Project Review Comments

Back to List


Project Name
Murphy #24191 - Fontaine & Marksheffel PPR
Description
This is an application for a site development plan for a Murphy gas station.
Location
Parcels
5515413054 5515413054
Applicant
Galloway & Company, Inc. Colorado Springs Office
Shared Galloway Email ( galloway-citycs@gallowayus.com )
(719) 900-7220
Shared Galloway Email ( galloway-citycs@gallowayus.com )
(719) 900-7220
EA Number
EA2531
File Number
PPR2523
Project Manager
Lisa Elgin
Status
Active
Created
3/19/2025 1:27:09 PM

View: Project Documents



Review Comments (29)

Link Agency Comment
View PCD Project Manager
8/22/2025 12:07:36 PM
See comments on SWMP. 8/22/2025 12:07:36 PM
View PCD Project Manager
8/22/2025 12:06:37 PM
See comments on PCM Applicability. 8/22/2025 12:06:37 PM
View PCD Project Manager
8/22/2025 12:05:53 PM
See comments on Grading and Erosion Control Plan. 8/22/2025 12:05:53 PM
View PCD Project Manager
8/22/2025 12:04:51 PM
See comments on Financial Assurances Estimate. 8/22/2025 12:04:51 PM
View PCD Project Manager
8/22/2025 12:04:16 PM
See comments on ESQCP. 8/22/2025 12:04:16 PM
View PCD Project Manager
8/22/2025 12:03:51 PM
See comments on Final Drainage Report. 8/22/2025 12:03:51 PM
View EPC DPW Stormwater
8/21/2025 3:34:47 PM
SWMP Checklist (Current version with comments) 8/21/2025 3:34:47 PM
View EPC DPW Stormwater
8/21/2025 3:33:58 PM
GEC Checklist (Current version with comments) 8/21/2025 3:33:58 PM
View Mountain View Electric Association, Inc.
8/21/2025 10:41:27 AM
See attached Comment Letter 8/21/2025 10:41:27 AM
View Widefield SD 3
8/20/2025 3:53:58 PM
8/20/2025 3:53:58 PM
Colorado Springs Public Works
8/20/2025 1:12:49 PM
EDRD requires improvements along Marksheffel Rd, including the installation of a sidewalk, curb and gutter, and other applicable infrastructure.

Reviewed by Hao Vo, P.E.
hao.vo@coloradosprings.gov
8/20/2025 1:12:49 PM
View Security Fire Protection District
8/18/2025 3:58:43 PM
Need to show the fire protection water supply. Fire lanes will be required. Please see attached. 8/18/2025 3:58:43 PM
EPC DPW Stormwater
8/18/2025 11:23:54 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Drainage Report
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- PCM Applicability Form
- SWMP
- SWMP Checklist

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com

Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
8/18/2025 11:23:54 AM
PCD Project Manager
8/13/2025 1:49:57 PM
Due to technical difficulties with EDARP, this is only a portion of the V1 comments. The remainder of the comments are due 8/22 and all documents with additional comments will be uploaded again. 8/13/2025 1:49:57 PM
View PCD Project Manager
8/13/2025 1:48:04 PM
See comments on Traffic Memo. 8/13/2025 1:48:04 PM
View PCD Project Manager
8/13/2025 1:47:42 PM
See comments on Site Development Plan. 8/13/2025 1:47:42 PM
View PCD Project Manager
8/13/2025 1:47:23 PM
See comments on Parking Plan. 8/13/2025 1:47:23 PM
View PCD Project Manager
8/13/2025 1:47:06 PM
See comments on Lighting Plan. 8/13/2025 1:47:06 PM
View PCD Project Manager
8/13/2025 1:46:47 PM
See comments on Letter of Intent. 8/13/2025 1:46:47 PM
View PCD Project Manager
8/13/2025 1:46:21 PM
See comments on Landscape Plan. 8/13/2025 1:46:21 PM
View PCD Project Manager
8/13/2025 1:46:00 PM
See comments on Floor Plan. 8/13/2025 1:46:00 PM
View PCD Project Manager
8/13/2025 1:45:39 PM
See comments on FAE. 8/13/2025 1:45:39 PM
View PCD Project Manager
8/13/2025 1:45:20 PM
See comments on Elevations. 8/13/2025 1:45:20 PM
View PCD Project Manager
8/13/2025 1:44:59 PM
See comments on Drainage Report - Final 8/13/2025 1:44:59 PM
View PCD Project Manager
8/13/2025 1:44:35 PM
See comments on Application. 8/13/2025 1:44:35 PM
EPC Parks Department
8/12/2025 1:48:53 PM
El Paso County Parks Department. The 2022 El Paso County Parks Master Plan shows this project impacting the proposed Crews Gulch Primary Regional Trail, which runs west-east along the north side of Fontaine Boulevard, commencing far to the southeast at its intersection with the Fountain Creek Regional Trail and terminating at its intersection with the Jimmy Camp Creek Regional Trail in the nearby Lorson Ranch development. A review of aerial photography showed a 6'-wide detached and meandering concrete sidewalk along the north side of Fontaine Boulevard at this location. This sidewalk will suffice for the location of the Crews Gulch Regional Trail and therefore, no trail easement is necessary for this section of trail which already allows for public multi-modal pedestrian access. As this is a commercial application, no regional park fees will be assessed, however an update to the EPC Land Development Code over the next year and half may or may not change this fee requirement. At this time, EPC Parks has no objections to this development. Thank you! 8/12/2025 1:48:53 PM
EPC DPW Development Services - Engineering
8/11/2025 1:24:29 PM
DPW Engineering review 1 has comments on the following documents

- Drainage Report - Final
- Traffic Memo
- Letter of Intent
- FAE

Review by
Bret Dilts, PE
bretdilts@elpasco.com
719-520-6864
8/11/2025 1:24:29 PM
Colorado Springs Public Works
8/11/2025 8:41:31 AM
The northbound right turn laned at Marksheffel Road/Site Access will need to be incorporated into the Civil Drawings and conform to standards of the City of Colorado Springs and the Manual on Uniform Traffic Control Devices (MUTCD).

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
8/11/2025 8:41:31 AM
Pikes Peak Regional Building Department
7/29/2025 2:48:20 PM
1. Address to the store will be 9622 Fontaine Blvd. Gas canopy address 9620 Fontaine Blvd.
2. The trash enclosure exceeds 7’ therefore, a separate address will need to be assigned along with a separate permit. Address is 9624 Fontaine Blvd.

Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
7/29/2025 2:48:20 PM