Project Review Comments
- Project Name
- Cherokee Metro Well 22 and pipe line
- Description
- construction of a 200sf well house and a 2,300’ 6” pipeline- less then acre
- Location
- Parcels
- 3200000724 3200000724
- Applicant
-
Cherokee Metro District
Water Resource Engineer Brandon Zembles ( bzembles@cherokeemetro.org )
(719) 517-9289 Water Resource Engineer Brandon Zembles ( bzembles@cherokeemetro.org )
(719) 517-9289 - File Number
- COM2514
- Project Manager
- Kari Parsons
- Status
- Active
- Created
- 4/23/2025 11:44:53 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
PCD Project Manager
6/11/2025 12:06:46 PM |
Site Plan Comments review 1 | 6/11/2025 12:06:46 PM |
View |
PCD Project Manager
6/11/2025 12:06:00 PM |
Letter of Intent Comments (LOI) review 1 | 6/11/2025 12:06:00 PM |
EPC DPW Development Services - Engineering
6/11/2025 8:04:49 AM |
Discuss in the letter of intent construction traffic during the installation of the pipeline. If access to Ellicott Hwy is going to be required, a request for a permit needs to be submitted before construction begins. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
6/11/2025 8:04:49 AM | |
EPC DPW Stormwater
6/11/2025 12:00:38 PM |
Proposed disturbance is 0.85ac, so a thorough review of the GEC Plan was not completed, as an ESQCP is not needed. However, if during design or construction the disturbance exceeds 1ac then an ESQCP will be required, with all of the associated documents. EPC DPW Stormwater has no comments. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
6/11/2025 12:00:38 PM | |
Pikes Peak Regional Building Department
6/10/2025 11:01:47 AM |
Please provide a detailed site plan for this project so we can assign a proper address. Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
6/10/2025 11:01:47 AM |