Project Review Comments
- File Number
- SF2518
- Project Name
- River Bend Residential Final Plat Filing No. 2 (Updated 2025)
- Description
- See previous file approvals SP187, SF1844, and SF1843.
- Parcels
- 6514100033 6514100033 6514100034 6514100034
- Applicant
-
Avatar Riverbend LP
galloway-citycs@gallowayus.com galloway-citycs@gallowayus.com galloway-citycs@gallowayus.com ( galloway-citycs@gallowayus.com ) galloway-citycs@gallowayus.com galloway-citycs@gallowayus.com galloway-citycs@gallowayus.com ( galloway-citycs@gallowayus.com ) - EA Number
- EA2513
- File Number
- SF2518
- Project Manager
- Kylie Bagley
- Status
- Active
- Created
- 2/19/2025 10:35:38 AM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
| View |
PCD Engineering Division
12/5/2025 1:22:42 PM |
2 | FAE comments | 12/5/2025 1:22:42 PM |
| View |
PCD Engineering Division
12/5/2025 1:22:27 PM |
2 | CD's comments | 12/5/2025 1:22:27 PM |
|
PCD Engineering Division
12/5/2025 1:21:18 PM |
2 |
Review 2 comments on the following documents will be uploaded: -CD's -FAE See River Bend Residential Final Plat Filing No. 1 (file number: SF2517) for all other EPC Development Services comments on submitted documents. reviewed by: Daniel Torres danieltorres@elpasoco.com |
12/5/2025 1:21:18 PM | |
|
PCD Project Manager
12/5/2025 9:39:33 AM |
2 | No further planning comments | 12/5/2025 9:39:33 AM | |
| View |
EPC Stormwater Review
12/4/2025 2:18:14 PM |
2 | ESQCP | 12/4/2025 2:18:14 PM |
|
EPC Stormwater Review
12/4/2025 2:17:36 PM |
2 |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - CDs.................................(To be uploaded by DS Engineer) - ESQCP Form - FAE form.........................(To be uploaded by DS Engineer) Please provide the following document(s) upon resubmittal (the planner will need to send an upload request): - Plat (the plat drawings previously submitted are for filing 1) See River Bend Residential Final Plat Filing No. 1 (file number: SF2517) for EPC Stormwater comments on the drainage report. Notes: - Ensure documents that are used for both filings are labeled "Filing No. 1 & 2" (not just filing 1) and documents specific to this project are labeled "Filing No. 2" so that documentation is consistent. PCD File numbers should also match the labels, if both are listed both file numbers should be as well. - Filing 1 and 2 have submitted identical PCM documents for the proposed pond with this development. Only the development that the pond will be constructed with requires the DMA and O&M manual. If the pond or orifice plate is being modified then the MHFD/SDI calcs would still be required. If the pond is not being constructed or modified with filing 2 then do not submit the following documents at next submittal: - PCM maintenance agreement - PCM O&M manual - MHFD-Detention Basin Design Workbook or applicable drain time calculations Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com 6/25/2025 7:04:47 AM |
12/4/2025 2:17:36 PM | |
|
County Attorney - Development Review
12/3/2025 9:37:22 AM |
2 |
My comments from 6/25/25 with respect to the SIA have not been addressed Also because the previous DMA was approved by the Board, it should be used unless circumstances have changed justifying amendments. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com. |
12/3/2025 9:37:22 AM | |
|
PCD Project Manager
6/27/2025 7:44:47 AM |
1 | Please update Letter of Intent to reflect current Final Plat application, not previously approved applications. | 6/27/2025 7:44:47 AM | |
|
PCD Engineering Division
6/26/2025 4:25:05 PM |
1 |
Review 1 comment: Please submit Filing 2 Construction Documents for review. FAE for filing 2 will be reviewed once Filing 2 CD's are submitted. See River Bend Residential Final Plat Filing No. 1 (file number: SF2517) for all other EPC Development Services comments on submitted documents. reviewed by: Daniel Torres danieltorres@elpasoco.com |
6/26/2025 4:25:05 PM | |
| View |
County Attorney - Development Review
6/25/2025 9:50:50 AM |
1 |
See edits to attached SIA. The Detention Basin Maintenance Agreement was approved by the Board in connection with the previous final plat application. The Agreement needs to be separated from the resolution and staff memo and recorded as a stand-alone document along with this plat. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com. |
6/25/2025 9:50:50 AM |
|
EPC Stormwater Review
6/25/2025 7:04:47 AM |
1 |
See River Bend Residential Final Plat Filing No. 1 (file number: SF2517) for EPC Stormwater comments on submitted documents. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
6/25/2025 7:04:47 AM |
EDARP