Project Review Comments
- Project Name
- Falcon Fire #3 PPR
- Description
- Location
- Parcels
- 5312407001 5312407001
- Applicant
- 
            JPS Engineering, Inc.
                
 John Schwab ( john@jpsengr.com )
 (719) 477-9429 John Schwab ( john@jpsengr.com )
 (719) 477-9429
- File Number
- ASB2532
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 4/8/2025 11:37:48 AM
View: Project Documents
| Agency | Comment | ||
|---|---|---|---|
| View | EPC DPW Stormwater 5/27/2025 11:16:22 AM | PCM Certification Letter | 5/27/2025 11:16:22 AM | 
| View | EPC DPW Stormwater 5/27/2025 11:16:11 AM | Engineering Record Drawings (As-Builts) | 5/27/2025 11:16:11 AM | 
| EPC DPW Stormwater 5/27/2025 11:15:52 AM | Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Engineering Record Drawings (As-Builts) - PCM Certification Letter Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com | 5/27/2025 11:15:52 AM | 
 EDARP
                    EDARP