Citizen on Constitution Final Plat
Description
Plat for a multi-family development includes Public ROW Akers and Detention Tracts. $543,982 Credits used for Traffic Fee Program at Final plat - none due at Site Development Plan
Location
Parcels
5405000035 5405000035 5405000051 5405000051 5405104074 5405104074 5405104075 5405104075
Applicant
Kimley-Horn
Mitchell Hess ( Mitchell.Hess@kimley-horn.com ) Mitchell Hess ( Mitchell.Hess@kimley-horn.com )
File Number
ASB2443
Project Manager
Stormwater Glenn Reese
Status
Closed
Created
11/6/2024 8:30:25 AM

View: Project Documents



Review Comments (11)

Link Agency Comment
EPC DPW Asset Management
10/21/2025 2:52:05 PM
We have reviewed your case and given your circumstances, we are prepared to accept your CAD files as is, as per an email conversation of the applicant on 8/28/25.

In the future, we would like you to please deliver to us CAD files and drawings that conform to Section 5.10.5.C & D of our Engineering Criteria Manual either in Colorado State Plane Central Zone coordinates or with a layer that clearly denotes your site monuments that conform to Section 5.10.5.C of our Engineering Criteria Manual, which states:

C. Monument Caps and Data
All monuments shall be metallic caps stamped with the registered business name or the letters "L.S." followed by the registration number of the surveyor in charge. All monuments shall include state plane coordinate and elevation information meeting County GIS Standards along with any information required by State law.

Good day,
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
10/21/2025 2:52:05 PM
PCD Engineering Division
10/20/2025 9:42:38 PM
No additional comments.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
10/20/2025 9:42:38 PM
PCD Engineering Inspections
10/20/2025 8:58:18 AM
No Comments for Inspections. 10/20/2025 8:58:18 AM
View PCD Engineering Division
8/21/2025 1:14:05 PM
See comments on the following document from Development Services Engineering:
-Roadway Record Drawings (Engineering and Inspections comments)

Please provide engineering record drawings for the public storm sewer system along Akers (sheet C4.1 of Storm and Pond CDs).

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
8/21/2025 1:14:05 PM
View PCD Engineering Inspections
8/18/2025 8:20:37 AM
Please see comments in the Roadway Record Drawings
Brad Walters
Inspections Supervisor
Department of Public Works
719.520.6819
8/18/2025 8:20:37 AM
EPC Stormwater Review
8/12/2025 1:38:06 PM
Review 2: EPC DPW Stormwater comments have been resolved on the following document(s):
- Engineer Record Drawings
- Pond Certification Letter

EPC DPW Stormwater has no further comments. Once other reviewer’s comments have also been resolved, this ASB review process will be deemed complete. At that time, this ASB file will be marked as Approved/Closed on EDARP and no further action is required by the Applicant. Please finalize all other PA Punchlist items (SW punchlist is now complete, but check on the DS punchlist).

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
8/12/2025 1:38:06 PM
EPC DPW Asset Management
8/11/2025 7:43:04 AM
Please let us know what coordinate system PT-GROUND points are in. If this is a site-specific coordinate system, please convert dwg into Colorado State Plane Central coordinates.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
8/11/2025 7:43:04 AM
View EPC Stormwater Review
1/27/2025 12:22:43 PM
- Pond Certification Letter (and included as-built sheet) 1/27/2025 12:22:43 PM
EPC Stormwater Review
1/27/2025 12:22:23 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Pond Certification Letter (and included as-built sheet)

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
1/27/2025 12:22:23 PM
PCD Engineering Division
1/13/2025 9:10:06 AM
Please resubmit the entire construction drawing set with all changes redlined. It should include the crosspan on Akers and Constitution.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
1/13/2025 9:10:06 AM
PCD Engineering Inspections
1/13/2025 9:07:23 AM
Please provide a full set of as builts including the public improvements to Akers Dr. and a road certification letter.

Brad Walters
Inspections Supervisor
Department of Public Works
719.520.6819
1/13/2025 9:07:23 AM