Project Review Comments
- Project Name
- Red Rock Valley Estates Water District Water Transmission Lines
- Description
- Install water transmission lines along existing utility corridors between the Keeton Water Treatment Plant and the Tallent Well, one potable water line for redundancy and one raw water line for more production, no development is proposed, no grading is proposed - The disturbed area is going to be more than one acre, so I’m expecting the County will want a SWMP, ESQCP, and such.
- Location
- Parcels
- 7602400009 7602400009 7611002025 7611002025
- Applicant
-
Terra Nova Engineering, Inc.
L Doucette ( luanne.rubey@tnesinc.com )
(719) 499-6422 L Doucette ( luanne.rubey@tnesinc.com )
(719) 499-6422 - EA Number
- EA24120
- File Number
- CDR249
- Project Manager
- Charlene Durham
- Status
- Active
- Created
- 11/6/2024 4:00:22 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
PCD Engineering Division
4/29/2025 1:20:29 PM |
Letter of Intent comments | 4/29/2025 1:20:29 PM |
View |
PCD Engineering Division
4/29/2025 1:09:34 PM |
Grading and Erosion Control Plan comments | 4/29/2025 1:09:34 PM |
View |
PCD Engineering Division
4/29/2025 1:09:09 PM |
Financial Assurance Estimate comments | 4/29/2025 1:09:09 PM |
View |
PCD Engineering Division
4/29/2025 1:08:47 PM |
Construction Drawings comments | 4/29/2025 1:08:47 PM |
PCD Engineering Division
4/29/2025 1:08:16 PM |
Development Services Engineering Review 1. Comments on the following documents: - Construction Drawings - Financial Assurance Estimate - Letter of Intent Stormwater Engineering comments on the following documents: - Grading and Erosion Control Plan Note: Due to the nature and scope of comments, additional comments may be expected on the next review. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 Charlene Durham, PE, Principal Engineer charlenedurham@elpasoco.com (719) 520-7951 |
4/29/2025 1:08:16 PM | |
View |
EPC Stormwater Review
4/28/2025 4:18:03 PM |
SWMP Checklist | 4/28/2025 4:18:03 PM |
View |
EPC Stormwater Review
4/28/2025 4:17:50 PM |
SWMP | 4/28/2025 4:17:50 PM |
View |
EPC Stormwater Review
4/28/2025 4:17:37 PM |
PCM Applicability Form | 4/28/2025 4:17:37 PM |
View |
EPC Stormwater Review
4/28/2025 4:17:22 PM |
ESQCP | 4/28/2025 4:17:22 PM |
EPC Stormwater Review
4/28/2025 12:35:34 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - ESQCP - FAE.......................(to be uploaded with Development Services comments) - GEC Plan...............(to be uploaded with Development Services comments) - PCM Applicability Form - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
4/28/2025 12:35:34 PM | |
Colorado Department of Transportation - Pueblo Office
4/15/2025 9:23:19 AM |
CDOT has no comment regarding this submittal. | 4/15/2025 9:23:19 AM | |
RBD Floodplain
4/14/2025 2:33:25 PM |
no comment on subterranean water line in the SFHA | 4/14/2025 2:33:25 PM |