Project Review Comments

Back to List


File Number
SF2629
Project Name
Greaves Pinery Circle Subdivision
Description
This application requests approval of a subdivision (final plat) to create three residential lots. The proposed lots will be approximately 3 acres each. Additionally, the applicant is requesting to rezone the property to the RR-2.5 zoning district to accommodate the proposed lots under PCD File: P2615
Parcels
5205400041 5205400041
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA2559
File Number
SF2629
Project Manager
Joe Letke
Status
Active
Created
6/2/2025 1:44:40 PM

View: Project Documents | Submit/View Public Comment



Review Comments (23)

Link Agency Review # Comment
View PCD Project Manager
11/23/2026 3:16:15 PM
1 -V1 Soils and Geology Report comments 11/23/2026 3:16:15 PM
View PCD Project Manager
11/23/2026 3:15:55 PM
1 -V1 LOI Comments 11/23/2026 3:15:55 PM
View PCD Project Manager
11/23/2026 3:15:42 PM
1 -V1 Drainage Report Comments 11/23/2026 3:15:42 PM
View PCD Project Manager
11/23/2026 3:15:08 PM
1 -V1 Final Plat comments 11/23/2026 3:15:08 PM
View EPC DPW Stormwater
11/23/2026 2:10:37 PM
1 PCM Applicability Form comments 11/23/2026 2:10:37 PM
EPC DPW Stormwater
11/23/2026 2:09:06 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Drainage Report
- PCM Applicability Form

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
11/23/2026 2:09:06 PM
PCD Project Manager
11/23/2026 11:24:45 AM
1 Planning has comments on the following Version 1 documents:

-LOI
-Plat Drawings
-Soils and Geology Report

Joe Letke
Senior Planner
JoeLetke@elpasoco.com
11/23/2026 11:24:45 AM
Colorado Geological Survey
11/23/2026 10:17:21 AM
1 The site (39.0311°, -104.6875°) does not contain any geologic hazards or unusual geotechnical constraints that would preclude the proposed 3-lot residential subdivision, provided the identified constraints are appropriately addressed. The available referral documents include a Soil and Geology Study (Entech Engineering, Job No. 251507, November 21, 2025) and Final Plat (MVE, Inc., August 18, 2026). Entech states (p. 6), “No significant geologic hazards were identified on the site; however, the following constraints have been identified on the site: artificial fill, potentially expansive soils, seasonal shallow and shallow groundwater areas, drainage areas, shallow bedrock, and the potential for elevated radon levels.” CGS offers the following comments and recommendations.

1. Drainage areas: The site is not located within a FEMA-designated 100-year floodplain. However, the Kettle Creek drainage traverses the northwestern portion of the property. Entech states (p. 9) that “The most significant problems affecting development will be those associated with the drainages and potential shallow groundwater on site which can be avoided or mitigated.” The area associated with Kettle Creek is designated as a no-build area on the final plat. CGS agrees with avoiding development within this drainage area.

2. Shallow groundwater: Groundwater was not encountered in the test borings during drilling; however, groundwater was encountered in Test Pit No. 2 at a depth of approximately 2.5 feet, and redoximorphic features were observed in the test pits at depths ranging from 1.5 to 5 feet below grade. Test Pit No. 2 is located in the center of Lot 2, in the vicinity of the proposed residence and potential on-site wastewater treatment system (OWTS) location. Despite the shallow groundwater encountered at TP-2, this area is not identified as seasonally wet on Entech's Figure 6.

Entech recommends that buildings be located a minimum of 3 feet above groundwater levels and that septic fields not be placed in areas with potential shallow groundwater (pp. 7–8). CGS is concerned that groundwater conditions have not been adequately characterized to determine the suitability of the proposed building and OWTS locations, particularly on Lot 2. The feasibility of basement construction has also not been addressed.

CGS recommends that basements be prohibited unless a minimum one-year groundwater monitoring study is completed and demonstrates that seasonal groundwater levels can be adequately accommodated. Monitoring should extend through winter, spring, summer, and fall to characterize seasonal groundwater fluctuations, as groundwater observations obtained during a single geotechnical investigation may not represent seasonal high groundwater conditions. Groundwater conditions and their potential impacts on proposed building sites and OWTS locations should be evaluated prior to final plat approval.

3. Lot-specific geotechnical investigations: CGS agrees with Entech’s recommendation that “Investigation of the individual lots and building sites is recommended prior to construction” (p. 9). Once building locations have been identified and prior to building permit application, lot-specific geotechnical investigations consisting of drilling, sampling, laboratory testing, and engineering analysis should be completed to characterize soil and bedrock engineering properties, including density, strength, moisture content, and swell/consolidation potential. These investigations should provide site-specific foundation and drainage recommendations based on the proposed building configurations and subsurface conditions. Seasonal groundwater conditions should be characterized prior to final plat approval, as discussed in Comment 2.

Submitted 11/23/2026 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
11/23/2026 10:17:21 AM
El Paso County Conservation Dist
11/22/2026 5:34:03 PM
1 The El Paso County Conservation District has reviewed this application and we have no conservation related comments for this project at this time. 11/22/2026 5:34:03 PM
View Colorado Parks and Wildlife
11/20/2026 4:29:11 PM
1 Please find the attached comments from CPW. Thank you for the opportunity to review and comment on this project. 11/20/2026 4:29:11 PM
View Mountain View Electric Association, Inc.
11/20/2026 7:37:29 AM
1 Please see attached letter. 11/20/2026 7:37:29 AM
Black Forest Fire Protection District
11/19/2026 5:11:59 PM
2 Wildfire resiliency. The development is **Moderate/Class 2**. Black Forest Fire Rescue will enforce the 2025 Colorado Wildfire Resiliency Code for all three proposed homes. Under CWRC 403–404, builders must address Class A roofing, noncombustible gutters and downspouts, ember-resistant vents, protected eaves and soffits, and compliant siding, windows, exterior doors, and decks. Under 502–503, each owner must establish and maintain defensible space, including the first five feet around the home and beneath decks, vegetation spacing and pruning farther out, and compliant fencing near the home.

Fire apparatus access. Section 5.4 of the report addresses all-weather access, driveway clearances, turnarounds, and address markers. As each home is built, maintain year-round apparatus access and post the address at the driveway entrance where crews can see it from either direction on Pinery Circle.

Firefighting water supply. BFFR supports the proposed NFPA 13D residential sprinklers in all three homes. They can help control an interior fire before crews arrive. The report identifies the nearest hydrant at Burgess Road and Black Forest Road, approximately 3.4 miles away. That distance adds travel time to every tender refill. BFFR recommends evaluating a closer, reliable year-round water source to support sustained firefighting operations.
11/19/2026 5:11:59 PM
County Attorney - Water
11/19/2026 12:25:02 PM
1 County Attorney’s Office will review for water sufficiency following receipt of findings from the Colorado Division of Water Resources. Thank you. 11/19/2026 12:25:02 PM
EPC DPW Development Services - Engineering
11/20/2026 1:25:49 PM
1 SF2629 Greaves Pinery Circle Subdivision Review
P2615
EA2559
EPC DPW DS- Engineering
Review 1

Engineering Comments have been provided on the following documents (to be uploaded by Project Manager):


V1_Drainage Report - Final
V1_Final Plat Drawings
V1_ Letter of Intent
V1_Soils & Geology Report_1

Applicant Notes:

Please consider completing a response letter / plans with your next submittal explaining how each comment was addressed (please copy and paste all comments to your response letter and respond below each comment). Please do not use the words done, fixed, etc. instead explain how you addressed each comment and indicate the sheet number.

Please email me at the email address indicated below for a TEAM’S RCR “Review Comment Resolution” meeting prior to resubmittal to make sure all comments are addressed, so that we can move this project forward to approval.

The applicant must upload the revised and missing items indicated below with his/her resubmittal:

V2_Drainage Report - Final
V2_Final Plat Drawings
V2_ Letter of Intent
V2_Soils & Geology Report_1

FYI:
1. No TIS is required.
2. Construction Drawings (Plans-Profiles): N/A (no public and private improvements are required).
3. GEC Plan: N/A
4. Pinery Circle is a public Circle.
5. DS- Engineering will issue standalone driveway permit to each of the proposed lots (for a total of three standalone driveway permits).
6. The Road Impact Fee Acknowledgement form shall be submitted prior to building permit issuance.
7. The ECM Administrator will sign and date the plans, reports, and documents after you make your final submittal (make sure ALL comments are addressed before you make your final submittal and the plans, reports, and documents have no additional comments).

Reviewed by:

Jalal Saleh, PE, MBA, Senior Engineer
EPC DPW DS-Engineering
jalalsaleh@elpasoco.com
11/20/2026 1:25:49 PM
Black Forest Fire Protection District
11/18/2026 5:58:29 PM
1 1. **Correct the Fire Protection Report to match the final plat.** The April 13, 2026 Jensen Hughes report evaluates six acres at 7570 Pinery Circle and assumes three two-acre lots. The submitted final plat shows three approximately three-acre lots on **9.093 acres at 7520 Pinery Circle**, parcel 5205400041. Revise the combined Fire Protection, Wildland Fire, and Forestry Management Plans so the assessment boundary, figures, and findings cover all three platted lots. Update the code basis to BFFR’s adopted 2021 International Fire Code (IFC), applicable local amendments, and the 2025 Colorado Wildfire Resiliency Code (CWRC). Correct the reference to the ECFD Fire Marshal in § 5.3.

2. **Clarify the full buildout before determining the firefighting water supply.** Confirm whether these three homes represent the complete planned development. Identify prior divisions of the parent parcel and any additional residential lots planned on retained or adjoining land as part of the same development, including lots proposed through separate filings. If related lots are planned, show their location, total dwelling count, and any shared roads, access easements, or firefighting water sources. If these three lots are the complete buildout, state that in the report.

Revise §§ 5.2–5.3 to remove the blanket five-lot exemption. BFFR’s *Enhanced Rural Fire Water Regulations* guidance, §§ 4.1.5 and 5.6.1.2, allows BFFR to consider the overall development and to evaluate a split of four or fewer parcels as individual properties. **BFFR is not requesting a subdivision cistern based on this three-lot filing alone.** The report identifies a hydrant approximately 3.4 miles away and proposes hauled water. Explain how that operation would deliver the report’s calculated 4,284 gallons when the identified engine and tender initially carry 2,550 gallons combined. Identify the refill source, travel route, and how water delivery would be sustained. Document the assumptions used for the proposed sprinkler credit, including NFPA 13D protection, the 5,000-square-foot dwelling limit, and 50-foot separation from accessory structures.

3. **Correct the road and emergency-access description.** The final plat and construction statement identify **Pinery Circle** as the road serving all three lots. The Letter of Intent also refers to direct access from Black Forest Road and Coolwell Drive. Correct those references and show the responding apparatus route from **Swan Road via Pinery Drive to Pinery Circle**, including the proposed driveway entrance for each lot. Design and maintain the portions serving as fire apparatus access roads in accordance with 2021 IFC § 503 and applicable local amendments. Confirm that apparatus can reach each lot on an all-weather surface and that parking, gates, or other obstructions will preserve the required clear width and height.

4. **Address driveway length, turnarounds, and wildland apparatus access.** Retain Plat Note 14 requiring fire district review of applicable driveways. Revise Fire Protection Report § 5.4.3 to distinguish an ordinary residential driveway from a driveway needed for fire apparatus access. The report uses a 150-foot dead-end threshold in § 5.4.2 and a 300-foot turnaround threshold in § 5.4.3. Where a driveway serves as a dead-end fire apparatus access road and exceeds 150 feet, provide a BFFR-approved turnaround under IFC § 503.2.5. Once house locations are established, show the access distance to each dwelling, grades, clearances, and turnaround location where required.

Address **wildland response on the actual three-lot layout**. Show how responding apparatus can approach each home from Pinery Circle, position for structure protection, and turn around or withdraw while residents are leaving. Identify any narrow entrance, gate, or dead end that could restrict those movements. Describe how lot owners will maintain roadside and driveway vegetation so branches, regrowth, and overhanging limbs do not obstruct the apparatus route. Coordinate the approved Lot 1 entrance with PPRBD Enumerations so its posted address directs responders to the correct side of the lot.

5. **Apply wildfire mitigation to the full property.** Use **Moderate/Class 2** as the design basis pending BFFR confirmation across the corrected 9.093-acre boundary. If the applicant requests a different classification, submit the completed **Black Forest Fire Rescue Ground-Truthing Form**, the CWRC map with the final plat boundary, and supporting field documentation together for BFFR determination under CWRC § 304. Update the plan and plat notes to address the full Class 2 requirements under CWRC §§ 404 and 503. Cover Class A roof assemblies, gutters, vents, eaves and soffits, exterior walls, windows and doors, decks, and underfloor areas. Show how defensible space, landscaping, and fencing will be managed around each future dwelling and identify each owner’s responsibility for continued maintenance.
11/18/2026 5:58:29 PM
911 Authority - El Paso/Teller County
11/17/2026 8:52:03 AM
1 No action for E911 on this submittal.
Thank you.
Justin
11/17/2026 8:52:03 AM
PCD Administrative Notice
11/16/2026 2:01:08 PM
1 On 11/16/2026, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (18 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $14.04. JM 11/16/2026 2:01:08 PM
County Attorney - Development Review
11/12/2026 3:08:10 PM
1 No comment from County Attorney - Development Review at this time.

Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
11/12/2026 3:08:10 PM
Pikes Peak Regional Building Department
11/11/2026 11:19:12 AM
1 1. Is lot 1 allowed to access from the west side of the lot? If so, place another addressing marker (xxx) in this side of the lot. West side of lot 1 address is 7540, south side of lot 1 address is 7530, lot 2-7520, & lot 3-7510 Pinery Circle. Add the addresses to the plat.
2. Standard Final plat comment:
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.

b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department.

c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt

d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
11/11/2026 11:19:12 AM
View EPC Parks Department
11/9/2026 10:18:12 AM
1 The El Paso County Parks Department has reviewed the minor final plat and has attached comments and associated fees for the project.

Thank you.

Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6978
11/9/2026 10:18:12 AM
View EPC Environmental Services
11/3/2026 2:27:26 PM
1 11/3/2026 2:27:26 PM
Academy SD 20 Building Fund
11/2/2026 4:52:14 PM
1 Academy District 20 is in receipt of File #SF2629 for approval of the Greaves Pinery Circle Subdivision. The District does not object to this plan. The District is requesting fees in lieu of land dedication per the existing County Code, if applicable.

The District is able to serve each student who is a resident of District 20.

If you need additional information, please contact me.

Peter Ristig
Executive Director for Operations
Academy School District
Peter.ristig@asd20.org
11/2/2026 4:52:14 PM
Black Forest Land Use Committee
11/2/2026 1:31:17 PM
1 Once again this brings up the issue of subdividing a parcel that has already been platted. The issue is how this affects the rights of adjoining parcels who assumed that once a parcel is platted it will remain that density. New owners likely assume that the lots will remain the size of the original platting. We oppose replatting parcels such as this for this reason. 11/2/2026 1:31:17 PM