520-6447
11/14/2025 3:59:38 PM
EPC Fire and Wildfire Program Manager
11/14/2025 9:17:44 AM
Fire Safety and Wildfire Mitigation Program comments:

- The width of the gate must be 2’ wider than the roadway. Provide dimensions for both the roadway and the gate.
- Clarify how fire department access through the gate is being provided. Will Knox padlocks or key switches be provided?
- How will water for fire protection be provided? Are there existing hydrants or cisterns on site?

Roland Peterson
Fire Safety and Wildfire Mitigation Program Manager
Planning & Community Development
719.520.6075
rolandpeterson@elpasoco.com
11/14/2025 9:17:44 AM
EPC DPW Development Services - Engineering
11/14/2025 8:45:04 AM
Review 1
PPR2535:
S Peyton Hwy Hanover School District Bus Barn


Engineering comments on the following documents (to be uploaded by project manager):
- Drainage Report
- Driveway Permit Plan

Please upload the following documents with the next submittal:
- Drainage Report
- Driveway Permit Plan


Applicant Notes:

We are requesting a response letter with your next submittal explaining how each comment was addressed (please copy and paste all comments to your response letter and respond below each comment). Please do not use the words done, fixed, etc. instead explain how you addressed each comment.

Please call me at the phone number indicated below for a Review Comment Resolution “RCR” TEAMS meeting prior to submittal to make sure all comments are addressed, so that we can move this project forward to approval.

FYI:

1. The ECM Administrator will sign and date the drainage report after all the comments is addressed.
2. After approval of the Construction plans, the contractor shall obtain from EPC all necessary permits including the Driveway permit for the existing driveway.

Reviewed by:
Jalal Saleh, PE, MBA, Senior Engineer
jalalsaleh@elpasoco.com
(719) 520-7550
11/14/2025 8:45:04 AM
Pikes Peak Regional Building Department
11/12/2025 8:31:34 AM
Enumerations has the following comments:

1. Enumerations has no authority to require new addresses for new structures on school property, so, the building permit submittal for this carport structure can use the current school address of 17050 S. Peyton Hwy. If the school district would like a unique street address for this project, they should contact Enumerations and request a new address.

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
11/12/2025 8:31:34 AM
View EPC DPW Stormwater
11/6/2025 7:54:00 AM
PCM Applicability Form 11/6/2025 7:54:00 AM
EPC DPW Stormwater
11/5/2025 5:29:20 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- PCM Applicability Form
- Site Development Plan................. (To be uploaded by PM or DS Engineer)

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
11/5/2025 5:29:20 PM
View EPC Environmental Services
11/5/2025 11:12:43 AM
11/5/2025 11:12:43 AM