Project Review Comments

Back to List


Project Name
Red Rock Valley Estates Water District Water Transmission Lines
Description
Install water transmission lines along existing utility corridors between the Keeton Water Treatment Plant and the Tallent Well, one potable water line for redundancy and one raw water line for more production, no development is proposed, no grading is proposed - The disturbed area is going to be more than one acre, so I’m expecting the County will want a SWMP, ESQCP, and such.
Location
Parcels
7602400009 7602400009 7611002025 7611002025
Applicant
Terra Nova Engineering, Inc.
L Doucette ( luanne.rubey@tnesinc.com )
(719) 499-6422
L Doucette ( luanne.rubey@tnesinc.com )
(719) 499-6422
EA Number
EA24120
File Number
CDR249
Project Manager
Charlene Durham
Status
Active
Created
11/6/2024 4:00:22 PM

View: Project Documents



Review Comments (12)

Link Agency Comment
View PCD Engineering Division
4/29/2025 1:20:29 PM
Letter of Intent comments 4/29/2025 1:20:29 PM
View PCD Engineering Division
4/29/2025 1:09:34 PM
Grading and Erosion Control Plan comments 4/29/2025 1:09:34 PM
View PCD Engineering Division
4/29/2025 1:09:09 PM
Financial Assurance Estimate comments 4/29/2025 1:09:09 PM
View PCD Engineering Division
4/29/2025 1:08:47 PM
Construction Drawings comments 4/29/2025 1:08:47 PM
PCD Engineering Division
4/29/2025 1:08:16 PM
Development Services Engineering Review 1.

Comments on the following documents:
- Construction Drawings
- Financial Assurance Estimate
- Letter of Intent

Stormwater Engineering comments on the following documents:
- Grading and Erosion Control Plan

Note: Due to the nature and scope of comments, additional comments may be expected on the next review.

Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314

Charlene Durham, PE, Principal Engineer
charlenedurham@elpasoco.com
(719) 520-7951
4/29/2025 1:08:16 PM
View EPC Stormwater Review
4/28/2025 4:18:03 PM
SWMP Checklist 4/28/2025 4:18:03 PM
View EPC Stormwater Review
4/28/2025 4:17:50 PM
SWMP 4/28/2025 4:17:50 PM
View EPC Stormwater Review
4/28/2025 4:17:37 PM
PCM Applicability Form 4/28/2025 4:17:37 PM
View EPC Stormwater Review
4/28/2025 4:17:22 PM
ESQCP 4/28/2025 4:17:22 PM
EPC Stormwater Review
4/28/2025 12:35:34 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- ESQCP
- FAE.......................(to be uploaded with Development Services comments)
- GEC Plan...............(to be uploaded with Development Services comments)
- PCM Applicability Form
- SWMP
- SWMP Checklist

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
4/28/2025 12:35:34 PM
Colorado Department of Transportation - Pueblo Office
4/15/2025 9:23:19 AM
CDOT has no comment regarding this submittal. 4/15/2025 9:23:19 AM
RBD Floodplain
4/14/2025 2:33:25 PM
no comment on subterranean water line in the SFHA 4/14/2025 2:33:25 PM