Project Review Comments

Back to List


Project Name
Bent Grass Meadows Drive/Woodmen Frontage Road
Description
Intersection improvements to include turn lanes, anticipated to fit within existing ROW.
Location
Applicant
Challenger Homes Land Development
Erin Smith ( esmith@challengerhomes.com ) Erin Smith ( esmith@challengerhomes.com )
File Number
ASB253
Project Manager
Stormwater Glenn Reese
Status
Active
Created
1/16/2025 2:26:12 PM

View: Project Documents



Review Comments (5)

Link Agency Comment
PCD Engineering Inspections
9/18/2025 1:43:27 PM
No comments from inspections 9/18/2025 1:43:27 PM
EPC DPW Asset Management
9/18/2025 10:18:38 AM
Please update the CAD so it’s in Colorado State Plane Central zone and include horizontal control points.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
9/18/2025 10:18:38 AM
View PCD Engineering Division
9/18/2025 8:34:07 AM
As-Built drawing comments 9/18/2025 8:34:07 AM
PCD Engineering Division
9/18/2025 8:32:58 AM
Review 1.

Engineering comments provided on the following document in blue:
- As-Built Drawing

Please include with next submittal:
- Road Certification Letter

Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
9/18/2025 8:32:58 AM
EPC Stormwater Review
9/17/2025 8:57:37 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following document, to be uploaded in the next day or two by Joe with EPC - DPW - Development Services:
- Engineering Record Drawings (As-Builts)

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
9/17/2025 8:57:37 AM