Project Review Comments
- File Number
- ASB2544
- Project Name
- Bent Grass Residential Filing No. 2 (includes everything but Pond WU modifications)
- Description
- 179 single-family homes Lot restrictions on Lots 34-37 at Southeast boundary to single story only
- Location
- Bent Grass Meadows Drive
- Parcels
- 5301000019 5301000019 5301000020 5301000020 5301000021 5301000021 5301000036 5301000036 5301000037 5301000037
- Applicant
-
Galloway & Company, Inc. Colorado Springs Office
Shared Galloway Email ( galloway-citycs@gallowayus.com )
(719) 900-7220 Shared Galloway Email ( galloway-citycs@gallowayus.com )
(719) 900-7220 - File Number
- ASB2544
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 5/22/2025 8:53:38 AM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
|
EPC DPW Development Services - Engineering
12/10/2025 1:58:50 PM |
2 |
Additional Development Services Engineering Comment for Review 1: At the intersection of Lemon Grass Road and Bent Grass Meadows Road intersection sight distance does not meet criteria along Bent Grass Meadows to the east. The retaining wall and fence that was constructed along the north side of Bent Grass Meadows Drive between Lemon Grass Road and Barley Court obstructs the intersection sight distance for vehicles turning from Lemon Grass Road. The required intersection sight distance in the AASHTO Green Book based upon a 40 mph design speed is 475’ (accounting for the TWLTL and measured from a decision point 14.5 feet from the edge of the traveled way). Current intersection sight distance measured in the field is approximately 350’. At the intersection of Berwyn Lane and Bent Grass Meadows Drive, sight distance does not meet criteria along Bent Grass Meadows Drive to the east. The shrubs and landscaping are obstructing the sight distance, and should be trimmed, as well as the fence along Bent Grass Meadows Drive that is also obstructing sight distance. The current intersection sight distance measured in the field is approximately 350'. Please submit solutions to the County for consideration as the current field conditions are not acceptable to the County for assuming ownership and maintenance of these roadways. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
12/10/2025 1:58:50 PM | |
|
EPC DPW Development Services - Inspections
12/3/2025 3:01:41 PM |
1 | All testing logs for both Asphalt and Concrete are for Falcon Meadows at Bent Grass Not Bent Grass Residential Filing 2 please upload the correct testing logs. | 12/3/2025 3:01:41 PM | |
| View |
EPC DPW Stormwater
11/25/2025 4:54:22 PM |
1 | Public Improvement Certification Letter | 11/25/2025 4:54:22 PM |
| View |
EPC DPW Stormwater
11/25/2025 4:54:08 PM |
1 | PCM Certification Letter and Revised MHFD Calcs | 11/25/2025 4:54:08 PM |
| View |
EPC DPW Stormwater
11/25/2025 4:53:36 PM |
1 | Engineering Record Drawings (As-Builts) | 11/25/2025 4:53:36 PM |
|
EPC DPW Development Services - Engineering
11/25/2025 1:52:22 PM |
1 |
Review 1. Engineering comments on the following documents (to be uploaded by the project manager): - As-built plans Applicant Note: Comments on page 16 of the plans may require recording additional public improvement easements. Please include with the next submittal. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
11/25/2025 1:52:22 PM | |
|
EPC DPW Stormwater
11/25/2025 4:52:49 PM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Engineering Record Drawings (As-Builts) - PCM Certification Letter and Revised MHFD Calcs - Public Improvement Certification Letter Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
11/25/2025 4:52:49 PM | |
|
EPC DPW Asset Management
11/17/2025 8:59:28 AM |
1 |
Inspection passed. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
11/17/2025 8:59:28 AM |
EDARP