Project Review Comments
- Project Name
- Glen Aspen Dam Access Roads
- Description
- The City of Woodland Park City is constructing an off-line reservoir at Glen Aspen Ranch, in El Paso County. The land is owned by the Scouts of America. The City will construct primary and secondary access roads to access the reservoir.
- Location
- 11050 Loy Creek Rd, Woodland Park
- Parcels
- 8200000060 8200000060 8200000064 8200000064
- Applicant
-
RESPEC - JDS-Hydro Consultants, Inc.
Kelly Bivens ( kelly.bivens@respec.com )
(719) 402-0022 x1439 Kelly Bivens ( kelly.bivens@respec.com )
(719) 402-0022 x1439 - EA Number
- EA258
- File Number
- CDR2512
- Project Manager
- Daniel Torres
- Status
- Active
- Created
- 2/5/2025 3:11:08 PM
View: Project Documents
| Agency | Comment | ||
|---|---|---|---|
| View |
EPC Stormwater Review
11/18/2025 5:30:19 PM |
SWMP Checklist | 11/18/2025 5:30:19 PM |
| View |
EPC Stormwater Review
11/18/2025 5:29:57 PM |
SWMP | 11/18/2025 5:29:57 PM |
| View |
EPC Stormwater Review
11/18/2025 5:29:28 PM |
PCM Applicability Form | 11/18/2025 5:29:28 PM |
| View |
EPC Stormwater Review
11/18/2025 5:29:05 PM |
GEC Checklist | 11/18/2025 5:29:05 PM |
| View |
EPC Stormwater Review
11/18/2025 5:28:48 PM |
GEC Plan | 11/18/2025 5:28:48 PM |
| View |
EPC Stormwater Review
11/18/2025 5:28:19 PM |
FAE Comments | 11/18/2025 5:28:19 PM |
| View |
EPC Stormwater Review
11/18/2025 5:28:03 PM |
ESQCP Comments | 11/18/2025 5:28:03 PM |
| View |
EPC Stormwater Review
11/18/2025 5:27:07 PM |
Drainage Report Comments | 11/18/2025 5:27:07 PM |
| View |
PCD Engineering Division
11/18/2025 4:42:54 PM |
Letter of Intent comments | 11/18/2025 4:42:54 PM |
|
PCD Engineering Division
11/18/2025 4:42:30 PM |
Review 1. Engineering comments on the following documents: - Letter of Intent - Drainage Report ...................to be uploaded by Stormwater Engineering - GEC Plan ..............................to be uploaded by Stormwater Engineering - FAE .......................................to be uploaded by Stormwater Engineering Due to the volume and nature of comments, additional comments may be expected on the next review. Project Manager, please provide a 21-day review period. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
11/18/2025 4:42:30 PM | |
|
EPC Stormwater Review
11/18/2025 5:24:09 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Drainage Report - ESQCP - FAE - GEC Plan - GEC Checklist - PCM Applicability Form - SWMP - SWMP Checklist Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com Mikayla Hartford, P.E. Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com |
11/18/2025 5:24:09 PM | |
|
RBD Floodplain
10/27/2025 12:37:53 PM |
site not in the floodplain, no comment | 10/27/2025 12:37:53 PM |
EDARP