Project Review Comments

Back to List


File Number
P2615
Project Name
Greaves Pinery Circle - Rezone from RR-5 to RR-2.5
Description
This application requests rezoning of approximately 9.5 acres from the RR-5 zoning district to the RR-2.5 zoning district. The applicant is requesting approval of a subdivison (final plat) to create new lots under PCD File: SF2629
Parcels
5205400041 5205400041
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA2559
File Number
P2615
Project Manager
Joe Letke
Status
Active
Created
6/2/2025 1:19:18 PM

View: Project Documents | Submit/View Public Comment



Review Comments (16)

Link Agency Review # Comment
EPC Sheriff's Department
11/23/2026 2:43:17 PM
1 No comment from EPSO 11/23/2026 2:43:17 PM
View PCD Project Manager
11/23/2026 1:11:15 PM
1 -V1 Zoning Map Comments 11/23/2026 1:11:15 PM
View PCD Project Manager
11/23/2026 1:04:21 PM
1 -V1 Letter of Intent Comments 11/23/2026 1:04:21 PM
EPC DPW Stormwater
11/23/2026 7:48:22 AM
1 EPC DPW Stormwater has no comments on the rezone application.

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
11/23/2026 7:48:22 AM
El Paso County Conservation Dist
11/22/2026 5:35:01 PM
1 The El Paso County Conservation District has reviewed this zoning change request and we have no conservation related comments for this project at this time. 11/22/2026 5:35:01 PM
EPC DPW Development Services - Engineering
11/20/2026 1:15:37 PM
1 P2615 Greaves Pinery Circle Subdivision Review
SF2629
EA2559
EPC DPW DS- Engineering
Review 1

Engineering Comments have been provided on the following documents (to be uploaded by Project Manager):


V1_ Letter of Intent

Applicant Notes:

Please consider completing a response letter / plans with your next submittal explaining how each comment was addressed (please copy and paste all comments to your response letter and respond below each comment). Please do not use the words done, fixed, etc. instead explain how you addressed each comment and indicate the sheet number.

Please email me at the email address indicated below for a TEAM’S RCR “Review Comment Resolution” meeting prior to resubmittal to make sure all comments are addressed, so that we can move this project forward for approval.

The applicant must upload the revised and missing items indicated below with his/her resubmittal:

V2_ Letter of Intent

FYI:
1. No TIS is required.
2. Construction Drawings (Plans-Profiles): N/A (no public or private improvements are required).
3. GEC Plan: N/A
4. Pinery Circle is a public Circle (public Road).
5. DS- Engineering will issue standalone driveway permit to each of the proposed lots (for a total of three standalone driveway permits).
6. The Road Impact Fee acknowledgement form shall be submitted prior to building permit issuance.
7. The ECM Administrator will sign and date the plans, reports, and documents after you make your final submittal (make sure ALL comments are addressed before you make your final submittal and the plans, reports, and documents have no additional comments).

Reviewed by:

Jalal Saleh, PE, MBA, Senior Engineer
EPC DPW DS-Engineering
jalalsaleh@elpasoco.com
11/20/2026 1:15:37 PM
Black Forest Fire Protection District
11/18/2026 5:39:38 PM
1 Black Forest Fire Rescue has no objection to rezoning the 9.093-acre tract identified on the zoning exhibit, parcel 52054-00-041, from RR-5 to RR-2.5. The October 26, 2026 Letter of Intent describes three proposed residential lots of approximately 3.03 acres each, with individual driveways accessing Pinery Circle.

Please reconcile the project records before final plat approval. The zoning exhibit identifies 9.093 acres, while the EDARP rezoning record lists 22.56 acres and two parcel numbers. The companion subdivision record describes four lots, while the Letter of Intent describes three. Confirm the parcel boundaries and lot count covered by the subdivision Fire Protection Report.

BFFR will review the firefighting water supply, apparatus access from Pinery Circle, and wildfire mitigation under **SF2629**. The subdivision review will address the firefighting water source under 2021 IFC § 507 and the BFFR rural water requirements, apparatus access under 2021 IFC § 503, and the applicable CWRC structure-hardening and defensible-space requirements. If the applicant seeks a change to the mapped wildfire classification, submit the completed **Black Forest Fire Rescue Ground-Truthing Form** and supporting documentation to BFFR under CWRC § 304.
11/18/2026 5:39:38 PM
PCD Administrative Notice
11/16/2026 1:50:11 PM
1 On 11/16/2026, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (18 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $14.04. JM 11/16/2026 1:50:11 PM
Mountain View Electric Association, Inc.
11/16/2026 11:51:21 AM
1 MVEA has no comment at this time. 11/16/2026 11:51:21 AM
County Attorney - Development Review
11/12/2026 3:06:52 PM
1 No comments from County Attorney - Development Review at this time.

Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
11/12/2026 3:06:52 PM
Pikes Peak Regional Building Department
11/11/2026 10:49:04 AM
1 1. Enumerations has no comment towards rezones. Please do not send them to us.
Thank you

Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
11/11/2026 10:49:04 AM
PCD Project Manager
11/5/2026 2:32:06 PM
1 Planning has comments on the following Version 1 documents:

-Letter of Intent
-Zoning Map

Joe Letke
Senior Planner
JoeLetke@elpasoco.com
11/5/2026 2:32:06 PM
EPC Parks Department
11/5/2026 10:34:21 AM
1 The El Paso County Parks Department has reviewed this rezone proposal and has no objections to this rezone. The 2022 Parks Master Plan shows no impacts to existing or proposed parks, trails, or open space.

Regional park fees and impacts will be assessed upon review of the forthcoming platting action(s).

Thank you.

Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office: 719.520.6978
11/5/2026 10:34:21 AM
View EPC Environmental Services
11/3/2026 2:24:37 PM
1 11/3/2026 2:24:37 PM
Academy SD 20 Building Fund
11/2/2026 4:53:08 PM
1 Academy District 20 is in receipt of File #P2615 for approval of the Greaves Pinery Circle - Rezone from RR-5 to RR-2.5. The District does not object to this plan. The District is requesting fees in lieu of land dedication per the existing County Code, if applicable.

The District is able to serve each student who is a resident of District 20.

If you need additional information, please contact me.

Peter Ristig
Executive Director for Operations
Academy School District
Peter.ristig@asd20.org
11/2/2026 4:53:08 PM
Black Forest Land Use Committee
11/2/2026 1:33:26 PM
1 The Black Forest Land Use Committee is opposed to the rezone because 50 years of history and precedent has dictated that lot sizes in the Black Forest should be no smaller than 5 acres. The new county master plan reduces that lot size minimum to 2.5-acres but our committee still feels this was not a good change. 11/2/2026 1:33:26 PM