Project Review Comments
- Project Name
- 11020 Teachout Road New Stealth Tower
- Description
- Special Use to allow a new 75-foot-tall CMRS stealth tower in the RR-5 (Residential Rural) zoning district. Exceeding the maximum height within RR-5 will be part of the Special Use. *IF* the applicant needs to reduce the use-specific setback of tower height + 10', this will elevate the application to the PC/BOCC hearing process. -- Details from applicant: Vertical Bridge (VB) is proposing a new 75' monopine Commercial Mobile Radio Service (CMRS) Facility with Verizon Wireless as the primary tenant. Construction of telecommunications and public utility facility, consisting of cell tower, space for carrier equipment, and a utility backboard will be within a fenced compound. No water or sewer is proposed. This will be an unmanned facility.
- Location
- Parcels
- 5220005032 5220005032
- Applicant
- 
            Telesite Solutions, LLC
                
 Darren Hunter ( dhunterwireless@gmail.com )
 (913) 634-1245 Darren Hunter ( dhunterwireless@gmail.com )
 (913) 634-1245
- EA Number
- EA2525
- File Number
- AL2524
- Project Manager
- Miranda Benson
- Status
- Active
- Created
- 3/19/2025 11:48:54 AM
View: Project Documents
| Agency | Comment | ||
|---|---|---|---|
| View | Mountain View Electric Association, Inc. 10/29/2025 9:28:59 AM | See attached comment letter | 10/29/2025 9:28:59 AM | 
| View | EPC Health Department 10/29/2025 8:45:14 AM | 10/29/2025 8:45:14 AM | |
| View | PCD Project Manager 10/24/2025 3:47:06 PM | V1_Site Plan Drawing_COMMENTS | 10/24/2025 3:47:06 PM | 
| View | PCD Project Manager 10/24/2025 2:10:32 PM | V1_Letter of Intent_COMMENTS | 10/24/2025 2:10:32 PM | 
| View | PCD Project Manager 10/24/2025 2:10:20 PM | V1_Photo Simulation_COMMENTS | 10/24/2025 2:10:20 PM | 
| View | PCD Project Manager 10/24/2025 2:10:04 PM | V1_Legal Description_COMMENTS | 10/24/2025 2:10:04 PM | 
| View | PCD Project Manager 10/24/2025 2:09:48 PM | V1_Application_COMMENTS | 10/24/2025 2:09:48 PM | 
| PCD Project Manager 10/24/2025 2:11:49 PM | V1_Planning review complete. Comments were added to the following documents: - Application (needs to be signed) - Legal Description - Photo Simulations (last image) - Letter of Intent - Site Plan Drawing A document titled "V1_PLANNING CHECKLIST" has also been uploaded. Please feel free to use this for reference. This does not need to be returned. If a modification to the *use-specific* setback standard is requested, please add this to the Letter of Intent. This will push the project to the BOCC for approval, as the Administrative Relief section of the Code does not give the Director authority to grant modifications to use-specific dimensional variances. Please Note - Following the Special Use application, a Site Development Plan review will be required. This has already been created for you in EDARP after the EA Meeting was completed. This will be the TWR- prefix file type. With this project, several additional documents will be required (removal agreement, financial assurance, etc.). For the next Special Use document submission, please add: - FCC Compliance Verification Thank you, Miranda Benson MirandaBenson2@elpasoco.com | 10/24/2025 2:11:49 PM | |
| View | PCD Project Manager 10/24/2025 2:04:03 PM | V1_PLANNING CHECKLIST | 10/24/2025 2:04:03 PM | 
| EPC DPW Stormwater 10/22/2025 5:28:37 PM | Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document (to be uploaded by the project manager): - Site Plan At the site development plan stage please provide a grading plan and drainage letter for the site. Reviewed by: Mikayla Hartford, P.E. Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com | 10/22/2025 5:28:37 PM | |
| EPC DPW Development Services - Engineering 10/21/2025 3:12:45 PM | Review 1. Engineering comments on the following documents (to be uploaded by the project manger): - Letter of Intent - Site Plan Drawing El Paso County Road Impact Fees are applicable and will be due prior to the approval of the TWR application. Fees will be $9.68. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 | 10/21/2025 3:12:45 PM | |
| Black Forest Fire Protection District 10/18/2025 5:34:59 PM | BFFRPD (Black Forest Fire Rescue Protection District) has reviewed the proposed project. There are no areas for concern at this time due to the project being a communications tower. | 10/18/2025 5:34:59 PM | |
| View | EPC Environmental Services 10/3/2025 10:52:13 AM | 10/3/2025 10:52:13 AM | |
| PCD Administrative Notice 10/1/2025 3:22:14 PM | On 10/01/2025, PCD mailed "Notice of Administrative Determination" letters for AL259 to surrounding property owners within a 500-foot range (24 addresses). The potential date an administrative decision can be made is 10/15/2025. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $17.76 JM | 10/1/2025 3:22:14 PM | 
 EDARP
                    EDARP